| Plan Review Stops For Permit 18100815 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2019-03-12 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-03-12 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-03-12 |
Time |
10:01 |
Sent To |
|
|
| Notes |
| 2019-03-12 10:23:46 | 2900 CUMBERLAND OK TO USE AS ADDRESS PER M.ORIO | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2019-03-12 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-03-12 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-03-12 |
Time |
10:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2019-02-20 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-02-20 |
Time |
07:06 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-02-20 |
Time |
07:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-12-08 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-12-08 |
Time |
18:57 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-12-08 |
Time |
18:52 |
Sent To |
|
|
| Notes |
| 2018-12-08 18:59:22 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 1. SHEET S2.0B REFERS TO ALUMINUM PANELS AND | | | ARCHITECTURAL PAGES. NO ARCHITECTURAL PAGES WERE | | | SUBMITTED. PLEASE SPECIFY ALUMINUM PANELS, OR, IF TO BE | | | DELEGATED ENGINEERING, INDICATE THAT THIS WILL BE | | | DELEGATED ENGINEERING SUBMITTED AT A LATER DATE, FBC B | | | 1609. | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2019-03-11 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-03-11 |
Time |
16:01 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-03-11 |
Time |
16:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2019-01-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-01-28 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-01-28 |
Time |
16:26 |
Sent To |
|
|
| Notes |
| 2019-01-28 16:26:47 | SEE FIRST PLAN REVIEW FOR COMMENTS JLEAHY |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2018-11-16 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-11-16 |
Time |
13:52 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-11-16 |
Time |
13:52 |
Sent To |
|
|
| Notes |
| 2018-11-16 13:54:12 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | ELECTRIC SHOWN DOES NOT INCLUDE SIZE OF CIRCUIT, WHERE | | | FEED COMES FROM. | | | | | | NEED TO SHOW CONTROL PER FBC C405.2.4 |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2019-02-08 |
|
|
Cont ID |
|
| Sent By |
RRossano |
Date |
2019-02-08 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2019-02-08 |
Time |
|
Sent To |
I |
|
| Notes |
| 2019-02-08 12:34:38 | PASSED WITH PROVISO: | | | | | | RIGHT OF WAY PERMIT WILL BE REQUIRED. CONTRACTOR TO | | | OBTAIN CITY OF WPB ASBUILTS FOR ALL UTILITIES WITHIN | | | ALL 5 PROJECT AREAS TO AVOID UTILITY CONFLICTS. | | | PRE-CONSTRUCTION MEETING WILL BE REQUIRED BEFORE WORK | | | COMMENCES. | | | | | | PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY OF | | | WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC RIGHT | | | OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF YOUR | | | PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE | | | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL | | | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT | | | [email protected] OR 561-494-1079 FOR FURTHER | | | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION | | | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD | | | SURVEY, POT-HOLING, SOFT DIGS ETC. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO | | | PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1098 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 246-9525 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2018-12-10 |
|
|
Cont ID |
|
| Sent By |
RRossano |
Date |
2018-12-10 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2018-12-10 |
Time |
|
Sent To |
I |
|
| Notes |
| 2018-12-10 10:55:05 | PLEASE ADDRESS BUILDING COMMENTS. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-03-12 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-03-12 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-02-25 |
Time |
07:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-02-20 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-02-20 |
Time |
07:21 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-01-16 |
Time |
13:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-12-26 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2018-12-26 |
Time |
08:17 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2018-11-01 |
Time |
08:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2019-03-12 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-03-12 |
Time |
10:00 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-03-12 |
Time |
10:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2019-02-20 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-02-20 |
Time |
07:08 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-02-20 |
Time |
07:07 |
Sent To |
|
|
| Notes |
| 2019-02-20 07:20:43 | ****CORRECTIONS**** | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | FBC B 107. PLEASE PROVIDE THE REQUIRED THIRD PARTY | | | REGISTERED DIGITAL SIGNATURES. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2018-12-08 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-12-08 |
Time |
18:48 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-12-08 |
Time |
18:48 |
Sent To |
|
|
| Notes |
| 2018-12-08 18:51:05 | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | THE PAGES SUBMITTED ARE NOT DIGITALLY SIGNED AND SEALED | | | (PLANS, GEOTECHNICAL REPORT). | | | | | | DO THE DESIGN PROFESSIONALS HAVE DIGITAL SEALS? IF YES, | | | PLEASE PROVIDE DIGITALLY SIGNED PLANS. | | | | | | IF THEY DO NOT, AFTER ALL REVIEWS HAVE PASSED, SUBMIT | | | ONE ORIGINAL SIGNED AND SEALED PAPER SET TO THE | | | BUILDING DIVISION. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2019-03-06 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2019-03-06 |
Time |
13:21 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2019-03-06 |
Time |
13:21 |
Sent To |
PC |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2018-12-26 |
|
|
Cont ID |
|
| Sent By |
pgreilic |
Date |
2018-12-26 |
Time |
07:56 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-12-10 |
Time |
11:52 |
Sent To |
PC |
|
| Notes |
|
|