Plan Review Details - Permit 18091117
Plan Review Stops For Permit 18091117
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2019-04-05 Cont ID  
Sent By dbattles Date 2019-04-05 Time 16:12 Rev Time 0.00
Received By dbattles Date 2019-04-05 Time 16:12 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-02-12 Cont ID  
Sent By dbattles Date 2019-02-12 Time 12:41 Rev Time 0.00
Received By dbattles Date 2019-02-12 Time 12:41 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-11-19 Cont ID  
Sent By dbattles Date 2018-11-19 Time 10:05 Rev Time 0.00
Received By dbattles Date 2018-11-19 Time 10:05 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-10-18 Cont ID  
Sent By rmcdouga Date 2018-10-18 Time 09:27 Rev Time 0.00
Received By rmcdouga Date 2018-10-18 Time 09:25 Sent To  
Notes
2018-10-18 10:20:02PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF SIGNED AND SEALED DRAWINGS.
 PURSUANT TO FBC 107.1, THE DESIGN MUST BE PREPARED BY A
 PROFESSIONAL LICENSED PURSUANT TO FS 471. SEE BELOW:
 FBC107.1 GENERAL. SUBMITTAL DOCUMENTS CONSISTING OF
 CONSTRUCTION DOCUMENTS, STATEMENT OF SPECIAL
 INSPECTIONS, GEOTECHNICAL REPORT AND OTHER DATA SHALL
 BE SUBMITTED IN TWO OR MORE SETS WITH EACH PERMIT
 APPLICATION. THE CONSTRUCTION DOCUMENTS SHALL BE
 PREPARED BY A REGISTERED DESIGN PROFESSIONAL WHERE
 REQUIRED BY CHAPTER 471, FLORIDA STATUTES & 61G15
 FLORIDA ADMINISTRATIVE CODE. WHERE SPECIAL CONDITIONS
 EXIST, THE BUILDING OFFICIAL IS AUTHORIZED TO REQUIRE
 ADDITIONAL CONSTRUCTION DOCUMENTS TO BE PREPARED BY A
 REGISTERED DESIGN PROFESSIONAL.
  
 2) PROVIDE DETAILS, DIMENSIONS, BOTTOM SLOPE, SWIMOUTS,
 ETC. TO SHOW THAT THE PROPOSED POOL COMPLIES WITH THE
 REQUIREMENTS OF FBC-R 4501.6 AND ANSI/APSP/ICC 5 - 11.
  
 3) SUBMIT TWO SETS THE MANUFACTURER'S INSTALLATION
 INSTRUCTIONS AND LISTING FOR THE PROPOSED POOL BARRIER
 FENCE. FBC-R 4501.17

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-11-19 Cont ID  
Sent By fgiaquin Date 2018-11-19 Time 07:03 Rev Time 0.00
Received By fgiaquin Date 2018-11-19 Time 06:38 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-10-10 Cont ID  
Sent By jleahy Date 2018-10-10 Time 11:08 Rev Time 0.00
Received By jleahy Date 2018-10-10 Time 11:06 Sent To  
Notes
2018-10-18 10:59:45FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 PROVIDE CUT SHEETS ON POOL LIGHT AND POOL PUMP.

