| 2018-12-10 14:27:43 | 1) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER ) TO THE MOST REMOTE OUTLET IN THE BUILDING AND / |
| | OR SYSTEM PER THE 2017 FBC-FUEL GAS SEC.402.4.1, |
| | 402.4.2, OR 2017 FBC-RES. SEC. G 2413.4.1, G2413.4.2. |
| | 2) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE RANGE |
| | PER THE 2017 FBC-FUEL GAS CODE SEC.304.1, OR 2017 |
| | FBC-RES. SEC.G 2407.1. |
| | 3) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3 |
| | THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3. |
| | 4) SUBMIT TWO COPIES OF THE MANUFACTURER?S |
| | SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54, |
| | NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND |
| | 301.3 OR 2017 FBC-RES. SEC. G2404.3. GAS APPLIANCES |
| | SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS |
| | FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT |
| | THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES. |
| | SEC.G2408.1. |
| | 5) SHOW THE CORRESPONDING EHD NUMBER OF THE CORRUGATED |
| | STAINLESS STEEL TUBING FOR EACH PIPE SIZE. WPB |
| | AMENDMENTS TO FBC SEC.107.2.1. |
| | 6) INDICATE ON THE GAS RISER WHICH PIPE IS CSST AND |
| | WHICH IS GALVANIZED. WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | 7) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| | LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| | AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| | RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| | HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| | DRAWN. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 8) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL |
| | GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1) |
| | THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8, |
| | G2413.1, G2413.2, & G2413.3. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |