Plan Review Details - Permit 18100123
Plan Review Stops For Permit 18100123
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-11-05 Cont ID  
Sent By jwitmer Date 2018-11-05 Time 14:08 Rev Time 0.00
Received By jwitmer Date 2018-11-05 Time 13:46 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-10-07 Cont ID  
Sent By jpearson Date 2018-10-07 Time 11:34 Rev Time 0.00
Received By jpearson Date 2018-10-07 Time 11:34 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-10-10 Cont ID  
Sent By pleduc Date 2018-10-10 Time   Rev Time 0.00
Received By pleduc Date 2018-10-10 Time 13:29 Sent To  
Notes
2018-10-10 13:36:20THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1) ANY REMOVAL AND/OR CONSTRUCTION OF WALLS AND /OR
 CEILINGS REQUIRE AN EVALUATION OF THE FIRE ALARM AND/OR
 SPRINKLER SYSTEM FOR CODE COVERAGE AND COMPLIANCE BY
 CERTIFIED LIFE SAFETY CONTRACTORS.
  
 2) ANY AND ALL WORK ON THE FIRE ALARM AND/OR FIRE
 SPRINKLER SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP
 DRAWINGS AND BY CERTIFIED LIFE SAFETY CONTRACTORS.
  
 3) THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE
 SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE
 CONSTRUCTION PERIOD.
  
 PETER LEDUC
 FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-11-05 Cont ID  
Sent By cpuell Date 2018-11-05 Time 15:10 Rev Time 0.00
Received By cpuell Date 2018-10-02 Time 09:57 Sent To  
Notes
2018-10-04 09:57:11B33


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved