| 2019-01-30 11:02:59 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 |
| | PROJECT: PAYNE CHAPEL LANDSCAPE PERMIT 18110466 |
| | JANUARY 30, 2019 |
| | I HAVE REVIEWED THE ABOVE REFERENCED PERMIT, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | 1. LANDSCAPE PLAN NEEDS TO BE MOVED FROM MAIN PERMIT |
| | 18110465 TO THIS PERMIT 18110466 IN PROJECT DOX. AS A |
| | COURTESY, THE LANDSCAPE PLAN WAS REVIEWED, AND THE |
| | FOLLOWING COMMENTS ARE TO BE ADDRESSED. |
| | |
| | 2. UPDATE THE FLORIDA FRIENDLY LANDSCAPE DESIGN OPTIONS |
| | CHART TO CURRENT CODE SECTION 94-446 (G) FOR ALL |
| | OPTIONS. |
| | |
| | 3. ON THE LANDSCAPE REQUIREMENTS CHART, CORRECT THE |
| | SITE LANDSCAPE CALCULATIONS TO SHOW THE SHADE TREE AND |
| | FLOWERING TREE CALCULATIONS BASED ON 40% OPEN SPACE. |
| | |
| | 4. SHOW THE CALCULATIONS FOR LANDSCAPE BUFFER FOR |
| | REQUIRED TREES AND HEDGES. |
| | |
| | 5. SHOW THE LOCATIONS OF ALL LANDSCAPE BUFFERS ON THE |
| | LANDSCAPE AND SITE PLAN. |
| | |
| | 6. PROVIDE THE REQUIRED TERMINAL LANDSCAPE ISLAND AT |
| | THE END OF EACH ROW OF PARKING WITH THE REQUIRED TREE. |
| | |
| | 7. FOR THE DUMPSTER, PROVIDE THE REQUIRED HEDGE AROUND |
| | THE WEST SIDE OF THE ENCLOSURE. THIS CAN BE COMBINED |
| | WITH THE REQUIRED TERMINAL LANDSCAPE ISLAND AND TREE. |
| | |
| | 8. ACCURATELY SHOW THE CONCRETE ACCESS APRON FROM THE |
| | CURB TO THE SIDEWALK FROM DIVISION AVE. INTO THE |
| | PARKING LOT. |
| | |
| | 9. SHOW COMPLIANCE WITH SECTION 94-445 L. PLANT |
| | SPECIES. A MINIMUM OF 60 PERCENT OF PLANT MATERIAL |
| | ADDED SHALL BE FLORIDA NATIVE OR DROUGHT TOLERANT |
| | SPECIES SELECTED FROM THE CITY LIST OR THE LIST OF |
| | SPECIES IN THE MOST RECENT EDITION OF SOUTH FLORIDA |
| | WATER MANAGEMENT DISTRICT WATERWISE SOUTH FLORIDA |
| | LANDSCAPES. |
| | |
| | 10. PLEASE SHOW LOCATIONS OF WATER, SEWER, FIRE LINES, |
| | DRAINAGE LINES AND FPL TRANSFORMERS ON THE LANDSCAPE |
| | PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. |
| | |
| | |
| | |