Plan Review Details - Permit 18101042
Plan Review Stops For Permit 18101042
Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-10-25 Cont ID  
Sent By tklarge Date 2018-10-25 Time 14:27 Rev Time 0.00
Received By tklarge Date 2018-10-22 Time 14:15 Sent To  
Notes
2018-10-23 14:15:47PLUMB <5K

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-10-25 Cont ID  
Sent By tklarge Date 2018-10-25 Time 14:26 Rev Time 0.00
Received By tklarge Date 2018-10-25 Time 14:03 Sent To I
Notes
2018-10-25 14:26:461) THE VALUE FOR THE SCOPE OF WORK TO BE SEEMS
 LOW.SUBMIT DETAILED DOCUMENTATION SHOWING THE VALUE OF
 ALL WORK TO BE DONE. FBC 109.3.
 2) SIZE ALL THE PLUMBING LINES ON THE DRAWING INCLUDING
 THE VENTS. FBC SEC. 107.2.1, 2017 FBCR - PLUMBING
 SEC.P3005.
 3) SUBMIT AN EXISTING FLOOR PAN AND A PROPOSED FLOOR
 PLAN. CLEARLY SHOW THE ENTIRE SCOPE OF WORK TO BE DONE.
 2017 FBC SEC. 107.2.1. SHOW WHAT IS EXISTING TO REMAIN
 AND WHAT WILL BE NEW.
 4) SUBMIT TWO COMPLETE SETS OF PLANS FOR ALL THE WORK
 BEING DONE. INCLUDE BUILDING, ELECTRICAL, MECHANICAL,
 ETC. 2017 FBC SEC. 107.2.1.
 5) SHOW THE LENGTH AND WIDTH OF THE NEW SHOWERS. COMPLY
 WITH 2017 FBCR SEC.P2709.1.
 6) SHOW THE REQUIRED FIXTURE CLEARANCES ON THE PLANS.
 COMPLY WITH 2017 FBCR SEC.P2705.1 (5).
 7) CLEANOUTS ARE REQUIRED IN THE WATSE STACKS PER 2017
 FBCR SEC.P3005.2.
 NOTE: A THOROUGH REVIEW COULD NOT BE DONE AS THE
 SUBMITTED PLANS ARE VAGUE AS TO THE SCOPE OF WORK BEING
 DONE.ADDDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED
 UPON RESUBMITTAL.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  