| 2018-12-07 14:54:38 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | [email protected], 561-805-6716 |
| | |
| | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | FBC R = FBC RESIDENTIAL |
| | |
| | |
| | 1.ONE COPY OF EACH PRODUCT APPROVAL WAS SUBMITTED; |
| | HOWEVER, TWO COPIES ARE REQUIRED FOR EACH PERMIT |
| | APPLICATION. |
| | 107.1 GENERAL. SUBMITTAL DOCUMENTS CONSISTING OF |
| | CONSTRUCTION DOCUMENTS, STATEMENT OF SPECIAL |
| | INSPECTIONS, GEOTECHNICAL REPORT AND OTHER DATA SHALL |
| | BE SUBMITTED IN TWO OR MORE SETS WITH EACH PERMIT |
| | APPLICATION. THE CONSTRUCTION DOCUMENTS SHALL BE |
| | PREPARED BY A REGISTERED DESIGN PROFESSIONAL WHERE |
| | REQUIRED BY CHAPTER 471, FLORIDA STATUTES & 61G15 |
| | FLORIDA ADMINISTRATIVE CODE OR CHAPTER 481, FLORIDA |
| | STATUTES & 61G1 FLORIDA ADMINISTRATIVE CODE. WHERE |
| | SPECIAL CONDITIONS EXIST, THE |
| | BUILDING OFFICIAL IS AUTHORIZED TO REQUIRE ADDITIONAL |
| | CONSTRUCTION DOCUMENTS TO BE PREPARED BY A REGISTERED |
| | DESIGN PROFESSIONAL. ELECTRONIC MEDIA DOCUMENTS SHALL |
| | BE SUBMITTED WHEN REQUIRED BY THE BUILDING OFFICIAL AND |
| | MAY REQUIRE ONLY ONE SET OF SUBMITTALS. |
| | |
| | 2.PRODUCT APPROVAL NOA NO. 17-1102.24 SPECIFY IS FOR |
| | ?SMALL MISSILE IMPACT RESISTANT?. THE APPLICABLE CODE |
| | REQUIRED LARGE IMPACT RESISTANT. |
| | R301.2.1.2 PROTECTION OF OPENINGS. GLAZED OPENINGS IN |
| | BUILDINGS LOCATED IN WINDBORNE DEBRIS REGIONS SHALL BE |
| | PROTECTED FROM WINDBORNE DEBRIS. GLAZED OPENING |
| | PROTECTION FOR WINDBORNE DEBRIS SHALL MEET THE |
| | REQUIREMENTS OF THE LARGE MISSILE TEST OF ASTM E 1996 |
| | AND ASTM E 1886 REFERENCED THEREIN, SSTD 12, TAS 201, |
| | 202 AND 203 OR AAMA 506, AS APPLICABLE. |
| | |
| | 3. PROVIDE PLAN SHOWING LOCATION OF WINDOWS WITH |
| | DIMENSIONS OF ROUGH OPENINGS. IF NO CHANGES ARE TO BE |
| | MADE TO THE ROUGH OPENINGS, PROVIDE STATEMENT THAT |
| | WINDOWS WILL BE LIKE FOR LIKE. IF OPENINGS ARE ALTERED, |
| | PROVIDE FRAMING PLAN PER FBCR CHAPTER 6. |
| | |
| | |
| | |