Plan Review Details - Permit 18110316
Plan Review Stops For Permit 18110316
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-01-09 Cont ID  
Sent By rmcdouga Date 2019-01-09 Time 09:18 Rev Time 0.00
Received By rmcdouga Date 2019-01-09 Time 07:24 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-12-13 Cont ID  
Sent By rmcdouga Date 2018-12-13 Time 07:48 Rev Time 0.00
Received By rmcdouga Date 2018-12-13 Time 07:45 Sent To I
Notes
2018-12-13 07:48:04PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE ENGINEER'S HANDWRITTEN SIGNATURE AND SEAL IS
 REQUIRED ON THE GENERATOR PAD PLANS. FAC 61G15-23.003
 PROCEDURES FOR PHYSICALLY SIGNING AND SEALING PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
 ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER
 DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN
 ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025,
 F.S., AND RULE 61G15-23.001, F.A.C. MUST BE PHYSICALLY
 SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE
 PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE.
 (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE
 LICENSEE'S SIGNATURE ON EACH PAGE REQUIRED TO BE
 SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR
 COPIED IMAGE OF THE LICENSEE'S SIGNATURE SHALL NOT BE
 USED.
 (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY
 CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY
 OVERLAPPING THE LICENSEE'S SIGNATURE ON EACH PAGE
 REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL
 NOT RENDER THE SIGNATURE ILLEGIBLE.
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-01-09 Cont ID  
Sent By jleahy Date 2019-01-09 Time 17:15 Rev Time 0.00
Received By jleahy Date 2019-01-09 Time 17:15 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-12-04 Cont ID  
Sent By jleahy Date 2018-12-04 Time 17:53 Rev Time 0.00
Received By jleahy Date 2018-12-04 Time 17:53 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-11-20 Cont ID  
Sent By fgiaquin Date 2018-11-20 Time 06:01 Rev Time 0.00
Received By fgiaquin Date 2018-11-20 Time 05:38 Sent To G
Notes
2018-11-20 05:44:46ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. PROVIDE ACCURATE LOAD CALCULATION INCLUDING ALL
 LOADS. LOAD CALC SHOWS "1- ELECTRIC CAR CHARGER" WITH
 ZERO WATTS AS LOAD. NEC 220; FBC RE E3602.2
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO III
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WEST PALM BEACH
 [email protected]
 CELL: 561-657-1653
  

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2018-12-03 Cont ID  
Sent By tklarge Date 2018-12-03 Time 10:38 Rev Time 0.00
Received By tklarge Date 2018-12-03 Time 10:38 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-01-09 Cont ID  
Sent By jleahy Date 2019-01-09 Time 17:16 Rev Time 0.00
Received By jleahy Date 2018-12-19 Time 11:47 Sent To  
Notes
2018-12-20 11:47:53ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-12-13 Cont ID  
Sent By rmcdouga Date 2018-12-13 Time 07:48 Rev Time 0.00
Received By rmcdouga Date 2018-11-07 Time 12:59 Sent To  
Notes
2018-11-08 13:01:12ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2019-01-07 Cont ID  
Sent By mcruz Date 2019-01-07 Time 16:01 Rev Time 0.00
Received By mcruz Date 2019-01-07 Time 15:59 Sent To E
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2018-11-14 Cont ID  
Sent By mcruz Date 2018-11-14 Time 15:44 Rev Time 0.00
Received By mcruz Date 2018-11-14 Time 15:38 Sent To  
Notes
2018-11-14 15:44:19ZONING REVIEW FAILED, DUE TO THE FOLLOWING:
  
 1) PURSUANT TO 94-305(B)(4) - MECHANICAL EQUIPMENT MAY
 NOT PROJECT MORE THAN 4 FEET INTO A SETBACK. GENERATOR
 SHALL BE AT LEAST 6 FEET FROM EAST PROPOERTY LINE,
 SURVEY SUBMITTED SAYS 5' FEET.
  
 FOR ADDITIONAL INFORMATION, THE ZONING AND LAND
 DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT
 WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH
 PLANNING DEPARTMENT WEBSITE AT
 WWW.CITYOFWPB.COM/PLAN/INDEX.HTM.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved