Plan Review Details - Permit 18110028
Plan Review Stops For Permit 18110028
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-02-20 Cont ID  
Sent By pvalenti Date 2019-02-20 Time 17:26 Rev Time 0.00
Received By pvalenti Date 2019-02-20 Time 17:26 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-12-04 Cont ID  
Sent By pvalenti Date 2018-12-04 Time 14:46 Rev Time 0.00
Received By pvalenti Date 2018-12-04 Time 14:46 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-02-20 Cont ID  
Sent By rrossano Date 2019-02-20 Time   Rev Time 0.00
Received By   Date 2019-02-20 Time   Sent To B
Notes
2019-02-20 09:54:08PASSED WITH PROVISO:
 IT IS UNDERSTOOD BY THE CITY THAT OPERATIONAL LOGISTICS
 FOR SANITATION PICKUP WILL BE HANDLED BY THE PROPERTY
 OWNER.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2018-11-13 Cont ID  
Sent By rrossano Date 2018-11-13 Time   Rev Time 0.00
Received By rrossano Date 2018-11-13 Time   Sent To B
Notes
2018-11-13 09:48:391) DUMPSTER LOADING AREA SHALL HAVE 10' CONCRETE
 SURFACE FOR TRUCK TO APPROACH. TYPICALLY ASPHALT IS
 USED IN THE AREA APPROACHING THE DUMPSTER AND IT
 QUICKLY DETERIORATES DUE TO THE FRONT WHEELS OF THE
 SANITATION VEHICLE.
 2) THERE ARE WATER AND SEWER LINES IN THE VICINITY OF
 THIS PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE
 STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES AT
 LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY
 CONSTRUCTION OR DEMOLITION WORK. MORE INFORMATION CAN
 BE FOUND HERE: HTTP://WWW.SUNSHINE811.COM/
  
  
  
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-02-20 Cont ID  
Sent By pvalenti Date 2019-02-20 Time 17:26 Rev Time 0.00
Received By pvalenti Date 2019-02-08 Time 13:55 Sent To  
Notes
2019-02-11 13:55:48RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-12-04 Cont ID  
Sent By pvalenti Date 2018-12-04 Time 14:46 Rev Time 0.00
Received By pvalenti Date 2018-11-01 Time 13:57 Sent To I
Notes
2018-11-02 13:57:34ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2019-02-14 Cont ID  
Sent By mcruz Date 2019-02-14 Time 16:37 Rev Time 0.00
Received By mcruz Date 2019-02-14 Time 16:34 Sent To ENG
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2018-11-09 Cont ID  
Sent By mcruz Date 2018-11-09 Time 15:22 Rev Time 0.00
Received By mcruz Date 2018-11-07 Time 15:16 Sent To ENG
Notes
2018-11-09 15:22:29ZONING REVIEW FAILED, DUE TO THE FOLLOWING:
  
 1) PLANS FOR THE LAYOUT OF TRASH RECEPTACLES SHALL BE
 IN ACCORDANCE WITH THE MINIMUM REQUIREMENTS SET FORTH
 IN FIGURE XIV-3 (ENCLOSED).
 2) WALLS MUST BE LANDSCAPED WITH SHRUBS AND HEDGES
 PLANTED AT TWO (2) FEET INTERVALS.
 3) PURSUANT TO ACHITECTURAL STANDARDS OF THE BROADWAY
 MIXED USE DISTRICT TYPE I ZONING DISTRICT, THE
 ENCLOSURE SHALL BE A STRUCTURE CONSISTENT WITH THE
 ARCHITECTURE OF THE BUILDING.
  
 FOR ADDITIONAL INFORMATION, THE ZONING AND LAND
 DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT
 WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH
 PLANNING DEPARTMENT WEBSITE AT
 WWW.CITYOFWPB.COM/PLAN/INDEX.HTM.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved