Plan Review Details - Permit 18090570
Plan Review Stops For Permit 18090570
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-09-26 Cont ID  
Sent By jpearson Date 2018-09-26 Time 12:40 Rev Time 0.00
Received By jpearson Date 2018-09-26 Time 12:40 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-09-18 Cont ID  
Sent By jpearson Date 2018-09-18 Time 07:42 Rev Time 0.00
Received By jpearson Date 2018-09-18 Time 07:42 Sent To M
Notes
2018-09-18 07:42:15CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. VALUE FOR WORK STATED ON PERMIT APPLICATION APPEARS
 LOW. PROVIDE COPY OF SIGNED CONTRACT WITH SCOPE AND
 VALUE OF WORK, TO INCLUDE ALL MATERIALS AND LABOR. THIS
 IS FOR TOTAL PROJECT, NOT JUST ELECTRICAL. FBC 109.3
 2. STATE SCOPE OF WORK ON PLAN. WPB FBC 107.2.1
 3. PER THE WPB AMENDMENTS TO THE FBC, PLAN (EACH SHEET
 OF BOTH COPIES) IS REQUIRED TO BEAR THE NAME AND BE
 SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE
 DESIGN. THIS PERSON MUST BE A LICENSED DESIGN
 PROFESSIONAL OR THE ELECTRICAL CONTRACTOR QUALIFIER.
 PROVIDE CORRECTION. WPB FBC 107.1, 107.2; FS 471, 481
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2018-09-24 Cont ID  
Sent By pleduc Date 2018-09-24 Time   Rev Time 0.00
Received By pleduc Date 2018-09-24 Time 13:35 Sent To E
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-09-17 Cont ID  
Sent By pleduc Date 2018-09-17 Time   Rev Time 0.00
Received By pleduc Date 2018-09-17 Time 11:08 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2018-09-26 Time   Rev Time 0.00
Received By lmarchan Date 2018-09-20 Time 11:41 Sent To  
Notes
2018-09-21 11:41:27RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-09-20 Cont ID  
Sent By lmarchan Date 2018-09-20 Time 11:42 Rev Time 0.00
Received By lmarchan Date 2018-09-13 Time 13:56 Sent To  
Notes
2018-09-14 13:56:39ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2018-09-20 Cont ID  
Sent By ccole Date 2018-09-20 Time 11:39 Rev Time 0.00
Received By ccole Date 2018-09-20 Time 11:39 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved