Plan Review Details - Permit 18090188
Plan Review Stops For Permit 18090188
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-09-26 Cont ID  
Sent By rmcdouga Date 2018-09-26 Time 11:09 Rev Time 0.00
Received By rmcdouga Date 2018-09-26 Time 10:19 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-09-20 Cont ID  
Sent By fgiaquin Date 2018-09-20 Time 06:03 Rev Time 0.00
Received By fgiaquin Date 2018-09-20 Time 05:36 Sent To  
Notes
2018-09-20 06:03:35SERVICE CONDUCTORS AND FEEDERS TO BOTH PANELS MUST BE
 3/0 WIRE NOT 2/0. REDLINED ON PLAN. SEE NEC
 310.15(B)(7) # 1&2

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2018-09-19 Cont ID  
Sent By lcrespo Date 2018-09-19 Time 07:31 Rev Time 0.00
Received By lcrespo Date 2018-09-19 Time 07:31 Sent To  
Notes
2018-09-19 07:32:0809/19/18 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-09-26 Cont ID  
Sent By rmcdouga Date 2018-09-26 Time 11:09 Rev Time 0.00
Received By rmcdouga Date 2018-09-06 Time 14:43 Sent To  
Notes
2018-09-07 14:43:47ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2018-09-18 Cont ID  
Sent By ajones Date 2018-09-18 Time 11:22 Rev Time 0.00
Received By ajones Date 2018-09-18 Time 11:22 Sent To  
Notes
***NONE***