Plan Review Stops For Permit 18110692
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-03-18 Cont ID  
Sent By rmcdouga Date 2019-03-18 Time 06:17 Rev Time 0.00
Received By rmcdouga Date 2019-03-12 Time 07:41 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-01-03 Cont ID  
Sent By rmcdouga Date 2019-01-03 Time 15:56 Rev Time 0.00
Received By rmcdouga Date 2019-01-03 Time 15:56 Sent To  
Notes
2019-01-03 16:07:39PLAN
 REVIEW COMMENTS
 (REVISIONS TO MASTER PERMIT #17120261)
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE PROJECT NORTH REORIENTATION IS IN CORRECT. THE
 HITTING BAYS FACE TOWARD AUSTRAILIAN AVE. WHICH IS TO
 THE EAST OF THE STRUCTURE. PLEASE CORRECT ON REVISED
 SHEETS A2-01-A THROUGH A4-04-2
  
 2) A WALK-IN COOLER IS SHOWN IN THE LIQUOR STORAGE AREA
 ON SHEET A2-03-B, BUT IS NOT SHOWN ON THE OTHER UPPER
 LEVEL PLANS. PLEASE CLARIFY.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-03-18 Cont ID  
Sent By jpearson Date 2019-03-18 Time 11:22 Rev Time 0.00
Received By jpearson Date 2019-03-18 Time 11:13 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-12-21 Cont ID  
Sent By jpearson Date 2018-12-21 Time 09:38 Rev Time 0.00
Received By jpearson Date 2018-12-21 Time 09:38 Sent To  
Notes
2018-12-21 09:38:26CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. NARRATIVE AND PLAN SHOW SEVERAL ITEMS BEING ADDED,
 BUT THE REVISION SUBMITTAL DOES NOT INCLUDE ANY
 INCREASE IN VALUE FOR THIS WORK. PROVIDE BREAKDOWN
 SHOWING TOTAL COST OF CHANGES. WPB FBC 109.3
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-03-04 Cont ID  
Sent By pleduc Date 2019-03-04 Time   Rev Time 0.00
Received By pleduc Date 2019-02-28 Time 13:38 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-12-18 Cont ID  
Sent By pleduc Date 2018-12-18 Time   Rev Time 0.00
Received By pleduc Date 2018-12-17 Time 16:10 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-03-26 Cont ID  
Sent By jesmith Date 2019-03-26 Time 09:19 Rev Time 0.00
Received By jesmith Date 2019-03-26 Time 09:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-01-11 Cont ID  
Sent By gjohnson Date 2019-01-11 Time 15:15 Rev Time 0.00
Received By gjohnson Date 2018-12-04 Time 09:53 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2019-03-25 Cont ID  
Sent By ccole Date 2019-03-25 Time 17:37 Rev Time 0.00
Received By ccole Date 2019-03-25 Time 16:41 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-12-26 Cont ID  
Sent By ccole Date 2018-12-26 Time 17:02 Rev Time 0.00
Received By ccole Date 2018-12-26 Time 15:39 Sent To  
Notes
2018-12-26 17:11:111ST REVIEW FBC-2017 MECHANICAL
 REVISION #18110692
 MASTER PERMIT #17120261
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEETS M2-2-A, M2-2-B, M2-3A, M8-1, AND MEPO-1 THAT
 ARE LISTED IN THE NARRATIVE WERE NOT UPLOADED IN THE
 SETS FOR REVIEW. PLEASE PROVIDE THE SHEETS.
  
 2) M2-1-B: PLEASE SHOW THE CLEARANCE DISTANCE BETWEEN
 THE WATER HEATER AIR INTAKE AND EXHAUST TERMINATION-
 SECTION 503.8 FBC FG.
  
 3) COMMENTS #1 & 2 FROM THE MECHANICAL REVIEW FOR
 REVISON #18100350 STILL EXIST. I HAVE COPIED THEM BELOW
 AS THEY APPLY TO THIS REVISION ALSO.
  
 1) PLEASE PROVIDE AN ITEMIZED LIST OF ADDITIONAL
 MECHANICAL EQUIPMENT AND LABOR COSTS FOR THE NEW
 OSCILLATING FANS, THE AIR CURTAINS, AND LARGER MODEL
 IRH UNITS.
  
 2) SHOW THE HEIGHTS OF THE NEW FANS AND HEATERS FROM
 THE FINISH FLOOR TO THE BOTTOM OF THE UNITS- SECTION
 1003.3 FBC B.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-03-26 Cont ID  
Sent By gjohnson Date 2019-03-26 Time 09:17 Rev Time 0.00
Received By jesmith Date 2019-03-21 Time 08:37 Sent To  
Notes
2019-03-26 09:17:33APPROVED

Review Stop P PLUMBING
Rev No 1 Status P Date 2019-01-11 Cont ID  
Sent By gjohnson Date 2019-01-11 Time 15:15 Rev Time 0.00
Received By gjohnson Date 2019-01-11 Time 15:15 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2019-03-26 Cont ID  
Sent By cpuell Date 2019-03-26 Time 16:47 Rev Time 0.00
Received By cpuell Date 2019-03-26 Time 16:47 Sent To  
Notes
2019-03-26 09:18:32PLUMBING SHEETS OK
2019-03-18 11:03:42ELECTRICAL SHEETS OK.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2018-12-21 Cont ID  
Sent By jpearson Date 2018-12-21 Time 08:32 Rev Time 0.00
Received By jpearson Date 2018-12-21 Time 08:32 Sent To  
Notes
2018-12-21 08:31:59EACH SHEET OF PLAN IS REQUIRED TO BE SIGNED AND SEALED
 BY THE PERSON RESPONSIBLE FOR THE DESIGN. A DIGITAL
 PLAN REQUIRES A DIGITAL SIGNATURE. PROVIDE CORRECTION
 FOR SHEETS A8-03, A8-08, AND A8-09. WPB FBC 107.1; FS
 471/481

Review Stop Z ZONING
Rev No 2 Status P Date 2019-03-08 Cont ID  
Sent By hmtribou Date 2019-03-08 Time 10:58 Rev Time 0.00
Received By hmtribou Date 2019-03-08 Time 10:58 Sent To I
Notes
2019-03-08 10:59:06ORD. 4745-17
 RESO. 350-17
 PROJECT NAME: DRIVE SHACK
  
 ZONING CONTACT: HEATHER DANFORTH
  (561) 822-1562
  [email protected]
  
  
  
 GENERAL COMMENTS
  
 --SEPARATE PERMITS ARE REQUIRED FOR FENCE/SITE
 WALLS/NETTING; DUMPSTER ENCLOSURES; SIGNAGE; LANDSCAPE;
 PARKING; BIKE RACKS/ HARDSCAPE; AND SITE LIGHTING.
  
 -- THE RECONFIGURATION OF DRIVEWAYS AT THE AIRPORT
 SOUTH OF FLORIDA MANGO ROAD AND THE NEW CIRCULAR DRIVE,
 INCLUDING ALL ENTRIES TO THE SITE, MUST HAVE COMPLETED
 CONSTRUCTION BEFORE FINAL INSPECTIONS.
  
 --PERMIT HAS NOT BEEN SUBMITTED FOR CITY SIGNAGE.
  
 --MAJOR AMENDMENT SCHEDULED FOR CITY COMMISSION 3/11/19
  
 --MINOR AMENDMENT COMMENTS SUBMITTED 2/25/19
  
 --PROVIDE UPDATED PHOTOMETRIC PLAN TO MEET 94-207(D)(8)
 WHICH INCLUDES THE SPORTS LIGHTING ON THE ROOF AND NEW
 BUILDING LIGHTING IN MINOR AMENDMENT RESUBMITTAL.
  
 --PLEASE PROVIDE FAA APPROVAL OF POLE HEIGHT BY PALM
 BEACH COUNTY DEPARTMENT OF AIRPORTS BEFORE PERMIT
 APPROVAL.
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-12-12 Cont ID  
Sent By hmtribou Date 2018-12-12 Time 16:22 Rev Time 0.00
Received By hmtribou Date 2018-12-12 Time 16:22 Sent To  
Notes
2018-12-12 16:27:36PERMIT #18110692
 ORD. 4745-17
 RESO. 350-17
 PROJECT NAME: DRIVE SHACK
  
 ZONING CONTACT: HEATHER M. TRIBOU
  (561) 822-1562
  [email protected]
  
  
  
 GENERAL COMMENTS
  
 --BUILDING SIZE AND SIDEWALK LOCATIONS DIFFERS FROM
 APPROVED PLANS AND WILL REQUIRE A MINOR SITE PLAN
 AMENDMENT BEFORE CERTIFICATE OF OCCUPANCY.
  
 --SEPARATE PERMITS ARE REQUIRED FOR FENCE/SITE WALLS
 AND FENCING /NETTING; DUMPSTER ENCLOSURES; SIGNAGE;
 LANDSCAPE; PARKING; BIKE RACKS/ HARDSCAPE; AND SITE
 LIGHTING.
  
 --THE NEW WPB SIGN MUST BE INSTALLED BEFORE CERTIFICATE
 OF OCCUPANCY.
  
 -- THE RECONFIGURATION OF DRIVEWAYS AT THE AIRPORT
 SOUTH OF FLORIDA MANGO ROAD AND THE NEW CIRCULAR DRIVE,
 INCLUDING ALL ENTRIES TO THE SITE, MUST HAVE COMPLETED
 CONSTRUCTION BEFORE FINAL INSPECTIONS.
  