Plan Review Details - Permit 18090764
Plan Review Stops For Permit 18090764
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-03-08 Cont ID  
Sent By dbattles Date 2019-03-08 Time 07:55 Rev Time 0.00
Received By dbattles Date 2019-03-07 Time 16:45 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-01-29 Cont ID  
Sent By dbattles Date 2019-01-29 Time 15:14 Rev Time 0.00
Received By dbattles Date 2019-01-29 Time 15:14 Sent To  
Notes
2019-01-29 15:35:07****CORRECTIONS****
 W.P.B. PERMIT: 1811
 REVIEWED: JANUARY 29, 2019
  
 DYLAN BATTLES
 BUILDING PLANS EXAMINER I
 [email protected]
 561-805-6718
  
 FBC[AMENDED] = FLORIDA BUILDING CODE,6TH EDITION (2017)
 FBC[B] = FBC BUILDING
 FBC[EXISTING] = FBC EXISTING BUILDING
 FBC[A] = FBC ACCESSIBILITY
 FBC[E] = FBC ENERGY CONSERVATION
  
 107.5.3 FBC[AMENDED] THE DIGITAL SUBMITTAL INCLUDED
 SHEET A.03 REFLECTED CEILING PLAN.
 THAT SHEET IS STILL LISTED IN THE INDEX, BUT IT IS NOT
 INCLUDED IN THE PAPER SETS SUBMITTED.
 PLEASE PROVIDE MISSING SHEET, OR EXPLAIN HOW IT IS NO
 LONGER NEEDED.
 ALTHOUGH THE DIGITAL SHEET SHOWED MAINLEY EXISTING TO
 REMAIN, THE AMOUNT OF DEMO AND RECONFIGURATION WOULD
 HAVE REQUIRED CHANGES TO THE CEILING.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-11-19 Cont ID  
Sent By dbattles Date 2018-11-19 Time 15:12 Rev Time 0.00
Received By dbattles Date 2018-11-19 Time 11:09 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-03-07 Cont ID  
Sent By jleahy Date 2019-03-07 Time 11:29 Rev Time 0.00
Received By jleahy Date 2019-03-07 Time 11:29 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-02-20 Cont ID  
Sent By jleahy Date 2019-02-20 Time 08:27 Rev Time 0.00
Received By jleahy Date 2019-02-20 Time 08:22 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-10-24 Cont ID  
Sent By jleahy Date 2018-10-24 Time 10:13 Rev Time 0.00
Received By jleahy Date 2018-10-24 Time 10:05 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-01-24 Cont ID  
Sent By pleduc Date 2019-01-24 Time   Rev Time 0.00
Received By pleduc Date 2019-01-24 Time 10:35 Sent To  
Notes
2019-01-24 10:38:15THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF
 THE 6TH EDITION OF FLORIDA FIRE PREVENTION CODE
 INCLUDING THE 2015 EDITION OF NFPA 1 AND NFPA 101 AND
 ALL OTHER APPLICABLE CODES OR STANDARDS.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-09-25 Cont ID  
Sent By pleduc Date 2018-09-25 Time   Rev Time 0.00
Received By pleduc Date 2018-09-25 Time 13:39 Sent To  
Notes
2018-09-25 15:18:26THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF
 THE 6TH EDITION OF FLORIDA FIRE PREVENTION CODE
 INCLUDING THE 2015 EDITION OF NFPA 1 AND NFPA 101 AND
 ALL OTHER APPLICABLE CODES OR STANDARDS.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-03-08 Cont ID  
Sent By dbattles Date 2019-03-08 Time 07:57 Rev Time 0.00
Received By dbattles Date 2019-02-25 Time 13:29 Sent To  
Notes
2019-02-26 13:30:03RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-02-20 Cont ID  
Sent By jleahy Date 2019-02-20 Time 08:27 Rev Time 0.00
Received By jleahy Date 2019-01-22 Time 16:24 Sent To  
Notes
2019-01-23 16:24:32C11

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-11-30 Cont ID  
Sent By cpuell Date 2018-11-30 Time 09:17 Rev Time 0.00
Received By cpuell Date 2018-09-24 Time 13:16 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2019-03-08 Cont ID  
Sent By dbattles Date 2019-03-08 Time 07:57 Rev Time 0.00
Received By dbattles Date 2019-03-08 Time 07:57 Sent To  
Notes
2019-03-08 07:57:47NO CHANGE IN OCCUPANCY AND NO INCREASE IN SQ. FOOTAGE.

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2018-11-19 Cont ID  
Sent By dbattles Date 2018-11-19 Time 15:15 Rev Time 0.00
Received By dbattles Date 2018-11-19 Time 15:12 Sent To  
Notes
2018-11-19 15:17:07[FBC AMENDED 109]PLANS WILL BE REVIEWED BY THE PBC
 IMPACT FEE OFFICE DIGITALLY VIA PROJECTDOX UPON
 NOTIFICATION BY THIS OFFICE. NOTIFICATION MAY OCCUR
 WHEN PLANS ARE NEAREST FINAL FORM. YOU MAY COORDINATE
 WITH THE IMPACT FEE OFFICE AT (561) 233-5025 OR SIMPLY
 UPLOAD THE MUNICIPAL IMPACT FEE QUESTIONNAIRE FORM TO
 YOUR PROJECT AND NAME THE FILE MUNICIPAL IMPACT FEE
 QUESTIONNAIRE. THE FORM CAN BE FOUND AT: HTTP://DISCOVE
 R.PBCGOV.ORG/PZB/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QU
 ESTIONNAIRE.PDF UPON APPROVAL AND FEE PAYMENT, PLEASE
 UPLOAD THE RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected]
  
 DYLAN BATTLES
 BUILDING PLANS EXAMINER I
 [email protected]
 561-805-6718
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2018-11-08 Cont ID  
Sent By ccole Date 2018-11-08 Time 14:10 Rev Time 0.00
Received By ccole Date 2018-11-08 Time 14:10 Sent To  
Notes
2018-11-08 14:10:59NO MECHANICAL PLANS SUBMITTED FOR REVIEW
 SEPARATE PERMIT REQUIRED FOR MECHANICAL ALTERATIONS.
 CCOLE 11/8/18

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-02-19 Cont ID  
Sent By jesmith Date 2019-02-19 Time 13:32 Rev Time 0.00
Received By jesmith Date 2019-02-19 Time 12:32 Sent To  
Notes
2019-02-19 13:32:49APPROVED
 PROVISO
 1. ALL WORK PER CITY CODES SUBJECT TO FIELD INSPECTOR'S
 APPROVAL
 2. DRINKING FOUNTAIN AND MOP SINK WASTE SHALL CONNECT
 DOWNSTREAM OF BATHROOM WET VENT PER FBC 912.1. SEE
 REDLINED COMMENTS ON PLAN SHEET A.06 FOR CLARIFICATION.
 3. A THERMAL EXPANSION CONTROL DEVICE IS REQUIRED ON
 THE COLD WATER SUPPLY TO THE WATER HEATER IN ACCORDANCE
 WITH REQUIREMENTS OF FBC PL 607.3. PER WPB FBC 107.2.1,
 SUBMIT IN ACCORDANCE WITH WPB FBC 107.3.4.1 ? DEFERRED
 SUBMITTALS?, THE MANUFACTURER?S SPECIFICATIONS FOR THE
 THERMAL EXPANSION DEVICE AND PROVIDE SIZE OF SAME. SAID
 SUBMITTALS SHALL BE SUBMITTED, APPROVED AND ON THE
 JOBSITE PRIOR TO FINAL PLUMBING INSPECTION.
 4. WATER HEATER SHALL BE PROVIDED WITH ANTI-SIPHON
 DEVICE FOR COLD WATER SUPPLY PER FBC PL 504.1 AND/OR
 504.2; PROVIDE A RELIEF VALVE IN ACCORDANCE WITH FBC PL
 504.4.
 5. WATER HEATER RELIEF VALVE DISCHARGE PIPING SHALL BE
 IN ACCORDANCE WITH THE REQUIREMENTS OF FBC PL 504.6.
 6. WATER HEATER PAN AND DRAIN SHALL BE IN ACCORDANCE
 WITH FBC PL 504.7, 507.7.1 AND 507.7.2.
 7. PROVIDE VACUUM BREAKER (S) FOR WATER OUTLETS AT THE
 MOP SINK PER FBC PL 608.2.
 8. COMPLY WITH FBC EC C404.3 REGARDING HEAT TRAPS FOR
 THE WATER HEATER.
  
 CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RES = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2017 6TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION
 FBC FG = FLORIDA FUEL GAS CODE 2017 6TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-11-30 Cont ID  
Sent By tklarge Date 2018-11-30 Time 05:37 Rev Time 0.00
Received By tklarge Date 2018-11-30 Time 03:36 Sent To  
Notes
2018-11-30 04:42:221) THE LEVEL OF ALTERATION FOR THIS PROJECT SHALL BE
 INDICATED ON SHT. A.01 PER 2017 FBC-EXISTING BUILDING
 VOLUME SEC.301.1.
 2) LIST THE OCCUPANT LOAD OF THIS SPACE PER 2017 FBC-
 BUILDING SEC. 1004.1 AND TABLE 1004.1.2.
 3) A MINIMUM OF TWO DRINKING FOUNTAINS ARE REQUIRED PER
 2017 FBC- PLUMBING TABLE 403.1, 410.3, FBC-ACCESS.
 SEC.211.2. DRINKING FOUNTAINS SHALL BE HANDICAPPED
 ACCESSIBLE.
 4) SHT. A 0.1 - SHEET INDEX LISTS PLUMBING SHEET A 0.6
 BUT THIS SHEET HAS NOT BEEN INCLUDED IN THE SET OF
 PLANS. SUBMIT THE PLUMBING SHEET FOR REVIEW. THE SHEET
 SHALL BE ELECTRONICALLY SIGNED AND SEALED. FL. ADMIN.
 RULE 61G1-16.005.
 5) TEMPERED WATER IS REQUIRED TO THE NEW LAVATORY IN
 THE NEW HANDICAPPED TOILET ROOM PER 2017 FBC-PLUMBING
 SEC.416.5.
 6) SHT. A 0.4 - DETAIL #5 - THE CENTERLINE OF THE
 LAVATORY SHALL BE LOCATED A MINIMUM OF 15 INCHES FROM
 ANY SIDE WALL,PARTITION, VANITY OR OTHER OBSTRUCTION.
 WHERE IS THE 9 INCHES SHOWN ON THE DETAIL FRROM AND
 WHAT IS THE REASON FOR IT? CLARIY.2017 FBC-PLUMBING
 SEC.405.3.1.
 7) SHT. A 0.4 - ADA DETAILS #1 - GRAB BARS T5 & T 6
 SHALL BE MEASURED FROM THE FINISH FLOOR TO THE TOP OF
 THE GRIPPING SURFACE PER 2017 FBC-ACCESS. SEC.609.4.
 8) SHOW THE CLEAR FLOOR SPACE FOR THE WATER CLOSET AND
 THE LAVATORY ON THE PLAN ON SHT. A 0.4 ON DETAIL #6.
 COMPLY WITH 2017 FBC-ACCESS. SEC.604.3 & 604.3.2.
 (WATER CLOSET). NO OTHER FIXTURES OR OBSTRUCTIONS SHALL
 BE LOCATED WITHIN THE REQUIRED WATER CLOSET CLEARANCE.
 2017 FBC-ACCESS. SEC.606.2 (LAVATORY).
 9) SHT. A 0.4 - DETAIL # 6 - SHOW THE LENGTH AND WIDTH
 DIMENSIONS OF THE HANDICAPPED TOILET ROOM ON THE PLANS.
 WPB AMEND. TO FBC SEC. 107.2.1.
 10) SHT. A 0.4 - ADA DETAILS #1 - ITEM T7 (COAT HOOK) -
 THE COAT HOOK SHALL BE LOCATED A MAXIMUM OF 48 INCHES
 ABOVE THE FINISH FLOOR, NOT 54 INCHES AS SHOWN. 2017
 FBC-ACCESS SEC, 308.
 11) SHT. A 0.6 - ADA DETAILS #2 - THE TOILET PAPER
 DISPENSER SHALL BE LOCATED IN ACCORDANCE WITH 2017
 FBC-ACCESS. SECTION 604.7.
 12) HOT WATER PIPING SHALL BE INSULATED IN ACCORDANCE
 WITH 2017 FBC-PLUMBING SEC.607.5.
 13) SANITARY AND WATER RISERS ARE REQUIRED FOR REVIEW.
 WPB AMEND. TO FBC SEC. 107.3.5.1.3.
 14) SUBMIT A DIMENSION PLAN SHOW THE LENGTHS & WIDTHS
 OF ALL NEWLY CONSTRUCTED ROOMS AND AREAS. WPB AMEND. TO
 FBC SEC. 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2018-11-30 Cont ID  
Sent By tklarge Date 2018-11-30 Time 05:41 Rev Time 0.00
Received By tklarge Date 2018-11-30 Time 05:38 Sent To  
Notes
2018-11-30 05:41:06PLUMBING SHT. A 0.6 IS NOT IN THIS PACKAGE BUT IS
 LISTED IN THE INDEX, SIGNATURE WILL BE CHECKED WHEN
 SHEET IS SUBMITTED AND SECOND REVIEW IS DONE. T.LARGE.
2018-11-19 11:11:03ALL ORIGINALS SUBMITTED ARE - OK