Plan Review Details - Permit 18110298
Plan Review Stops For Permit 18110298
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-12-03 Cont ID  
Sent By rmcdouga Date 2018-12-03 Time 06:46 Rev Time 0.00
Received By rmcdouga Date 2018-12-03 Time 06:46 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-11-29 Cont ID  
Sent By jleahy Date 2018-11-29 Time 18:36 Rev Time 0.00
Received By jleahy Date 2018-11-29 Time 18:36 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-12-05 Cont ID  
Sent By tklarge Date 2018-12-05 Time 08:38 Rev Time 0.00
Received By tklarge Date 2018-12-05 Time 08:17 Sent To  
Notes
2018-12-05 08:39:59A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT IS REQUIRED FOR A
 CONTRACTOR TO PERFORM THE RELATED WORK. PROVIDE
 COMPLETE PLANS THAT REFLECT THE ENTIRE SCOPE OF GAS
 WORK TO BE DONE. WPB AMEND. TO FBC SEC.107.2.1.
  
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE
 FBC-R, SEC. G2404.3.
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL
 GAS SEC. 301.3.
  
 A SEPARATE PERMIT IS REQUIRED FOR THE GAS INSTALLATION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-12-26 Cont ID  
Sent By tklarge Date 2018-12-26 Time 06:58 Rev Time 0.00
Received By tklarge Date 2018-12-12 Time 13:33 Sent To  
Notes
2018-12-13 13:34:09RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-12-05 Cont ID  
Sent By tklarge Date 2018-12-05 Time 08:50 Rev Time 0.00
Received By tklarge Date 2018-11-13 Time 10:18 Sent To  
Notes
2018-11-14 10:18:09ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-12-26 Cont ID  
Sent By tklarge Date 2018-12-26 Time 06:58 Rev Time 0.00
Received By tklarge Date 2018-12-26 Time 06:48 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-12-05 Cont ID  
Sent By tklarge Date 2018-12-05 Time 08:50 Rev Time 0.00
Received By tklarge Date 2018-12-05 Time 08:17 Sent To I
Notes
2018-12-05 08:50:111) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION
 ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT
 REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED
 THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET
 FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS
 MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING
 SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER,
 FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT
 THE PUMP.
 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9,
 4.4.9.1
 3) GAS FIRED POOL HEATERS SHALL HAVE A MINIMUM THERMAL
 EFFICIENCY OF 82% PER THE 2017 FBC-ENERGY SEC.
 R403.10.4. THE SUBMITTED SPECS DO NOT SHOW THIS.
 4) SHT. 2 - APSP/ANSI -15 BOX NOTES NO HEATER YET THE
 PIPING SCHEMATIC SHOWS A HEATER. IS ONE BEING INSTALLED
 OR NOT? IF NOT REVISE THE NOTE.
 5) SHT. 1 - THE EQUIPMENT SPECS CALL OUT PUMP MODEL
 VSSHP270AUT AND SHT. 2 PIPING SCHEMATIC CALLS OUT PUMP
 VSSHP220AUT. CLARIFY.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-11-20 Cont ID  
Sent By mcruz Date 2018-11-20 Time 08:48 Rev Time 0.00
Received By mcruz Date 2018-11-20 Time 08:45 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved