Plan Review Details - Permit 18110009
Plan Review Stops For Permit 18110009
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-11-09 Cont ID  
Sent By rmcdouga Date 2018-11-09 Time 06:49 Rev Time 0.00
Received By rmcdouga Date 2018-11-09 Time 06:49 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-11-15 Cont ID  
Sent By jleahy Date 2018-11-15 Time 12:22 Rev Time 0.00
Received By jleahy Date 2018-11-15 Time 12:22 Sent To  
Notes
2018-11-15 12:23:58FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 PROVISO
  
 SUBMIT BEFORE FINAL INSPECTIO CUT SHEETS FOR THE
 FOLLOWING
  
 POOL PUMP
  
 POOL LIGHT

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-11-27 Cont ID  
Sent By tklarge Date 2018-11-27 Time 06:21 Rev Time 0.00
Received By tklarge Date 2018-11-27 Time 06:21 Sent To  
Notes
2018-11-27 06:24:22THERE IS NO GAS BEING INSTALLED FOR THIS POOL.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-12-18 Cont ID  
Sent By tklarge Date 2018-12-18 Time 10:20 Rev Time 0.00
Received By tklarge Date 2018-11-29 Time 14:28 Sent To  
Notes
2018-11-30 14:29:04RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-11-27 Cont ID  
Sent By tklarge Date 2018-11-27 Time 06:21 Rev Time 0.00
Received By tklarge Date 2018-11-01 Time 13:22 Sent To  
Notes
2018-11-02 13:22:36ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-12-18 Cont ID  
Sent By tklarge Date 2018-12-18 Time 10:19 Rev Time 0.00
Received By tklarge Date 2018-12-18 Time 10:08 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-11-27 Cont ID  
Sent By tklarge Date 2018-11-27 Time 06:21 Rev Time 0.00
Received By tklarge Date 2018-11-27 Time 05:48 Sent To I
Notes
2018-11-27 06:21:091) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS FOR THE POOL PUMP.WPB AMEND. TO FBC SEC.
 107.2.1.
 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9,
 4.4.9.1
 3) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS FOR THE MAIN DRAIN. WPB AMEND. TO FBC
 SEC. 107.2.1.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2018-12-11 Cont ID  
Sent By mcruz Date 2018-12-11 Time 14:59 Rev Time 0.00
Received By mcruz Date 2018-12-11 Time 14:58 Sent To P
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2018-12-11 Cont ID  
Sent By mcruz Date 2018-11-07 Time 15:15 Rev Time 0.00
Received By mcruz Date 2018-11-07 Time 15:13 Sent To PC
Notes
***NONE***