Plan Review Details - Permit 18111124
Plan Review Stops For Permit 18111124
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-03-23 Cont ID  
Sent By dbattles Date 2019-03-23 Time 09:33 Rev Time 0.00
Received By dbattles Date 2019-03-23 Time 09:33 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-02-19 Cont ID  
Sent By dbattles Date 2019-02-19 Time 08:44 Rev Time 0.00
Received By dbattles Date 2019-02-19 Time 08:44 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-12-12 Cont ID  
Sent By dbattles Date 2018-12-12 Time 13:10 Rev Time 0.00
Received By dbattles Date 2018-12-12 Time 13:10 Sent To  
Notes
2018-12-12 13:11:02****CORRECTIONS****
 W.P.B. PERMIT: 18111124
  
 REVIEWED: DECEMBER 12, 2018
  
 DYLAN BATTLES
 BUILDING PLANS EXAMINER I
 [email protected]
 561-805-6718
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC AMENDED = FLORIDA BUILDING CODE,6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC ENERGY = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 1. [FBC 3103.2]CONSTRUCTION DOCUMENTS. A PERMIT
 APPLICATION AND CONSTRUCTION DOCUMENTS SHALL BE
 SUBMITTED FOR EACH INSTALLATION OF A TEMPORARY
 STRUCTURE. THE CONSTRUCTION DOCUMENTS SHALL INCLUDE A
 SITE PLAN INDICATING THE LOCATION OF THE TEMPORARY
 STRUCTURE AND INFORMATION DELINEATING THE MEANS OF
 EGRESS AND THE OCCUPANT LOAD.
 A) ARE THESE SALES OFFICES, OR CONSTRUCTION OFFICES?
 B) HOW LONG ARE THESE TO BE IN PLACE?
 C) AREA, OCCUPANT LOAD AND ADA ACCESS RAMP LOCATION.
 D) PROVIDE MEANS OF EGRESS/LIFE SAFETY.
  
 2. 61-41.016 DEPARTMENT INSIGNIA.
 EACH MANUFACTURED BUILDING, RE-CERTIFIED BUILDING, AND
 COMPONENTS APPROVED BY THE AGENCY SHALL BE AFFIXED WITH
 THE APPROPRIATE INSIGNIA PRIOR TO LEAVING THE
 MANUFACTURING PLANT.
 PLEASE PROVIDE THE APPROVAL FOR THE UNIT BEING
 INSTALLED.
  
 NOTE:
 -PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW
 EACH COMMENT IS BEING ADDRESSED.
 -ADDITIONAL COMMENTS MAY BE FORTHCOMING PENDING REVIEW
 OF MATERIALS REQUESTED.
 -WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED SETS
 OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS)
 SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT
 DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER
 SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID"
 OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS
 APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE
 NEED "VOID", RENDERING THEM NOT USABLE.
  

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2019-03-04 Cont ID  
Sent By jpearson Date 2019-03-04 Time 07:41 Rev Time 0.00
Received By jpearson Date 2019-03-01 Time 12:31 Sent To  
Notes
2019-03-04 07:41:37SEE ELECTRICAL PERMIT 19010033. ELECTRICAL REVIEW NOT
 REQUIRED THIS PERMIT.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-12-12 Cont ID  
Sent By jleahy Date 2018-12-12 Time 18:09 Rev Time 0.00
Received By jleahy Date 2018-12-12 Time 18:09 Sent To  
Notes
2018-12-12 18:11:43FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 NO ELECTRIC SERVICE SHOWN FOR THE TRAILER
  
 PLEASE SUBMIT A RISER DIAGRAM SHOWING LOCATION AND ALL
 EQUIPMENT INVOLVED.
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2019-03-25 Cont ID  
Sent By scaldero Date 2019-03-25 Time 10:01 Rev Time 0.00
Received By scaldero Date 2019-03-25 Time 10:01 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2018-12-13 Cont ID  
Sent By scaldero Date 2018-12-13 Time 09:33 Rev Time 0.00
Received By scaldero Date 2018-12-13 Time 09:33 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2018-12-06 Cont ID  
Sent By scaldero Date 2018-12-06 Time 10:43 Rev Time 0.00
Received By scaldero Date 2018-12-06 Time 09:43 Sent To  
Notes
2018-12-06 10:43:22PERMIT # 18111124
 REVIEW COMMENTS - FIRE DEPARTMENT
  
  
 1. SITE PLAN NOT PROVIDED. WHERE ON THE SITE IS THIS
 TRAILER GOING TO BE LOCATED. BE SURE TO INCLUDE THE
 LOCATION OF ANY ADDITIONAL TRAILERS AND/OR STRUCTURES.
  
 2. TEMPORARY CONSTRUCTION TRAILERS OR MODULAR BUILDINGS
 WILL REQUIRE A PERMIT AND COMPLIANCE WITH THE
 FOLLOWING:
 PER NFPA 241- STANDARD FOR SAFEGUARDING CONSTRUCTION,
 ALTERATION, AND DEMOLITION OPERATIONS, SECTION 4.2:
 TEMPORARY OFFICES, TRAILERS, AND OTHER FACILITIES OF
 COMBUSTIBLE CONSTRUCTION OR HOUSING COMBUSTIBLE
 CONTENTS SHALL BE SEPARATED FROM ADJACENT BUILDINGS,
 TRAILERS OR STRUCTURES IN ACCORDANCE WITH TABLE 4.2.1.
 PER TABLE 4.2.1:
 1) 20 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 30 FEET
 2) 30 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 35 FEET
 3) 40 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 40 FEET
 4) 50 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 45 FEET
 5) 60 FEET EXPOSED LENGTH SHALL BE SEPARATED FROM
 ADJACENT STRUCTURES BY AT LEAST 50 FEET
 6) GREATER THAN 60 FEET EXPOSED LENGTH SHALL BE
 SEPARATED FROM ADJACENT STRUCTURES BY AT LEAST 60 FEET
 **A 75 PERCENT REDUCTION IN SEPARATION DISTANCES SHALL
 BE PERMITTED TO BE APPLIED, PROVIDED AUTOMATIC
 SPRINKLER PROTECTION IS USED IN THE EXPOSING STRUCTURE.
  
  
 THANK YOU,
 SUE ELLEN CALDERON
 ASSISTANT FIRE MARSHAL
 FIRE INVESTIGATOR & INSPECTOR
 OFFICE OF THE FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 [email protected]
 (561) 804-4751
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-04-03 Cont ID  
Sent By cpuell Date 2019-04-03 Time 11:29 Rev Time 0.00
Received By cpuell Date 2019-03-15 Time 16:20 Sent To  
Notes
2019-03-18 16:20:59B31

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-03-07 Cont ID  
Sent By jesmith Date 2019-03-07 Time 15:14 Rev Time 0.00
Received By jesmith Date 2019-03-07 Time 15:14 Sent To  
Notes
2019-02-14 13:09:53B12

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-01-08 Cont ID  
Sent By gjohnson Date 2019-01-08 Time 18:13 Rev Time 0.00
Received By gjohnson Date 2018-11-28 Time 15:41 Sent To  
Notes
2018-11-29 15:41:11B05

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2018-12-05 Cont ID  
Sent By ccole Date 2018-12-05 Time 17:50 Rev Time 0.00
Received By ccole Date 2018-12-05 Time 17:50 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2019-03-29 Cont ID  
Sent By thunt Date 2019-03-29 Time 09:32 Rev Time 0.00
Received By thunt Date 2019-03-29 Time 09:31 Sent To  
Notes
2019-03-29 09:32:49PROVIDE PUMP OUT SCHDULE OF HOLDING TANK TO INSPECTOR
 ON 1ST INSPECTION. TLH

Review Stop P PLUMBING
Rev No 2 Status F Date 2019-03-07 Cont ID  
Sent By jesmith Date 2019-03-07 Time 15:13 Rev Time 0.00
Received By jesmith Date 2019-03-07 Time 15:12 Sent To  
Notes
2019-03-07 15:13:13CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RES = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2017 6TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION
 FBC FG = FLORIDA FUEL GAS CODE 2017 6TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 2ND REVIEW: DENIED
 PLUMBING COMMENTS:
 1. PROVIDE SITE PLAN SHOWING SANITARY SEWER OR
 TEMPORARY HOLDING TANKS AND WATER SERVICE WITH BACKFLOW
 PER WPB FBC 107.2.1; 2ND REQUEST.
 2. PLACE NOTE ON PLAN SEPARATE PERMIT REQUIRED FOR
 BACKFLOW DEVICE PER WPB UTILITIES DEPPARTMENT; 2ND
 REQUEST
 END OF PLUMBING COMMENTS
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 (STAMPED/SEALED AND SIGNED BY DESIGNER OF RECORD IN
 ACCORDANCE WITH FS 471 FAC 61G15) INTO THE ORIGINAL
 SUBMITTAL AND REMOVE THE PREVIOUSLY REVIEWED SHEETS.
 ONE COPY OF THE PREVIOUSLY REVIEWED SHEETS SHOULD
 REMAIN IN PACKAGE AND BE MARKED "VOID".
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 PHONE 561-805-6715

