| Plan Review Stops For Permit 18090756 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-11-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-11-28 |
Time |
19:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-11-28 |
Time |
19:28 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2018-10-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-10-18 |
Time |
09:17 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-10-18 |
Time |
08:57 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2018-11-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-11-28 |
Time |
15:44 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-11-28 |
Time |
15:44 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2018-10-15 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-10-15 |
Time |
07:39 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-10-15 |
Time |
07:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2018-10-10 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-10-10 |
Time |
06:33 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-10-10 |
Time |
06:33 |
Sent To |
|
|
| Notes |
| 2018-10-10 06:34:16 | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | | THIS TIME. A SEPARATE GAS PERMIT IS REQUIRED FOR A | | | CONTRACTOR TO PERFORM THE RELATED WORK. PROVIDE | | | COMPLETE PLANS THAT REFLECT THE ENTIRE SCOPE OF GAS | | | WORK TO BE DONE. WPB AMEND. TO FBC SEC.107.2.1. | | | | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE | | | FBC-R, SEC. G2404.3. | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL | | | GAS SEC. 301.3. | | | | | | A SEPARATE PERMIT IS REQUIRED FOR THE GAS INSTALLATION. | | | | | | GAS POOL HEATERS SHALL HAVE A MINIMUM THERMAL | | | EFFICIENCY OF 82% PER THE 2017 FBC-ENERGY TABLE C404.2. | | | | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-11-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-11-28 |
Time |
19:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-11-08 |
Time |
13:30 |
Sent To |
|
|
| Notes |
| 2018-11-15 16:11:14 | ROUTED FROM ZONING TO LM 11/15/18 | | 2018-11-09 13:30:19 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-10-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-10-18 |
Time |
09:17 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-09-18 |
Time |
14:06 |
Sent To |
|
|
| Notes |
| 2018-10-03 16:24:52 | ROUTE FROM ZONING TO LM 10/4/18 | | 2018-09-19 14:06:55 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2018-11-26 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-11-26 |
Time |
11:42 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-11-26 |
Time |
11:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2018-10-10 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-10-10 |
Time |
06:33 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-10-10 |
Time |
06:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2018-11-15 |
|
|
Cont ID |
|
| Sent By |
elevesqu |
Date |
2018-11-15 |
Time |
16:10 |
Rev Time |
0.00 |
| Received By |
elevesqu |
Date |
2018-11-15 |
Time |
16:10 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2018-10-03 |
|
|
Cont ID |
|
| Sent By |
elevesqu |
Date |
2018-10-03 |
Time |
16:24 |
Rev Time |
0.00 |
| Received By |
elevesqu |
Date |
2018-10-01 |
Time |
16:56 |
Sent To |
|
|
| Notes |
| 2018-10-03 16:24:35 | PLEASE INCLUDE DIMENSIONS OF POOL EQUIPMENT FROM | | | PROPERTY LINE. PER SECTION 94-305, MECHANICAL EQUIPMENT | | | MAY NOT PROJECT MORE THAN FOUR FEET INTO A REQUIRED | | | SETBACK (5 FOOT REQUIRED FOR SIDE). | | | | | | PLEASE NOTE, THE SETBACK FROM SIDE PROPERTY LINE FOR | | | SCREEN ENCLOSURES IS 5 FEET. PLEASE NOTE FOR ANY FUTURE | | | PLANS FOR SCREEN ENCLOSURE AND INCLUDE ADDITIONAL | | | SETBACK SPACE IF APPLICANT HAS INTEREST IN FUTURE | | | SCREEN ENCLOSURE. | | | | | | PLEASE NOTE, IF PATIO OR PAVED AREAS IS PROVIDED | | | ADJACENT TO SWIMMING POOL, IT SHALL BE DESIGNED TO | | | DRAIN AWAY FORM THE POOL, BUT NOT ONTO ADJACENT | | | PROPERTIES. PLEASE RESPOND TO COMMENT WITH RESUBMITTAL. | | | | | | |
|
|