| Plan Review Stops For Permit 18100288 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-10-19 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2018-10-19 |
Time |
08:15 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2018-10-19 |
Time |
08:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-10-15 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2018-10-15 |
Time |
13:31 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2018-10-13 |
Time |
08:32 |
Sent To |
|
|
| Notes |
| 2018-10-15 13:32:02 | ****CORRECTIONS**** | | | W.P.B. PERMIT: 18100288 | | | REVIEWED: OCTOBER 15, 2018 | | | | | | DYLAN BATTLES | | | BUILDING PLANS EXAMINER I | | | [email protected] | | | 561-805-6718 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC AMENDED = FLORIDA BUILDING CODE,6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC ENERGY = FBC ENERGY CONSERVATION | | | | | | 1. [FBC 1017]MAXIMUM COMMON PATH OF EGRESS TRAVEL | | | DISTANCE SHEET G110. PLEASE LABEL THE FARTHEST POINT | | | UNTIL CHOICE OF 2 EXITS AS COMMON PATH OF TRAVEL AND | | | THEN LABEL THE PART AFTER AS THE TOTAL TRAVEL DISTANCE. | | | ALSO, SHOW CHOICE OF TWO EXITS AT CIRCULATION 322 NEAR | | | RECEPTION WHERE YOU CAN GO TO STAIR 1 OR STAIR 3. | | | | | | 2. [FBC 107.2.5]SHEET A300 REMOVE NOTE IN FLOOR FINISH | | | GENERAL NOTES ABOUT WALK-IN COOLER. | | | | | | 3. [FBC 107.2.5]ADD DIMENSIONS WHERE NEW WALLS ARE | | | BEING INSTALLED. FOR INSTANCE DEPTH OF ROOMS 304, 303, | | | 307, 308, 309 AND 310. PLEASE REVIEW FOR ANY ADDITIONAL | | | DIMENSIONS THAT WOULD BE USED FOR NEW WALLS AND | | | OPENINGS. | | | | | | 4. [FBC A604.3]315EX UNISEX ADA LAV. SHOW CLEARANCE | | | AROUND WATER CLOSET. | | | | | | 5. [FBC A602.2]SHOW ADA CLEARANCE AT WATER FOUNTAINS. | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2018-10-12 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-10-12 |
Time |
16:35 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-10-12 |
Time |
16:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2018-10-19 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2018-10-19 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2018-10-19 |
Time |
10:19 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2018-10-12 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2018-10-12 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2018-10-11 |
Time |
16:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-10-19 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2018-10-19 |
Time |
10:46 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2018-10-18 |
Time |
13:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-10-16 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-10-16 |
Time |
07:05 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-10-05 |
Time |
14:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2018-10-13 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2018-10-13 |
Time |
05:56 |
Rev Time |
0.00 |
| Received By |
hmoser |
Date |
2018-10-13 |
Time |
05:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2018-10-19 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-10-19 |
Time |
06:33 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-10-19 |
Time |
06:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-10-15 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-10-15 |
Time |
14:11 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-10-15 |
Time |
10:16 |
Sent To |
|
|
| Notes |
| 2018-10-15 13:34:55 | 1) THE HANDICAPPED STALL DOOR IN THE MEN'S STAFF LAV | | | CANNOT SWING INTO THE MINIMUM REQUIRED COMPARTMENT | | | AREA. 2017 FBC-ACCESS. SECS.604.8.1.2. | | | 2) SHOW THE REQUIRED CLEAR FLOOR SPACE FOR THE | | | HANDICAPPED ACCESSIBLE DRINKING FOUNTAINS ON THE PLANS. | | | 3) SUBMIT A DEMO PLAN FOR REVIEW. CLEARLY SHOW WHAT IS | | | EXISTING TO REMAN IN AND WHAT IS BEING REMOVED. FBC | | | 107.2.1. | | | 4) SHT. A 700 - THE FINISH SCHEDULE NOTES THE TYPE OF | | | FLOORING IN THE MEN'S & WOMEN'S LAVS, THE MEN'S & | | | WOMEN'S STAFF LAVS AND THE JANITOR SINK TO BE CARPET | | | TILE. THE FLOORS IN THESE AREAS SHALL COMPLY WITH 2017 | | | FBC SEC. 1210.2.1. | | | 5) SHOW THE INSIDE FINISHED DIMENSIONS (LXW) OF EACH | | | TOILET COMPARTMENT AND TOILET ROOM. 2017 FBC SECS. | | | 107.2.1, 2017 FBC-ACCESS. SEC 604.8.1.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2018-10-19 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2018-10-19 |
Time |
08:16 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2018-10-19 |
Time |
08:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2018-10-15 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2018-10-13 |
Time |
08:32 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2018-10-13 |
Time |
08:32 |
Sent To |
|
|
| Notes |
| 2018-10-13 08:33:48 | ALL DRAWINGS ARE GOOD FOR 1ST REVIEW. | | | ANY ADDITIONAL SHEETS WILL NEED TO BE VERIFIED. |
|
|