Plan Review Details - Permit 18081528
Plan Review Stops For Permit 18081528
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2023-07-13 Cont ID  
Sent By cpuell Date 2023-07-13 Time 13:34 Rev Time 0.00
Received By cpuell Date 2023-07-13 Time 13:34 Sent To  
Notes
2023-07-13 13:34:43RECIEVED PRELIMINARY PCNS FROM PAPA UNITS UPDATED

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2023-02-21 Cont ID  
Sent By cpuell Date 2023-02-21 Time 15:05 Rev Time 0.00
Received By cpuell Date 2023-02-21 Time 15:04 Sent To  
Notes
2023-02-21 15:05:41PARCEL NEEDS TO BE UPDATED TO RETIRE THE 1515 S FLAGLER
 DR ADDRESS AND TO ACTIVATE THE APARTMENT ADDRESSES.
 PLEASE REACH OUT TO [email protected] OR CALL
 561-805-6659 TO DISCUSS THE ADDRESSING ISSUES.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2019-09-05 Cont ID  
Sent By rmcdouga Date 2019-09-05 Time 19:00 Rev Time 0.00
Received By rmcdouga Date 2019-09-05 Time 18:58 Sent To  
Notes
2022-02-17 17:59:17TOTAL CALCULATED ICC VALUATION IS $76,090,718.00.
  
 DECLARED VALUE = $91,000,000.00
 THE $3 MILLION FOUNDATION IS NOT INCLUDED IN THE $91
 MILLION.
  
 COSTS THAT WERE REMOVED FROM THE $91 MILLION.
 GENERATOR - $300,000.00
 2 POOLS - $500,000.00
 SITE WALLS -$150,000.00
 LANDSCAPE -$1.3 MILLION
 IRRIGATION -$50,000.00
 CIVIL -$1.2 MILLION
 FIRE SPRINKLER -$1.2 MILLION
 FIRE ALARM -$200,000.00
 TOTAL DEDUCTIONS = $4.9 MILLION
  
 GRAND TOTAL = $91 MILLION - $4.9 MILLION = $86.1
 MILLION

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2019-07-05 Cont ID  
Sent By rmcdouga Date 2019-07-05 Time 14:43 Rev Time 0.00
Received By rmcdouga Date 2019-06-27 Time 18:40 Sent To  
Notes
2019-07-05 11:00:07REVIEW COMMENTS
  
 3RD REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
 WPB PERMIT: 18081528
 ADD: 1515 S. FLAGLER DRIVE
 CONT:
 TEL:
 EMAIL:
  
 1) ART IN PUBLIC PLACES - WILL COMPLY.
  
 2) COMPLIED.
  
 3) COMPLIED.
  
 4) COMPLIED.
  
 5) COMPLIED.
  
 6) COMPLIED.
  
 7) COMPLIED.
  
 8) COMPLIED.
  
 9) COMPLIED.
  
 10) COMPLIED.
  
 11) COMPLIED.
  
 12) COMPLIED.
  
 13) COMPLIED.
  
 14) COMPLIED..
  
 15) COMPLIED.
  
 16) COMPLIED.
  
 17) COMPLIED.
  
 18) COMPLIED.
  
 19) COMPLIED.
  
 20) COMPLIED.
  
 21) COMPLIED.
  
 22) COMPLIED.
  
 23) COMPLIED.
  
 24) COMPLIED.
  
 25) COMPLIED.
  
 26) COMPLIED.
  
 27) COMPLIED.
  
 28) COMPLIED.
  
 29) COMPLIED.
  
 30) COMPLIED.
  
 31) COMPLIED.
  
 32) COMPLIED.
  
 33) COMPLIED.
  
 34) COMPLIED.
  
 35) COMPLIED.
  
 36) COMPLIED.
  
 37) COMPLIED.
  
 38) COMPLIED.
  
 39)COMPLIED.
  
 40) NOT COMPLIED. SOME OF THE ITEMS THAT ARE LISTED AS
 DEFERRED ON SHEET G-7 ARE REQUIRED TO HAVE SEPARATE
 PERMITS, APPLICATIONS AND REVIEWS. SEPARATE PERMITS ARE
 REQUIRED FOR GENERATORS, IRRIGATION, LANDSCAPE, POOLS
 AND FENCES. THESE ITEMS REQUIRING SEPARATE PERMITS
 SHOULD NOT BE LISTED AS DEFERRED (NO FEE) SUBMITTALS.
 PROVIDE A LIST OF THE ITEMS THAT WILL BE DEFERRED ON
 THE PLANS. FBC 107.3.4.1 DEFERRED SUBMITTALS. FOR THE
 PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE
 DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT
 SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE
 TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
  
 41) DEFERRED. W. P. B. 107.3.4.1 PRODUCT APPROVALS.
 THOSE PRODUCTS WHICH ARE REGULATED BY THE DCA RULE
 9N-03 SHALL BE REVIEWED AND APPROVED IN WRITING BY THE
 DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL. FL 61G1-23.015 (2) THE
 ARCHITECT IS RESPONSIBLE FOR SUPERVISING AND REVIEWING
 ALL PROJECT DATA, REPORTS, SHOP DRAWINGS ETC.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 42) PARTIAL COMPLIANCE. THIS NOTE IS INCORRECTLY WORDED
 AND NEEDS TO BE REVISED. FBC 1207.2 ADDRESSES
 AIR-BOURNE SOUND THAT WHEN TESTED IN ACCORDANCE WITH
 ASTM E90 IS REQUIRED TO HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 OR NOT LESS THAN 45 IF TESTED
 IN THE FIELD. FBC 1207.3 ADDRESSES STRUCTURE-BOURNE
 SOUND THAT WHEN TESTED IN ACCORDANCE WITH ASTM E492 IS
 REQUIRED TO HAVE AN IMPACT INSULATION CLASS (IIC)
 RATING OF NOT LESS THAN 50 OR NOT LESS THAN 45 WHEN
 TESTED IN THE FIELD. REVISE THE NOTE ON THE PLAN TO
 INCLUDE ASTM E 492. SHOW COMPLIANCE WITH FBC 1207.2 FOR
 AIR-BORNE SOUND TRANSMISSION AND FBC 1207.3 FOR
 STRUCTURE BORNE SOUND INSULATION.
  
 43) COMPLIED.
  
 44) COMPLIED.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-03-08 Cont ID  
Sent By rmcdouga Date 2019-03-08 Time 18:36 Rev Time 0.00
Received By rmcdouga Date 2019-02-11 Time 16:09 Sent To  
Notes
2019-03-07 08:37:09REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
 WPB PERMIT: 18081528
 ADD: 1515 S. FLAGLER DRIVE
 CONT:
 TEL:
 EMAIL:
  
 1) ART IN PUBLIC PLACES - APPLICANT IS WORKING TO
 ADDRESS.
  
 2) PARTIAL COMPLIANCE. PLEASE CLARIFY THE COST
 BREAKDOWN THAT WAS PROVIDED FOR THE ITEMS THAT WILL BE
 PERMITED SEPARATELY AND ARE NOT INCLUDED IN THE
 $91,000,000.00 VALUATION FOR THE BUILDING.
 A) IS THE $3,000,000.00 FOR THE FOUNDATION PART OF THE
 $91,000,000.00 FOR THE BUILDING?
 B) DOES THE $ 0.6 MILLION FOR THE POOL INCLUDE THE COST
 OF THE POOL LOCATED ON THE 25TH FLOOR? PLEASE PROVIDE
 THE COSTS FOR EACH POOL.
 C) THE SITE WALL, LANDSCAPE AND IRRIGATION WILL BE
 THREE SEPARATE PERMITS. PLEASE DIVIDE THE $1.5 MILLION
 TO SHOW THE COST OF EACH ONE INDIVIDUALLY.
 D) SPECIFY THE COST OF THE GENERATOR.
  
 3) PARTIAL COMPLIANCE.
 A) SUBMIT A THRESHOLD INSPECTION PLAN. FBC (CITY
 AMENDMENTS)110.8.1 THRESHOLD INSPECTION PLAN. THE
 ENFORCING AGENCY SHALL REQUIRE A SPECIAL INSPECTOR TO
 PERFORM STRUCTURAL INSPECTIONS ON A THRESHOLD BUILDING
 PURSUANT TO A STRUCTURAL INSPECTION PLAN PREPARED BY
 THE ENGINEER OF RECORD. THE STRUCTURAL INSPECTION PLAN
 MUST BE SUBMITTED TO THE ENFORCING AGENCY PRIOR TO THE
 ISSUANCE OF A BUILDING PERMIT FOR THE CONSTRUCTION OF A
 THRESHOLD BUILDING. THE PURPOSE OF THE STRUCTURAL
 INSPECTION PLAN IS TO PROVIDE SPECIFIC INSPECTION
 PROCEDURES AND SCHEDULES SO THAT THE BUILDING CAN BE
 ADEQUATELY INSPECTED FOR COMPLIANCE WITH THE PERMITTED
 DOCUMENTS. THE SPECIAL INSPECTOR MAY NOT SERVE AS A
 SURROGATE IN CARRYING OUT THE RESPONSIBILITIES OF THE
 BUILDING OFFICIAL, THE ARCHITECT OR THE ENGINEER OF
 RECORD. THE CONTRACTOR'S CONTRACTUAL OR STATUTORY
 OBLIGATIONS ARE NOT RELIEVED BY ANY ACTION OF THE
 SPECIAL INSPECTOR.
  
 B) COMPLIED.
  
 C) COMPLIED.
  
 D) COMPLIED.
  
 E) COMPLIED.
  
 F) NOTE: FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE,
 PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING
 ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE
 APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR
 PLANS.
  
 G) WILL COMPLY.
  
 H) WILL COMPLY.
  
 I) COMPLIED.
  
 J) COMPLIED.
  
 4) COMPLIED.
  
 5) COMPLIED.
  
 6) COMPLIED.
  
 7) NOT COMPLIED. SOME OF THE PLANS HAVE A STATEMENT
 THAT SAYS "PRELIMINARY NOT FOR CONSTRUCTION". SEE
 SHEETS A111 THRU A115 & SHEETS 000.1 THRU 000.4. THE
 SITE PLANS ARE REQUIRED MARKED FOR REFERENCE ONLY. ALL
 PLANS AND CONSTRUCTION DOCUMENTS THAT ARE SUBMITTED FOR
 PERMIT ARE REQUIRED TO BE SIGNED AND SEALED BY THE
 ENGINEER OR ARCHITECT THAT PREPARED THEM. FS 471 & 481
  
 8) COMPLIED.
  
 9) NOT COMPLIED. THERE ARE PLAN SHEETS LISTED IN THE
 DRAWING INDEX THAT ARE NOT PROVIDED. COORDINATE THE
 DRAWING INDEX ON SHEET G-1 WITH THE PLAN SHEETS THAT
 ARE BEING UPLOADED. STRIKE OUT THE SHEETS THAT ARE NOT
 UPLOADED. FBC 107.2.1
  
 10) COMPLIED.
  
 11) COMPLIED.
  
 12) COMPLIED.
  
 13) COMPLIED.
  
 14) COMPLIED..
  
 15) COMPLIED.
  
 16) COMPLIED.
  
 17) COMPLIED.
  
 18) COMPLIED.
  
 19) COMPLIED.
  
 20) COMPLIED.
  
 21) COMPLIED.
  
 22) NOT COMPLIED. THIS DOOR IS SPECIFIED AS A 45 MIN.
 FIRE RATED DOOR ON LS-5, HOWEVER, THE WALL IN WHICH IT
 IS LOCATED IS SPECIFIED AS HAVING A TWO HOUR FIRE
 RATING REQUIRING A 90 MIN FIRE RATED DOOR. ON SHEET
 LS-5 THE FIRE RATING OF THE DOOR TO THE TRASH ROOM IS
 NOT SPECIFIED.FBC 716.5.3
  
 23) COMPLIED.
  
 24) COMPLIED.
  
 25) PARTIALLY COMPLIED. THE DOORS TO ROOMS 305 AND 307
 ON SHEET LS-4 ARE SPECIFIED AS 45 MIN. FIRE RATED,
 HOWEVER, THE WALLS THEY ARE LOCATED IN ARE SHOWN AS 2
 HOUR FIRE RATED (WHICH REQUIRE 90 MIN. FIRE RATED
 DOORS). ALSO SEE SHEETS LS-5, LS-7, LS-8, LS-9. THE
 FIRE RATING OF THE DOORS TO THE STORAGE ROOM AND THE
 TRASH ROOM IN THE 2 HOUR FIRE RATED WALLS ARE NOT
 SPECIFIED. FBC 107.2.1
  
 26) COMPLIED.
  
 27) NOT COMPLIED. THIS DOOR IS LISTED AS A 45 MIN. FIRE
 RATED DOOR IN THE DOOR SCHEDULE. THE WALL THAT IT IS IN
 IS SHOWN AS A 2 HR. FIRE RATED WALL, WHICH REQUIRES A
 90 MIN. FIRE RATED DOOR. SHOULD THIS WALL HAVE A 1 HR
 FIRE RATING? DOOR 2504A IN THE 2 HOUR FIRE RATED WALL
 AND IS REQUIRED TO BE 90 MINUTE FIRE RATES IS NOT
 LISTED IN THE DOOR SCHEDULE. FBC 107.2.1
  
 28) COMPLIED.
  
 29) COMPLIED.
  
 30) COMPLIED.
  
 31) COMPLIED.
  
 32) COMPLIED.
  
 33) COMPLIED.
  
 34) COMPLIED.
  
 35) COMPLIED.
  
 36) COMPLIED.
  
 37) COMPLIED.
  
 38) COMPLIED.
  
 39)COMPLIED.
  
 40) NOT COMPLIED. PROVIDE A LIST OF THE ITEMS THAT WILL
 BE DEFERRED ON THE PLANS. FBC 107.3.4.1 DEFERRED
 SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED
 SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN
 THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION
 AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL
 WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL
 ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING
 OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS
 ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE
 BUILDING OFFICIAL.
  
 41) W. P. B. 107.3.4.1 PRODUCT APPROVALS. THOSE
 PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03
 SHALL BE REVIEWED AND APPROVED IN WRITING BY THE
 DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL. FL 61G1-23.015 (2) THE
 ARCHITECT IS RESPONSIBLE FOR SUPERVISING AND REVIEWING
 ALL PROJECT DATA, REPORTS, SHOP DRAWINGS ETC.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 42) PARTIAL COMPLIANCE. REVISE THE NOTE ON THE PLAN TO
 INCLUDE ASTM E 492. SHOW COMPLIANCE WITH FBC 1207.2 FOR
 AIR-BORNE SOUND TRANSMISSION AND FBC 1207.3 FOR
 STRUCTURE BORNE SOUND INSULATION.
  
 43) NEW COMMENT. ON SHEET A-107 THE UNIT H BALCONY
 APPEARS TO SLOPE TOWARDS THE BUILDING. FBC 107.2.1
  
 44) NEW COMMENT. ON SHEET A-901, PARTITION TYPE P/8 HAS
 2 LAYERS OF 5/8" TYPE X GWB ON EACH SIDE OF THE 6"
 METAL FRAME WALL. THIS WALL WILL HAVE A 2 HR FIRE
 RATING AND THE DETAIL SPECIFIES IT AS 1 HR. FBC 107.2.1
  
 FYI - THE NUMBERING OF THE ITEMS ON YOUR RESPONSE
 LETTER ARE INCORRECT. THERE ARE TWO ITEM NUMBER 2S
 WHICH CAUSED ALL COMMENTS AFTER NUMBER 2 TO BE
 MISNUMBERED.
 NOTE: ADDITIONAL COMMENTS MAY RESULT FROM THE RESPONSES
 TO THESE COMMENTS. WHEN RESUBMITTING, IT IS HELPFUL TO
 PROVIDE A RESPONSE LETTER ADDRESSING EACH ITEM ALONG
 WITH THE CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE
 INSERT CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-12-07 Cont ID  
Sent By rmcdouga Date 2018-12-07 Time 08:41 Rev Time 0.00
Received By rmcdouga Date 2018-11-27 Time 08:19 Sent To  
Notes
2018-11-15 17:45:15REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
 WPB PERMIT: 18081528
 ADD: 1515 S. FLAGLER DRIVE
 CONT:
 TEL:
 EMAIL:
  
 1) ART IN PUBLIC PLACES
 THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES
 ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR
 NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT
 APPLICATION WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL
 PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN
 $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE.
 PER CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND
 CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V,
 ART IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION
 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL
 PROJECT CONSTRUCTION COST.
 PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE
 V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND
 NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO
 THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE
 PROJECTS.
 SEC. 78-129. - PUBLIC ART ASSESSMENT FOR PRIVATE
 DEVELOPMENT.
 (A) APPLICABILITY. THE PROVISIONS OF THIS ARTICLE AND
 THE PUBLIC ART ASSESSMENT SECTION SHALL APPLY TO ALL
 PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW
 CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN
 EXISTING BUILDING, WHERE TOTAL CONSTRUCTION COSTS ARE
 EQUAL TO OR GREATER THAN $750,000.00. ALL BUILDINGS
 WITHIN NEW PLANNED DEVELOPMENTS SHALL BE ASSESSED
 CUMULATIVELY TOWARDS THIS ART IN PUBLIC PLACES
 REQUIREMENT, EVEN IF THE BUILDINGS ARE PERMITTED
 SEPARATELY OR DEVELOPED IN PHASES. THE PROVISIONS OF
 THIS SECTION APPLY TO NEW DEVELOPMENT OR NEW
 CONSTRUCTION WITHIN EXISTING PLANNED DEVELOPMENTS.
 FOR CONTACT INFORMATION PLEASE CONTACT:
 MS. SYBILLE WELTER ART IN PUBLIC PLACES COORDINATOR
 822-1515 E-MAIL: [email protected]
  
 2) 109.3 BUILDING PERMIT VALUATION.
 IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE
 CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE,
 ELECTRICAL, GAS, MECHANICAL, OR PLUMBING SYSTEMS
 APPEARS TO BE UNDER ESTIMATED ON THE APPLICATION, THE
 PERMIT SHALL BE DENIED. FOR PERMITTING PURPOSES,
 VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL
 REPLACEMENT PURPOSES, VALUATION OF BUILDINGS AND
 SYSTEMS SHALL BE THE TOTAL REPLACEMENT VALUE TO INCLUDE
 STRUCTURAL, ELECTRICAL, PLUMBING, MECHANICAL, INTERIOR
 FINISHES, NORMAL SITE WORK (EXCAVATION AND BACKFILL FOR
 BUILDINGS), ARCHITECTURAL AND DESIGN FEES, MARKETING
 COST, OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.) WITH REGIONAL ADJUSTMENTS
 FOR LOCATION AS PUBLISHED BY THE INTERNATIONAL CODE
 CONGRESS.
 THIS MAIN BUILDING PERMIT WILL INCLUDE THE FEES FOR THE
 MECHANICAL, ELECTRICAL, PLUMBING & ROOFING PERMITS.
 WHEN THE GENERAL CONTRACTOR COMES IN FOR A BUILDING
 PERMIT WITH THE SIGNED PERMIT APPLICATION FORM BY THE
 QUALIFIER AND OWNER AND BRINGS IN THE LISTED
 SUB-PERMITS M-E-P & ROOFING PERMITS SIGNED BY THE
 QUALIFIER OF EACH COMPANY, THEIR INSURANCES AND
 LICENSURE UP TO DATE, THE M-E-P AND ROOFING PERMITS ARE
 FREE OF CHARGE. IF THE M-E-P & ROOFING PERMITS COME IN
 LATER THERE WILL BE AN $80.00 ADMINISTRATIVE FEE FOR
 EACH PERMIT.
 ALL OTHER PERMITS FIRE SPRINKLER, FIRE ALARM, RACK
 STORAGE, EXHAUST HOODS, ANSUL SYSTEMS OR ALTERNATIVE
 AUTOMATIC FIRE-EXTINGUISHING SYSTEMS, WALK IN COOLERS &
 FREEZERS, ALL LOW VOLTAGE PERMITS, GENERATORS & FUEL
 TANKS, GAS PERMIT, POOL, JACUZZI AND ASSOCIATED
 SUB-PERMITS, AWNING, SCREEN ENCLOSURES, CANOPY, FENCE,
 LANDSCAPE, IRRIGATION, AUGER CAST PILE AND OR
 FOUNDATION OR STRUCTURE ONLY PERMIT WILL BE SEPARATE
 REVIEWS AND ASSOCIATED FEES WITH EACH PERMIT.
 PLEASE PROVIDE AN ITEMIZED LIST AND SUBTRACT THESE LINE
 ITEMS AND THEIR VALUE FROM THE OVERALL BUILDING VALUE
 STATED ON THE PERMIT APPLICATION FOR THIS PROJECT. THE
 REMAINING BALANCE WILL BE AFFECTIVELY THE VALUE OF THE
 BUILDING YOU WILL BE PAYING FOR THIS PERMIT. THE
 BUILDING DEPARTMENT DOES NOT WANT TO COLLECT TWICE FOR
 THE VALUE OF THESE SUB-PERMITS NOT COVERED UNDER THE
 PRIME OR MASTER PERMIT.
  
