Plan Review Details - Permit 18090126
Plan Review Stops For Permit 18090126
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2018-09-19 Cont ID  
Sent By rrossano Date 2018-09-19 Time   Rev Time 1.00
Received By rrossano Date 2018-09-18 Time   Sent To I
Notes
2018-09-19 11:26:23PASSED WITH PROVISO:
 PROVIDE CLEANOUT INSIDE PROPERTY LINE. SEE WPB GRAVITY
 STANDARD DETAIL SHEET GS-6, HERE: HTTP://WPB.ORG/DEPART
 MENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATI
 ONS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-10-01 Cont ID  
Sent By tklarge Date 2018-10-01 Time 11:39 Rev Time 0.00
Received By tklarge Date 2018-09-27 Time 14:27 Sent To  
Notes
2018-09-28 14:27:52RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-09-19 Cont ID  
Sent By cpuell Date 2018-09-19 Time 14:11 Rev Time 0.00
Received By cpuell Date 2018-09-05 Time 16:31 Sent To  
Notes
2018-09-06 16:31:20PLUMB <5K

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-10-01 Cont ID  
Sent By tklarge Date 2018-10-01 Time 11:38 Rev Time 0.00
Received By tklarge Date 2018-10-01 Time 11:38 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-09-14 Cont ID  
Sent By tklarge Date 2018-09-14 Time 09:14 Rev Time 0.00
Received By tklarge Date 2018-09-14 Time 08:54 Sent To ENG
Notes
2018-09-14 09:14:001) SUBMIT FACTORY SIZING CALCULATIONS FROM SCHIER FOR
 THE INTERCEPTOR. THE SIZING CALCULATIONS ON THE PLANS
 ARE VAGUE.2017 FBC- PLUMBING SEC. 1003.2.
 2) A SAMPLING PORT IS REQUIRED ON THE DISCHARGE SIDE OF
 THE GREASE INTERCEPTOR. A 4 INCH TWO WAY CLEANOUT WILL
 SUFFICE. ALTHOUGH IT IS IN THE NOTES ON THE PLANS,
 PLEASE SHOW THE CLEANOUTS ON THE INLET AND OUTLET LINES
 ON THE GREASE INTERCEPTOR.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  