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-01-08 Cont ID  
Sent By gjohnson Date 2019-01-08 Time 18:08 Rev Time 0.00
Received By gjohnson Date 2019-01-08 Time 18:08 Sent To  
Notes
2019-01-08 18:12:581ST REVIEW:
 2017 FLORIDA BUILDING CODE 6TH EDITION
 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH
 EDITION
  
 PLUMBING COMMENTS:
  
 1. PROVIDE SITE PLAN SHOWING SANITARY SEWER OR
 TEMPORARY HOLDING TANKS AND WATER SERVICE WITH
 BACKFLOW. PER AMEND TO FBC 107.2.1
  
 2. PLACE NOT ON PLAN SEPARATE PERMIT REQUIRED FOR
 BACKFLOW DEVICE. PER WPB UTILITIES DEPT.
  
 3. PROVIDE STATE CERTIFICATION FOR TRAILER. PER AMEND
 TO FBC 107.2.1
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
  
  
  

Review Stop Z ZONING
Rev No 3 Status P Date 2019-04-03 Cont ID  
Sent By jroach Date 2019-04-03 Time 09:51 Rev Time 0.00
Received By jroach Date 2019-04-03 Time 09:49 Sent To  
Notes
2019-04-03 09:51:31ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 02.25.2019
 PERMIT NO.: 18111124
 ___________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ___________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. TEMPORARY CONSTRUCTION OFFICES, STORAGE BUILDINGS,
 TRAILERS, ETC. SHALL BE REMOVED WITHIN SEVEN (7) DAYS
 OF THE FINAL CONSTRUCTION INSPECTION BY THE CITY AND
 PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
  
 E: [email protected]
  
 W: WPB.ORG
  

Review Stop Z ZONING
Rev No 2 Status P Date 2019-02-25 Cont ID  
Sent By jroach Date 2019-02-25 Time 12:12 Rev Time 0.00
Received By jroach Date 2019-02-25 Time 12:12 Sent To  
Notes
2019-02-25 12:12:42ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 02.25.2019
 PERMIT NO.: 18111124
 ___________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ___________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. SEPARATE PERMIT REQUIRED FOR THE PARKING LOT.
  
 REGARDING THE LOT, PLEASE CLARIFY IF THIS IS A
 TEMPORARY LOT? IF SO, IT WILL BE REQUIRED TO BE REMOVED
 AT THE SAME TIME AS THE CONSTRUCTION TRAILER (SEE
 COMMENT #2 BELOW). IF THIS LOT IS PROPOSED TO REMAIN, A
 MINOR AMENDMENT TO THE PLANNED DEVELOPMENT WILL BE
 REQUIRED AND THE IMPROVEMENTS WILL NEED TO BE INSTALLED
 IN ACCORDANCE WITH THE CITY?S ZONING AND LAND
 DEVELOPMENT REGULATIONS (INCLUDING LANDSCAPING,
 CURBING, ETC.).
  
 2. TEMPORARY CONSTRUCTION OFFICES, STORAGE BUILDINGS,
 TRAILERS, ETC. SHALL BE REMOVED WITHIN SEVEN (7) DAYS
 OF THE FINAL CONSTRUCTION INSPECTION BY THE CITY AND
 PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
  
 E: [email protected]
  
 W: WPB.ORG
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-12-21 Cont ID  
Sent By jroach Date 2018-12-21 Time 11:51 Rev Time 0.00
Received By jroach Date 2018-12-21 Time 11:05 Sent To  
Notes
2018-12-21 11:51:16ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 12.21.2018
 PERMIT NO.: 18111124
 ___________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ___________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. SEPARATE PERMIT REQUIRED FOR THE PARKING LOT.
  
 REGARDING THE LOT, PLEASE CLARIFY IF THIS IS A
 TEMPORARY LOT? IF SO, IT WILL BE REQUIRED TO BE REMOVED
 AT THE SAME TIME AS THE CONSTRUCTION TRAILER (SEE
 COMMENT #2 BELOW). IF THIS LOT IS PROPOSED TO REMAIN, A
 MINOR AMENDMENT TO THE PLANNED DEVELOPMENT WILL BE
 REQUIRED AND THE IMPROVEMENTS WILL NEED TO BE INSTALLED
 IN ACCORDANCE WITH THE CITY?S ZONING AND LAND
 DEVELOPMENT REGULATIONS (INCLUDING LANDSCAPING,
 CURBING, ETC.).
  
 2. TEMPORARY CONSTRUCTION OFFICES, STORAGE BUILDINGS,
 TRAILERS, ETC. SHALL BE REMOVED WITHIN SEVEN (7) DAYS
 OF THE FINAL CONSTRUCTION INSPECTION BY THE CITY AND
 PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
  
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved