Plan Review Details - Permit 18100412
Plan Review Stops For Permit 18100412
Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status P Date 2019-03-26 Cont ID  
Sent By shill Date 2019-03-26 Time 15:40 Rev Time 0.00
Received By shill Date 2019-03-26 Time 15:40 Sent To  
Notes
2019-03-26 15:41:12AIPP REQUIREMENT SATISFIED PER EMAIL FROM S.WELTER
 3/21/19
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-01-24 Cont ID  
Sent By dbattles Date 2019-01-24 Time 15:07 Rev Time 0.00
Received By dbattles Date 2019-01-24 Time 15:07 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-12-12 Cont ID  
Sent By dbattles Date 2018-12-12 Time 09:55 Rev Time 0.00
Received By dbattles Date 2018-12-12 Time 09:55 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-01-24 Cont ID  
Sent By RRossano Date 2019-01-24 Time   Rev Time 0.00
Received By rrossano Date 2019-01-24 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2018-12-10 Cont ID  
Sent By RRossano Date 2018-12-10 Time   Rev Time 0.00
Received By rrossano Date 2018-12-10 Time   Sent To I
Notes
2018-12-10 10:39:53PLEASE ADD STOP BAR AND SHOW LANDSCAPING PER CITY OF
 WPB GENERAL CONSTRUCTION STANDARD GC-8. GENERAL NOTES
 ARE INCLUDED BELOW FOR YOUR INFORMATION.
  
 DUMPSTERS / SANITATION ENCLOSURES:
  
 1. DUMPSTER ENCLOSURE MUST HAVE A MINIMUM OF 12? ? 6?
 OPENING BETWEEN THE GATE POSTS.
 2. INTERIOR DIMENSIONS OF THE ENCLOSURE MUST BE A
 MINIMUM OF 12? ? 6? WIDE AND 6 FEET DEEP. A CONCRETE
 PARKING STOP BAR 10? LONG MUST BE CENTERED (FROM GATES)
 AND INSTALLED 18? FROM THE BACK WALL. STEEL BARS WILL
 NEED TO BE DRILLED THRU THE STOP BAR AND INTO THE
 INTERIOR FLOOR OF THE ENCLOSURE TO STOP THE STOP BAR
 FROM MOVING WHEN THE DUMPSTER IS SET INSIDE.
 3. THE OPENING OF THE DUMPSTER ENCLOSURE MUST BE ANGLED
 SO THAT A 40? LONG TRUCK WITH THE FORKS EXTENDED CAN
 APPROACH THE OPENING AND PICK UP THE DUMPSTER WITHOUT
 MAKING A SHARP TURN OR A 3 POINT TURN.
 4. THE TRUCK NEEDS TO HAVE NO LESS THAN 16? HIGH
 VERTICAL CLEARANCE AREA FOR THE TRUCK TO PICK UP THE
 DUMPSTER. THIS IS THE CLEAR AREA OVER THE DUMPSTER AND
 WHERE THE TRUCK WILL BE STOPPED TO UNLOAD THE DUMPSTER.
 5. THE TRUCK NEEDS TO HAVE NO LESS THAN 14? HIGH
 VERTICAL CLEARANCE AND 12? HORIZONTAL CLEARANCES FOR
 THE TRUCKS TO DRIVE THROUGH.
 6. IT IS STRONGLY SUGGESTED THAT YOU ADD A RECYCLING
 CENTER TO YOUR DUMPSTER ENCLOSURE
 7. NO FLOOR DRAIN TO THE SANITARY SEWER CAN BE
 INSTALLED IN THE DUMPSTER ENCLOSURE, UNLESS IT IS
 ROOFED SO NO RAIN WATER WILL GET INTO THE DRAIN.
 8. THE DUMPSTER ENCLOSURE MUST BE LOCATED TO ALLOW THE
 DUMP TRUCK TO BACK UP NO MORE THAN 50? STRAIGHT BACK
 AFTER THE RESETTING OF THE DUMPSTER IN THE ENCLOSURE.
 9. ENCLOSURE DETAIL NOT SUBMITTED, OR SUBMITTED WITH
 NON-STANDARD DETAIL OR WITHOUT ENGINEERING SERVICES
 DEPARTMENT APPROVED STAMP.
 10. OWNER MAY AGREE TO THE CONDITION OF PLACING THE
 DUMPSTER IN AN OPEN AREA FOR PICKUP; HOWEVER THIS
 CONDITION WILL BE PLACED VIA NOTE ON YOUR APPROVED SITE
 PLAN.
 11. DUMPSTER LOADING AREA SHALL HAVE 10' CONCRETE
 SURFACE FOR TRUCK TO APPROACH. TYPICALLY ASPHALT IS
 USED IN THE AREA APPROACHING THE DUMPSTER AND IT
 QUICKLY DETERIORATES DUE TO THE FRONT WHEELS OF THE
 SANITATION VEHICLE.
 12. DUMPSTER DOORS SHALL HAVE STEEL PIN TO LOCK DOORS
 IN POSITION. TYPICALLY IN AN OPEN POSITION AND A CLOSED
 POSITION. THIS WOULD ALLOW DOORS TO BE STATIC AND NOT
 FREELY SWINGING.
  
 PLEASE SEE THE ENCLOSED LINK FOR A COPY OF THE CITY OF
 WEST PALM BEACH GENERAL CONSTRUCTION STANDARD DETAIL
 FOR DUMPSTER ENCLOSURES (GC-8). HTTP://WWW.WPB.ORG/DEPA
 RTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICA
 TIONS
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-01-28 Cont ID  
Sent By cpuell Date 2019-01-28 Time 17:14 Rev Time 0.00
Received By cpuell Date 2019-01-21 Time 09:37 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-12-12 Cont ID  
Sent By dbattles Date 2018-12-12 Time 09:58 Rev Time 0.00
Received By dbattles Date 2018-10-26 Time 10:41 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2019-01-24 Cont ID  
Sent By dbattles Date 2019-01-24 Time 15:07 Rev Time 0.00
Received By dbattles Date 2019-01-24 Time 15:07 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2018-12-12 Cont ID  
Sent By dbattles Date 2018-12-12 Time 09:57 Rev Time 0.00
Received By dbattles Date 2018-12-12 Time 09:57 Sent To  
Notes
2018-12-12 09:58:38PLANS OK FOR THIS REVIEW.
 ANY NEW SHEETS WILL NEED TO BE VERIFIED.

Review Stop Z ZONING
Rev No 2 Status P Date   Cont ID  
Sent By   Date 2019-01-28 Time   Rev Time 0.00
Received By pgreilic Date 2019-01-28 Time 14:10 Sent To  
Notes
2019-01-28 14:10:43PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date   Cont ID  
Sent By pgreilic Date 2018-11-08 Time   Rev Time 0.00
Received By pgreilic Date 2018-11-08 Time 08:46 Sent To  
Notes
2018-11-08 08:47:19PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]