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-10-09 Cont ID  
Sent By tklarge Date 2018-10-09 Time 06:56 Rev Time 0.00
Received By tklarge Date 2018-10-09 Time 06:56 Sent To  
Notes
2018-10-09 06:57:20THERE IS NO HEATER ON THIS POOL.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2019-04-05 Cont ID  
Sent By dbattles Date 2019-04-05 Time 16:12 Rev Time 0.00
Received By dbattles Date 2019-04-01 Time 09:12 Sent To  
Notes
2019-04-03 09:12:47RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-02-12 Cont ID  
Sent By dbattles Date 2019-02-12 Time 12:41 Rev Time 0.00
Received By dbattles Date 2019-02-04 Time 14:46 Sent To  
Notes
2019-02-05 14:46:27RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-11-19 Cont ID  
Sent By dbattles Date 2018-11-19 Time 10:06 Rev Time 0.00
Received By dbattles Date 2018-10-30 Time 16:18 Sent To  
Notes
2018-10-31 16:18:11RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-10-18 Cont ID  
Sent By rmcdouga Date 2018-10-18 Time 10:30 Rev Time 0.00
Received By rmcdouga Date 2018-09-25 Time 14:08 Sent To I
Notes
2018-09-26 14:08:37ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 4 Status P Date 2019-04-05 Cont ID  
Sent By tklarge Date 2019-04-05 Time 10:16 Rev Time 0.00
Received By tklarge Date 2019-04-05 Time 08:55 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2019-02-12 Cont ID  
Sent By tklarge Date 2019-02-12 Time 05:27 Rev Time 0.00
Received By tklarge Date 2019-02-12 Time 04:27 Sent To  
Notes
2019-02-12 05:09:101) THE TDH CALCULATIONS MUST INCLUDE ALL OF THE SYSTEM
 COMPONENTS INCLUDING FITTINGS, VALVES, AND CHLORINATOR.
 ALL SYSTEM COMPONENTS EXCEPT THE PUMP. THE TDH
 CALCULATIONS DO NOT APPEAR TO HAVE INCCLUDED THESE
 COMPONENTS. THE PIPE AND FITTINGS FOR THE TANNING LEDGE
 MUST ALSO BE INCLUDED IN THE TDH CALCULATIONS.THE
 SIMPLIFIED METHOD IS NO LONGER PERMITTED TO BE USED.
 CLARIFY.2ND REQUEST.ANSI/APSP/ICC 7-2013
 SECS.4.4.9,4.4.9.1.
 2) SUBMIT TWO LEGIBLE COPIES OF THE CLEAR COMFORT
 SANITATION.
 3) THE POOL PLANS DRAWN BY THE POOL CONTRACTOR SHALL BE
 SIGNED AND SEALED BY AN ENGINEER PER FBC 107.1.
 4) THE PLANS DRAWN BY THE POOL CONTRACTOR SHOW RETURN
 LINES FOR THE TANNING LEDGE BUT WHERE IS THE MAIN
 DRAIN/ SUCTION LINE FOR FILTERING THE WATER?
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-11-16 Cont ID  
Sent By tklarge Date 2018-11-16 Time 14:01 Rev Time 0.00
Received By tklarge Date 2018-11-16 Time 06:23 Sent To  
Notes
2018-11-16 14:01:051) PAGE 7 OF THE LATHAM POOL PRODUCT DRAWINGS REFERS TO
 THE 2007 FLORIDA BUILDING CODE. THE CODE IN EFFECT IS
 THE 2017 EDIRION AND THE SECTION REFERENCED ON THE PLN
 ( SEC. 424) IS WRONG.
 2) REMOVE ALL OLD AND MULTIPLE COPIES OF DOCUMENTS FROM
 THE PERMIT PACKAGE AND COMPILE THE DOCUMENTS INTO TWO
 COMPLETE SETS OF PLANS FOR REVIEW. WPB AMEND. TO FBC
 SEC. 107.1.
 3) SUBMIT TWO COPIES OF LEGIBLE SPECIFICATIONS FOR THE
 CLEAR COMFORT SANITATION SYSTEM FOR REVIEW. WPB AMEND.
 TO FBC SEC. 107.2.1.
 4) THERE ARE TWO DIFFERENT POOL SPECS IN THE PERMIT
 PACKAGE THAT SHOW TWO DIFFERENT PUMPS TO BE INSTALLED.
 CLARIFY.
 5) THE TOTAL DYNAMIC HEAD CALCULATIONS DO NOT SHOW THE
 FRICTION LOSS FOR ALL THE SUCTION AND RETURN FITTINGS
 OR VALVES. SUBMIT NEW CALCULATIONS INCORPORATING THE
 FRICTION LOSS FOR THE VALVES AND FITTINGS. APSP 7-2013
 SEC.4.4.9, 4.4.9.1.
 6) IDENTIFY ON THE PUMP CURVE THAT IS ON THE TDH
 CALCULATION SHEET WHICH CURVE KEY APPLIES TO THIS
 INSTALLATION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-10-09 Cont ID  
Sent By tklarge Date 2018-10-09 Time 06:56 Rev Time 0.00
Received By tklarge Date 2018-10-09 Time 05:56 Sent To  
Notes
2018-10-09 06:18:371) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION
 ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT
 REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED
 THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET
 FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS
 MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING
 SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER,
 FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT
 THE PUMP.
 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS.
 3) INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS FOR
 THE PUMP BEING INSTALLED ON THIS SYSTEM. WPB AMEND. TO
 FBC SEC. 107.2.1.
 4) SIZE ALL PIPES ON THE PLUMBING DETAIL PLAN. 2017 FBC
 107.2.1.
 5) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE MAIN
 DRAIN, PUMP & FILTER. FBC 107.2.1.
 6) FILL IN ALL INFORMATION FOR THE POOL UNDER THE
 "SPECIFICATIONS" HEADING. FBC 107.2.1.
 7) THE POOL PLANS SHALL BE SIGNED AND SEALED BY AN
 ENGINEER PER FBC 107.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 4 Status P Date 2019-04-04 Cont ID  
Sent By mcruz Date 2019-04-04 Time 09:24 Rev Time 0.00
Received By mcruz Date 2019-04-04 Time 09:22 Sent To P
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2019-02-06 Cont ID  
Sent By mcruz Date 2019-02-06 Time 14:52 Rev Time 0.00
Received By mcruz Date 2019-02-06 Time 14:46 Sent To P
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2018-11-07 Cont ID  
Sent By mcruz Date 2018-11-07 Time 09:24 Rev Time 0.00
Received By mcruz Date 2018-11-07 Time 09:20 Sent To P
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2018-10-02 Cont ID  
Sent By mcruz Date 2018-10-02 Time 15:10 Rev Time 0.00
Received By mcruz Date 2018-10-02 Time 15:09 Sent To  
Notes
***NONE***