Plan Review Details - Permit 18100337
| Plan Review Stops For Permit 18100337 |
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2018-12-21 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-12-21 |
Time |
07:04 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-12-06 |
Time |
14:34 |
Sent To |
|
|
| Notes |
| 2018-12-07 14:34:29 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-11-26 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-11-26 |
Time |
06:17 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-11-05 |
Time |
14:56 |
Sent To |
|
|
| Notes |
| 2018-11-06 14:56:13 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-10-17 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-10-17 |
Time |
15:40 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-10-09 |
Time |
09:28 |
Sent To |
PC |
|
| Notes |
| 2018-10-11 09:28:44 | ROUTED TO PLUMBING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2018-12-21 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-12-21 |
Time |
07:03 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-12-20 |
Time |
06:35 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2018-11-26 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-11-26 |
Time |
13:16 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-11-26 |
Time |
05:28 |
Sent To |
I |
|
| Notes |
| 2018-11-26 06:15:49 | 1) THERE ARE COPIES OF THE SAME SHEET E-1 THAT SHOW TWO | | | DIFFERENT DETAILS ON THE PLANS AND SEVERAL LOOSE PAGES. | | | THERE ARE ALSO TWO COPIES OF A SHEET M.2. SUBMIT TWO | | | COMPLETE SETS OF PLANS THAT CONTAIN ALL THE DRAWINGS | | | FOR THIS PROJECT FOR REVIEW. WPB AMEND. TO FBC SEC. | | | 107.1. | | | 2) COPIES OF A PUMP PERFORMANCE CURVE, NUMBERING SYSTEM | | | AND A DIMENSIONS AND WEIGHT SHEET HAVE BEEN SUBMITTED | | | FOR REVIEW. EXPLAIN HOW THIS COMPLIES WITH THE REVIEW | | | COMMENT FOR SUBMITTING TWO COPIES OF THE MANUFACTURER'S | | | SPECIFICATIONS FOR THE PUMPS. THERE ARE MORE THAN 4 | | | PAGES IN THE MANUFACTURER'S SPECIFICATIONS. WPB AMEND. | | | TO FBC SEC. 107.2.1. SUBMIT TWO CCOMPLETE COPIES OF THE | | | MANUFACTURER'S PUMP SPECIFICATIONS FOR REVIEW. 2ND | | | REQUEST. | | | 3) PRESSURE REDUCING VALVES ARE REQUIRED IF THE STSTIC | | | WATER PRESSURE WITHIN THE BUILDING EXCEEDS 80 PSI. | | | PRESSURE REDUCING VALVES SHALL COMPLY WITH 2017 FBC | | | SEC. 604.8. INDICATE ON THE PLANS WHAT THE PROPOSED | | | STATIC PRESSURE OF THE SYSTEM WILL BE AND IF THE | | | EXISTING SYSTEM IS EQUIPPED WITH PRESSURE REDUCCING | | | VALVES OR IF PRESSURE REDUCING VALVES WILL NEED TO BE | | | INSTALLED. WPB AMEND TO FBC SEC. 107.2.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-10-15 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-10-15 |
Time |
10:09 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-10-15 |
Time |
06:32 |
Sent To |
Z |
|
| Notes |
| 2018-10-15 10:09:08 | 1) SUBMIT TWO COPIES OF A SITE PLAN SHOWING THE | | | LOCATION OF THE SLAB / PUMPS.FBC SECS. 107.1, | | | 107.3.5.1. | | | 2) SUBMIT TWO COPIES OF THE MANUFACTURER'S | | | SPECIFICATIONS FOR THE PUMPS.FBC SEC. 107.2.1. | | | 3) SUBMIT ANCHORING DETAILS FOR THE PUMPS. INDICATE | | | TYPE, LENGTH, NUMBER & DIAMETER OF THE FASTENERS. FBC | | | 107.2.1. | | | 4) SHOW THE TYPE AND SIZE OF ALL PIPE ON THE | | | DRAWING.FBC 107.2.1. | | | 5) SUBMIT TWO COPIES OF THE MANUFACTURER'S | | | SPECIFICATIONS FOR THE ALUMINUM HOUSING. | | | 6) A LOW-PRESSURE CUTOFF SHALL BE INSTALLED ON ALL | | | BOOSTER PUMPS IN ACCORDANCE WITH THE 2017 FBC-PLUMBING | | | SEC.606.5.5. | | | 7) SUBMIT DETAILS FOR THE SUPPORTING OF THE PIPE. | | | COMPLY WITH 2017 FPC-PLUMBING TABLE 308.5. | | | 8) INDICATE ON THE PLANS IF YOU ARE REPLACING EXISTING | | | PUMPS OR ADDING NEW PUMPS TO AN EXISTING DOMESTIC WATER | | | SYSTEM, PRESSURE REDUCING VALVES WILL BE REQUIRED IF | | | THE WATER PRESSURE WITHIN THE BUILDING EXCEEDS 80 PSI | | | STATIC PRESSURE. VALVES SHALL COMPLY WITH 2017 | | | FBC-PLUMBING SEC.604.8. | | | | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2018-11-09 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-11-09 |
Time |
13:16 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-11-09 |
Time |
10:10 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2018-10-17 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-10-17 |
Time |
15:40 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-10-17 |
Time |
15:35 |
Sent To |
PC |
|
| Notes |
| 2018-10-17 15:40:18 | ZONING REVIEW FAILED, DUE TO THE FOLLOWING: | | | | | | 1) PROVIDE 2 COPIES OF PROPERTY SURVEY. | | | 2) INDICATE OF SURVEY THE LOCATION OF THE PROPOSED | | | WATER BOOSTER PUMP STATION. | | | 3) IS THERE ARE LANDSCAPING THAT IS BEING REMOVED AS A | | | RESULT OF THE PROPOSED WORK? IF SO, SHOW WHERE | | | LANDSCAPING WILL BE REPLACED. | | | 4) RESPOND TO COMMENTS IN WRITING. | | | | | | FOR ADDITIONAL INFORMATION, THE ZONING AND LAND | | | DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT | | | WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH | | | PLANNING DEPARTMENT WEBSITE AT | | | WWW.CITYOFWPB.COM/PLAN/INDEX.HTM. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO | | | CONTACT ME. | | | | | | MAGGIE CRUZ | | | ASSOCIATE PLANNER | | | PLANNING AND ZONING DEPARTMENT | | | TEL: 561-822-1442 | | | E-MAIL: [email protected] |
|
|
|
Account Summary | Usage Policy | Privacy Policy