 3) THIS PROJECT IS A THRESHOLD BUILDING / FL S. S.
 553.71(7) "THRESHOLD BUILDING" MEANING ANY BUILDING
 WHICH IS GREATER THAN (3) STORIES OR 50 FT. IN HEIGHT,
 OR WHICH HAS AN ASSEMBLY OCCUPANCY CLASSIFICATION AS
 DENIED IN THE FLORIDA BUILDING CODE WHICH EXCEEDS 5,000
 SQ. FT. IN AREA AND AN OCCUPANT CONTENT OF GREATER THAN
 500 PERSONS.
  
 A) FBC (CITY AMENDMENTS)110.8.1 THRESHOLD INSPECTION
 PLAN. THE ENFORCING AGENCY SHALL REQUIRE A SPECIAL
 INSPECTOR TO PERFORM STRUCTURAL INSPECTIONS ON A
 THRESHOLD BUILDING PURSUANT TO A STRUCTURAL INSPECTION
 PLAN PREPARED BY THE ENGINEER OF RECORD. THE STRUCTURAL
 INSPECTION PLAN MUST BE SUBMITTED TO THE ENFORCING
 AGENCY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR
 THE CONSTRUCTION OF A THRESHOLD BUILDING. THE PURPOSE
 OF THE STRUCTURAL INSPECTION PLAN IS TO PROVIDE
 SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO THAT
 THE BUILDING CAN BE ADEQUATELY INSPECTED FOR COMPLIANCE
 WITH THE PERMITTED DOCUMENTS. THE SPECIAL INSPECTOR MAY
 NOT SERVE AS A SURROGATE IN CARRYING OUT THE
 RESPONSIBILITIES OF THE BUILDING OFFICIAL, THE
 ARCHITECT OR THE ENGINEER OF RECORD. THE CONTRACTOR'S
 CONTRACTUAL OR STATUTORY OBLIGATIONS ARE NOT RELIEVED
 BY ANY ACTION OF THE SPECIAL INSPECTOR.
  
 B) THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B.
 CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD
 BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5)
 FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY
 THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED
 TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED
 AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED
 BEFORE PERMIT ISSUANCE WILL TAKE PLACE.
  
 C) THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT
 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED
 TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF
 RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE
 ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND
 SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM
 BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS
 AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH
 THIS SECTION AND CHAPTER 633 FLORIDA STATUTES.
  
 D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME OF
 INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE RESUME
 MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED
 HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE WILL
 REVIEW THE RESUME. AFTER THE RESUME IS REVIEWED, AN
 INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES
 WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST
 MEETING THE ABOVE CRITERIA.
  
 E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY
 FOR THIS TYPE OF CONSTRUCTION.
  
 F) NOTE: FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE,
 PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING
 ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE
 APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR
 PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN
 COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR
 THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE
 IN BLACK & WHITE.
  
 G) 110.8.4.3 ALL SHORING AND RESHORING PROCEDURES,
 PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT
 AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING
 INSTALLATION SHALL BE SUPERVISED, INSPECTED AND
 CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING
 DOCUMENTS BY THE CONTRACTOR.
  
 H) PLEASE CALL THE CITY OF WEST PALM BEACH'S AUTOMATED
 TELEPHONE INSPECTIONS LINE (561) 805-6700 FOR ALL
 BUILDING INSPECTIONS FOR AUDITING OF JOBSITE
 INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6
 MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY.
  
 I) 110.8 THRESHOLD BUILDINGS, OPERATING GUIDELINES FOR
 THRESHOLD INSPECTORS #25. ASSURE THAT THE DESIGNER HAS
 REQUIRED ON THE PLANS OR SPECIFICATIONS ONE MATERIAL,
 APPROVED FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND
 CEILINGS.
  
 J) PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL
 BE HAPPY TO SEND YOU A COPY OF THE OCTOBER 2018
 GUIDELINES AND POLICIES FOR PROJECTS CONCERNING
 THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS.
  
 4) THIS PROJECT ISLOCATED IN A SPECIAL FLOOD HAZARD
 AREA (AE). SUBMIT A COPY OF THE LOMR FROM FEMA THAT IS
 MENTIONED IN YOUR RESPONSE. RESIDENTIAL BUILDINGS
 LOCATED IN A SPECIAL FLOOD HAZARD AREA ARE NOT ALLOWED
 TO HAVE BASEMENTS BELOW THE BFE. THE PROPOSED STRUCTURE
 IS LOCATED IN FLOOD ZONE AE WITH BASE FLOOD ELEVATIONS
 6 AND 7 NAVD 88. ACCORDING TO CITY ORDINANCE 4729-17
 SEC. 18-34 THE FINISH FLOOR ELEVATION NEEDS TO BE TWO
 FEET (FREEBOARD) ABOVE THE BASE FLOOD ELEVATION.
 BASEMENT FLOOR NEEDS TO BE RAISED.
 NOTE: ELEVATION CERTIFICATES ARE REQUIRED. INCLUDING
 CONSTRUCTION DRAWINGS, DURING CONSTRUCTION AND FINAL.
  
 5) THE CURRENT FLOOD MAPS WERE ADOPTED BY THE CITY OF
 WEST PALM BEACH ON OCTOBER 5, 2017. THE ELEVATIONS ON
 THE ADOPTED MAPS ARE IN NAVD 88. TO AVOID CONFUSION
 PLEASE SPECIFY ALL ELEVATIONS ON THE PLANS USING NAVD
 88. FBC 107.2.1
  
 6) CLARIFY THE FLOOD PANELS AT THE SERVICE WING THAT
 ARE SHOWN ON SHEET A-803A. DRY FLOOD PROOFING IS NOT
 ALLOWED BY FEMA FOR RESIDENTIAL OCCUPANCIES.
  
 7) THE SITE PLANS ARE REQUIRED MARKED FOR REFERENCE
 ONLY. ALL PLANS AND CONSTRUCTION DOCUMENTS THAT ARE
 SUBMITTED FOR PERMIT ARE REQUIRED TO BE SIGNED AND
 SEALED BY THE ENGINEER OR ARCHITECT THAT PREPARED THEM.
 FS 471 & 481
  
 8)FBC 110.8.4.4 REQUIRES ALL PLANS FOR THRESHOLD
 BUILDINGS WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY
 THE ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT
 THAT, TO THE BEST OF THE
 ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND
 SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM
 BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS
 AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH
 THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. THE
 STRUCTURAL PLANS STATE THIS IN THE TITLE BLOCK. I DID
 NOT SEE IT ON THE ARCHITECTURAL PLANS.
  
 9) COORDINATE THE DRAWING INDEX ON SHEET G-1 WITH THE
 PLAN SHEETS THAT ARE BEING UPLOADED. STRIKE OUT THE
 SHEETS THAT ARE NOT UPLOADED. FBC 107.2.1 SOME OF THE
 SHEETS ARE MISSING AND OTHERS SUCH AS A-110 AND A-125
 ARE DUPLICATED.
  
 10) SOME OF THE CODE SECTIONS THAT ARE SPECIFIED UNDER
 CODE NOTES ON SHEET G-2 ARE INCORRECT. PLEASE REVIEW
 AND CORRECT THEM. FBC 107.2.1
  
 11) CODE NOTE #26 ON SHEET G-2 SPECIFIES THE FLORIDA
 ASSEMBLY CODE 2012. IS THIS MEANT TO BE THE FLORIDA
 ACCESSIBILTY CODE? IF SO IT WILL BE THE 2017 EDITION.
  
 12) PLEASE CLARIFY WHICH AREAS OF THIS BUILDING WILL BE
 SUBJECT TO THE FLORIDA ACCESSIBILITY CODE AND WHAT
 AREAS ARE REQUIRED TO COMPLY WITH THE FEDERAL FAIR
 HOUSING ACT. FBC 107.2.1
  
 13) PLEASE PROVIDE ADDITIONAL ELEVATIONS FOR THE AREAS
 AROUND THE AMENITY LEVEL POOL AND SHOW THE ACCESIBLE
 ROUTES TO AND AROUND THE POOL. SHOW COMPLIANT RAMPS,
 LIFTS, ETC. 2017 FBC ACCESSIBILITY 402 / FAIR HOUSING
 GUIDELINES REQUIREMENT 2.
  
 14) THE ENTRY LOBBY RAMP DETAILS 1A AND 1B ON SHEET
 A-606 IS MISSING THE INFORMATION REQUIRED TO SHOW
 COMPLIANCE WITH FBC 1012 OR FBC ACCESSIBILITY 405.
  
 15) THE ENTRY LOBBY STAIR PLANS AND SECTIONS ON A-606
 ARE NOT CLEAR, ARE MISSING INFORMATION SUCH AS THE
 NUMBER OF RISERS AND RISER HEIGHT. CLARIFY THE CURVED
 HANDRAIL AND RADIUS.
  
 16) SPECIFY THE LOCATION OF THE PENTHOUSE POOL
 EQUIPMENT AND INDICATE HOW IT WILL BE ACCESSED. FBC
 107.2.1
  
 17) THE POOL EQUIPMENT ROOM 117, ON THE GROUND LEVEL IS
 SPECIFIED WITH A 2 HOUR FIRE RATED WALL, HOWEVER, IT
 DOES NOT HAVE AN ID TAG TIED TO A SPECIFIC WALL TYPE.
 FBC 107.2.1
  
 18) THE DOOR TO POOL EQUIPMENT ROOM 117 IS LOCATED IN A
 2 HOUR FIRE RATED WALL AND IS REQUIRED TO HAVE A 90
 MINUTE FIRE RATING. THIS IS NOT SPECIFIED. FBC 716.5.3
  
 19) ON SHEET LS-1 THE FSA ELEVATOR LOBBY HAS A 1 HOUR
 FIRE RATED WALL WITH A 60 MINUTE FIRE RATED DOUBLE DOOR
 AND THE DOOR FROM THE LOBBY TO THE 2 HOUR FIRE RATED
 EXIT ACCESS PASSAGE WAY DOES NOT HAVE A RATING
 SPECIFIED. EITHER THIS DOOR HAS TO HAVE A 90 MINUTE
 FIRE RATING OR THE DOUBLE DOOR HAS TO BE FIRE RATED FOR
 90 MIN. AND BE IN A TWO HOUR FIRE RATED WALL. FBC FBC
 TABLE 716.5
  
 20) ON SHEET LS-1 THE FIRE RATING OF THE DOOR FROM THE
 PARKING GARAGE TO THE 2 HOUR FIRE RATED PASSAGE WAY IS
 NOT SPECIFIED. FBC 716.5.3
  
 21) ON SHEET LS-1 THE FIRE RATING OF THE DOORS FROM THE
 PARKING GARAGE TO EXIT STAIR 3 ARE NOT SPECIFIED. FBC
 716.5.3
  
 22) ON SHEET LS-5 THE FIRE RATING OF THE DOOR TO THE
 TRASH ROOM IS NOT SPECIFIED.FBC 716.5.3
  
 23) THE DOOR TO THE STAFF ROOM ON LEVEL 3 IS NOT TAGGED
 OR IDENTIFIED ON THE LIFE SAFTEY OR ARCHITECTURAL PLAN
 SHEETS. FBC 107.2.1
  
 24) SHEET 151. A-103 MULTIPURPOSE ROOM 327 HAS DOORS IN
 THE 1 HOUR RATED CORRIDOR WALLS THAT ARE NOT IDENTIFIED
 ON THE LIFE SAFTEY OR ARCHITECTURAL PLAN SHEETS. FBC
 107.2.1
  
 25) THE FIRE RATING OF THE DOORS TO THE STORAGE ROOM
 AND THE TRASH ROOM IN THE 2 HOUR FIRE RATED WALLS ARE
 NOT SPECIFIED. FBC 107.2.1
  
 26) DOORS 2503 AND 2504 ARE LOCATED IN 2 HOUR FIRE
 RATED WALLS AND ARE SPECIFIED ON THE SCHEDULE AS 45
 MINUTE RATHER THAN 90 MINUTE FIRE RATED DOORS. FBC
 716.5.3
  
 27) DOOR 2504A IN THE 2 HOUR FIRE RATED WALL AND IS
 REQUIRED TO BE 90 MINUTE FIRE RATES IS NOT LISTED IN
 THE DOOR SCHEDULE. FBC 107.2.1
  
 28) ON SHEET LS-4 FOR LEVEL 3 THE IDENTIFICATION LINE
 FOR THE 1 HOUR FIRE RATED WALL IS SHOWN CROSSING THE
 OPENING TO THE LOUNGE/BAR AREA. IT APPEARS THAT A ONE
 HOUR FIRE RATED WALL AND 45 MINUTE RATED DOOR IS
 REQUIRED HERE. FBC TABLE 716.5
  
 29) THE CORRIDOR WALL TYPES ARE NOT IDENTIFIED WITH A
 CORRESPONDING TAG ON THE PLANS. FBC 107.2.1
  
 30) THE 2 HOUR FIRE RATED WALL TYPE IS NOT IDENTIFIED
 FOR THE WALLS AT THE FACE OF THE ELEVATORS. FBC 107.2.1
  
 31) THE 2 HOUR FIRE WALL IDENTIFICATION LINES ARE OUT
 OF PLACE AT THE ELEVATOR LOBBY ON SHEET LS-9. FBC
 107.2.1
  
 32) ON SHEET LS-6 THE 1 HOUR WALL IDENTIFICATION LINE
 IS MISTAKENLY INDICATED IN SIDE OF UNIT F. FBC 107.2.1
  
 33) ON SHEET A-901 DETAIL P/11 FOR THE 2 HOUR CMU WALL
 IN ORDER TO ACHIEVE A 2 HOUR FIRE RATING CLASSIFICATION
 D-2 CONCRETE BLOCK IS REQUIRED. FBC TABLE 721.1(2)
  
 34) SHOW COMPLIANCE WITH FBC ACCESSIBILITY CODE 209.2.1
 PASSENGER LOADING ZONES.PASSENGER LOADING ZONES, EXCEPT
 THOSE REQUIRED TO COMPLY WITH 209.2.2 AND 209.2.3,
 SHALL PROVIDE AT LEAST ONE PASSENGER LOADING ZONE
 COMPLYING WITH 503 IN EVERY CONTINUOUS 100 LINEAR FEET
 (30 M) OF LOADING ZONE SPACE, OR FRACTION THEREOF.
  
 35) SHOW COMPLIANCE WITH FBC ACCESSIBILITY CODE 209.4
 VALET PARKING.PARKING FACILITIES THAT PROVIDE VALET
 PARKING SERVICES SHALL PROVIDE AT LEAST ONE PASSENGER
 LOADING ZONE COMPLYING WITH 503.
  
 36) THE GRAB BAR REINFORCING AT THE BACK OF THE TOILET
 IS REQUIRED TO BE A MINIMUM OF 12" (1 FOOT) ON EACH
 SIDE OF THE TOILET CENTER LINE PER FAIR HOUSING
 GUIDELINES REQUIREMENT 6. PLEASE REVISE THE DETAIL ON
 SHEET G-5.
  
 37) IDENTIFY THE TWO REQUIRED FIRE SERVICE ACCESS
 ELEVATORS ON THE PLANS AND SHOW THAT THEY COMPLY WITH
 THE REQUIREMENTS OF FBC 403.6.1 AND 3007.1.
  
 38) SHOW COMPLIANCE WITH FBC 3007.3 WATER PROTECTION.
 AN APPROVED METHOD TO PREVENT WATER FROM INFILTRATING
 INTO THE HOISTWAY ENCLOSURE FROM THE OPERATION OF THE
 AUTOMATIC SPRINKLER SYSTEM OUTSIDE THE ENCLOSED FIRE
 SERVICE ACCESS ELEVATOR LOBBY SHALL BE PROVIDED.
  
 39) IDENTIFY THE REQUIRED ELEVATOR CAR TO ACCOMMODATE
 AMBULANCE STRETCHER AND SHOW THAT IT COMPLIES WITH FBC
 3002.4. ANY BUILDING THAT IS MORE THAN THREE STORIES
 HIGH OR IN WHICH THE VERTICAL DISTANCE BETWEEN THE
 BOTTOM TERMINAL LANDING AND THE TOP TERMINAL LANDING
 EXCEEDS 25 FEET (7620 MM), MUST BE CONSTRUCTED TO
 CONTAIN AT LEAST ONE PASSENGER ELEVATOR THAT IS
 OPERATIONAL FOR BUILDING OCCUPANTS AND FIRE DEPARTMENT
 EMERGENCY ACCESS TO ALL FLOORS. THE ELEVATOR CAR SHALL
 BE OF SUCH A SIZE AND ARRANGEMENT TO ACCOMMODATE AN
 AMBULANCE STRETCHER 24 INCHES BY 76 INCHES (610 MM BY
 1950 MM) WITH NOT LESS THAN 5-INCH (127 MM) RADIUS
 CORNERS, IN THE HORIZONTAL, OPEN POSITION AND SHALL BE
 IDENTIFIED BY THE INTERNATIONAL SYMBOL FOR EMERGENCY
 MEDICAL SERVICES (STAR OF LIFE). THE SYMBOL SHALL BE
 NOT LESS THAN 3 INCHES (76 MM) IN HEIGHT AND SHALL BE
 PLACED INSIDE ON BOTH SIDES OF THE HOISTWAY DOOR FRAME.
  
 40) FBC 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES
 OF THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS
 THOSE PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT
 THE TIME OF THE APPLICATION AND THAT ARE TO BE
 SUBMITTED TO THE BUILDING OFFICIAL WITHIN A SPECIFIED
 PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE
 PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL.
  
 41) W. P. B. 107.3.4.1 PRODUCT APPROVALS. THOSE
 PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03
 SHALL BE REVIEWED AND APPROVED IN WRITING BY THE
 DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL. FL 61G1-23.015 (2) THE
 ARCHITECT IS RESPONSIBLE FOR SUPERVISING AND REVIEWING
 ALL PROJECT DATA, REPORTS, SHOP DRAWINGS ETC..
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 42) SHOW COMPLIANCE WITH FBC 1207.2 FOR AIR-BORNE SOUND
 TRANSMISSION AND FBC 1207.3 FOR STRUCTURE BORNE SOUND
 INSULATION.
  
 NOTE: ADDITIONAL COMMENTS MAY RESULT FROM THE RESPONSES
 TO THESE COMMENTS. WHEN RESUBMITTING, IT IS HELPFUL TO
 PROVIDE A RESPONSE LETTER ADDRESSING EACH ITEM ALONG
 WITH THE CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE
 INSERT CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2019-08-19 Cont ID  
Sent By jpearson Date 2019-08-19 Time 15:30 Rev Time 0.00
Received By jpearson Date 2019-08-16 Time 13:42 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2019-06-10 Cont ID  
Sent By jpearson Date 2019-06-10 Time 15:30 Rev Time 0.00
Received By jpearson Date 2019-06-04 Time 13:28 Sent To  
Notes
2019-06-05 10:05:25CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: 3RD REVIEW, DENIED, SEE
 COMMENTS BELOW.
  
 BE ADVISED THAT THERE IS SO MUCH CONFLICTING AND
 INCOMPLETE INFORMATION ON THIS SUBMISSION THAT A FULL
 REVIEW WILL BE REQUIRED FOR THE NEXT REVIEW, LIKELY
 RESULTING IN FURTHER COMMENTS.
  
 PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED
 SATISFACTORILY HAVE BEEN REMOVED. PREVIOUS COMMENTS
 THAT HAVE NOT BEEN ADDRESSED SATISFACTORILY HAVE
 ADDITIONAL COMMENTS IN PARENTHESES. ANY NEW COMMENTS
 WILL BE LISTED AFTER PREVIOUS COMMENTS.
  
  
 14. SHEET E-102B, CIRCUIT AL-17 IS SHOWN FEEDING THE
 TRATAM ROOM. WHAT IS THIS ROOM USED FOR, IS GFCI
 PROTECTION REQUIRED. PROVIDE CLARIFICATION AND/OR
 CORRECTION. NEC 210.8; WPB FBC 107.2.1 (RESPONSE
 RECEIVED STATES THAT GFCI PROTECTION IS NOT REQUIRED. I
 DISAGREE, SEE CODE SECTION STATED AT THE END OF THIS
 COMMENT. LOCKER ROOMS REQUIRE GFCI PROTECTION. PROVIDE
 CORRECTION. NEC 210.8(B)(7) )
 84. LIGHTING SHEETS (ALL) DO NOT SHOW THE AUTOMATIC
 CONTROL REQUIRED. PROVIDE THE ADDITIONAL AUTOMATIC
 LIGHTING CONTROLS STIPULATED IN THE FBC ENERGY CODE.
 FBC EC C405.2 (RESPONSE LETTER STATES THIS IS PROVIDED,
 BUT IT HAS NOT BEEN PROVIDED. NONE OF THE INTERIOR
 SPACES I CHECHED SHOW THE AUTOMATIC CONTROL REQUIRED.
 PROVIDE CORRECTION.)
 85. PROVIDE GRAPH/CALCULATION OF EXTERIOR LIGHTING
 POWER ALLOWANCES PER THE FBC ENERGY CONSERVATION IN
 RELATION TO THE CONNECTED EXTERIOR LIGHTING PROPOSED TO
 COMPLY WITH CODE. FBC EC C405.5.1 (NOT SURE WHICH CODE
 BOOK YOU ARE LOOKING IN, BUT C405.6.2 AS MENTIONED IN
 YOUR RESPONSE IS NOT THE SECTION FROM THE CURRENT CODE
 THAT REQUIRES EXTERIOR LIGHTING COMPLIANCE. PROVIDE AS
 PREVIOUSLY REQUESTED.)
 97. ON RISER DIAGRAM PANEL EQEH IS SHOWN AS A 1200 AMP
 PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS
 SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC
 107.2.1 (STILL NOT CORRECTED. E-502 AND E-602 SHOW EQEH
 AS AN 800 AMP PANEL. LOAD CALCULATION ON E-601A STATES
 THIS IS A 1200 AMP PANEL WITH A LOAD OF 963 AMPS.
 PROVIDE CORRECTION.)
 102. AS ADJUSTMENTS ARE MADE TO DISCREPANCIES IN PLAN,
 PROVIDE UPDATED LOAD CALCULATION FOR EACH PANEL AND
 SERVICE. NEC 220 (LOAD CALCULATION STILL NOT CORRECT OR
 COMPLETE, SEE NEW COMMENTS BELOW.)
 103. SHEET E-601A, LOADS LISTED FOR LOAD CALCULATION
 SHOWN ARE MUCH DIFFERENT THAN THE LOADS SHOWN IN THE
 CORRESPONDING PANEL SCHEDULES. PROVIDE CLARIFICATION
 AND CORRECTION. WPB FBC 107.2.1; NEC 220 (THIS COMMENT
 NOT ADDRESSED SATISFACTORILY, SEE NEW COMMENTS.)
 107. LOAD FOR PANEL H SHOWN IN PANEL SCHEDULE FOR PANEL
 MDP1 IS MUCH DIFFERENT THAN THE LOAD SHOWN IN THE PANEL
 SCHEDULE FOR PANEL H. PROVIDE CORRECTION. WPB FBC
 107.2.1; NEC 220 (NOT CORRECTED, SEE NEW COMMENTS FOR
 FURTHER EXPLANATION.)
 111. PROVIDE PANEL SCHEDULE FOR ALL PANELS. SOME ARE
 MISSING, SUCH AS RDEH AND RH. WPB FBC 107.2.1; NEC
 408.4 (NOT ALL PANEL SCHEDULES PROVIDED.)
  
 NEW COMMENTS:
  
 114. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD FOR
 EQEH IS SHOWN IN ON E-601A AS 963 AMPS. PANEL SCHEDULE
 FOR EM ON SHEET E-602 SHOWS THIS IS BEING FED FROM AN
 800 AMP BREAKER WITH THREE SETS OF 400 KCMIL AL WIRE,
 WHICH IS RATED FOR 810 AMPS. PROVIDE CORRECTION. NEC
 215.2, 408.30, 408.36
 115. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD
 CALCULATION ON SHEET E-601A SHOWS A LOAD OF 1451 AMPS
 FOR PANEL EM. SHEET E-602 SHOWS A LOAD OF 557 AMPS FOR
 THE SAME PANEL. CORRECT DISCREPANCY, UPDATE LOAD
 CALCULATION AS NEEDED. WPB FBC 107.2.1; NEC 220, 215.2,
 215.5, 408.30, 408.36
 116. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD
 CALCULATION ON SHEET E-601A SHOWS A 3RD LOAD ON THE 480
 VOLT SERVICE FOR RETAILS. THIS IS NOT SHOWN ON RISER
 DIAGRAM OR ANY OTHER LOCATION. PROVIDE DETAILS. WPB FBC
 107.2.1
 117. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD
 CALCULATION ON SHEET E-601A SHOWS A LOAD OF 596 AMPS
 FOR MDP1. ON SHEET E-605, THIS PANEL SHOWS A LOAD OF
 1101 AMPS. CORRECT DISCREPANCY, UPDATE LOAD CALCULATION
 AS NEEDED. NEC 220; WPB FBC 107.2.1
 118. SHEET E-601A SHOWS MDP1 AS AN 800 AMP PANEL.
 SHEETS E-502 AND E-605 SHOW IT AS 1200 AMP. CORRECT
 DISCREPANCY, UPDATE LOAD CALCULATION AS NEEDED. WPB FBC
 107.2.1; NEC 220, 215.2, 215.5, 408.30, 408.36
 119. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD
 CALCULATION ON SHEET E-601A SHOWS A LOAD OF 481 AMPS IN
 PANEL SCHEDULE FOR MDP1. SHEET E-605 SHOWS A LOAD OF
 872 AMPS FOR THIS PANEL. WPB FBC 107.2.1; NEC 220,
 215.2, 215.5, 408.30, 408.36
 120. SHEET E-601A SHOWS PANEL H FED FROM MDP1 ON A 700
 AMP BREAKER, AND THE FEEDERS AS THREE SETS OF 350 AL
 KCMIL, WHICH IS RATED FOR 750 AMPS. CORRECT CONDUCTOR
 AND BREAKER SIZE TO MATCH RESULTS FROM COMMENT 119. NEC
 220, 215.2, 215.5, 310.15(B)(16), 408.30, 408.36
 121. PANEL SCHEDULE FOR PANEL GMP SHOWS A LOAD NAMED TE
 THAT IS 408 KVA. PROVIDE DETAILS AND PANEL SCHEDULE,
 UPDATE LOAD CALCULATION AS NEEDED. SHEET E-601A SHOWS A
 LOAD OF 360 KVA FOR EDPH, A LOAD OF 800 KVA FOR EQEH,
 AND A LOAD OF 45 KVA FOR EOPH. WHEN THIS IS ADDED TO
 THE LOAD OF 408 KVA FOR TE, THE GENERATOR WOULD BE
 OVERLOADED. PROVIDE CLAIFICATIONS AND CORRECTIONS AS
 NEEDED. WPB FBC 107.2.1; NEC 220, 215.2, 215.5, 408.30,
 408.36
 122. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD
 CALCULATION ON SHEET E-601A SHOWS A LOAD OF 433.5 AMPS
 FOR PANEL EDPH. SHEET E-602 SHOWS A LOAD OF 179 AMPS.
 CORRECT DISCREPANCY, UPDATE LOAD CALCULATION AS NEEDED.
 WPB FBC 107.2.1; NEC 220, 215.2, 215.5, 408.30, 408.36
 123. PROVIDE VOLTAGE DROP CALCULATIONS TO COMPLY WITH
 CODE FOR ENTIRE SYSTEM. CURRENTLY, THE ONLY VOLTAGE
 DROP PROVIDED IS FOR THE LOADS ON SHEET E-601. NONE OF
 THE LOADS ON SHEET E-601A SHOW THE VOLTAGE DROP
 CALCULATIONS. PROVIDE CORRECTION. FBC EC C405.6.3
 124. PROVIDE BLOCK NOTE INDICATING COMPLIANCE: WITHIN
 30 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD
 DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDE TO
 THE BUILDING OWNER, INCLUDING: 1. A SINGLE LINE DIAGRAM
 OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM AND 2.
 FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR ALL
 DISTRIBUTION. FBC EC C405.6.4.1
 125. NO LOAD CALCULATION FOR GUEST SUITES IS PROVIDED
 OR INCLUDED IN THE LOAD CALCULATION ON SHEET E-601 FOR
 METER CENTER 1 / PANEL L. PROVIDE CORRECTION. WPB FBC
 107.2.1; NEC 220, 215.2, 215.5, 408.30, 408.36
 126. SHEET E-501 AND E-502 ARE NAMED RESIDENTIAL POWER
 RISER DIAGRAM. ONLY ONE OF THEM IS THE RESIDENTIAL
 PORTION, THE OTHER IS NOT. PROVIDE DISTINCT NAME FOR
 PLAN SHEET FOR CLARITY. WPB FBC 107.2.1
 127. SHEET E-229 SHOWS A 125 AMP PANEL FOR PH-D. LOAD
 CALCULATION PROVIDED SHOWS A LOAD FOR THIS UNIT OF 272
 AMPS. PROVIDE CORRECTION. PROVIDE WIRE AND CONDUIT
 SIZES FOR FEEDS TO UNIT PANEL. PROVIDE ACCURATE
 LOCATION OF ELECTRICAL PANEL. ALL PANEL SCHEDULES FOR
 THE UNITS STATE THAT THE PANEL IS IN THE UTILITY ROOM,
 BUT THIS IS NOT THE CASE. EDIT LOCATIONS IN PANEL
 SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM CODE
 COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS
 REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC
 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30,
 408.36
 128. SHEET E-227 AND E-228 SHOWS A 125 AMP PANEL FOR
 PH-B AND PH-C. LOAD CALCULATION PROVIDED SHOWS A LOAD
 FOR THIS UNIT OF 202 AND 200 AMPS, RESPCTIVELY. PROVIDE
 CORRECTION. PROVIDE WIRE AND CONDUIT SIZES FOR FEEDS TO
 UNIT PANEL. PROVIDE ACCURATE LOCATION OF ELECTRICAL
 PANEL. ALL PANEL SCHEDULES FOR THE UNITS STATE THAT THE
 PANEL IS IN THE UTILITY ROOM, BUT THIS IS NOT THE CASE.
 EDIT LOCATIONS IN PANEL SCHEDULES AND SHOW LOCATION ON
 PLAN TO CONFIRM CODE COMPLIANCE. REMOVE OR EDIT CLOUDS
 FROM PREVIOUS REVISIONS THAT BLOCK OTHER INFORMATION ON
 PLAN. WPB FBC 107.2.1; NEC 220, 215.2, 215.5,
 310.15(B)(16), 408.30, 408.36
 129. SHEET E-226 SHOWS A 125 AMP PANEL FOR PH-A. LOAD
 CALCULATION PROVIDED SHOWS A LOAD FOR THIS UNIT OF 190
 AMPS. PROVIDE CORRECTION. PROVIDE WIRE AND CONDUIT
 SIZES FOR FEEDS TO UNIT PANEL. PROVIDE ACCURATE
 LOCATION OF ELECTRICAL PANEL. ALL PANEL SCHEDULES FOR
 THE UNITS STATE THAT THE PANEL IS IN THE UTILITY ROOM,
 BUT THIS IS NOT THE CASE. EDIT LOCATIONS IN PANEL
 SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM CODE
 COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS
 REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC
 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30,
 408.36
 130. SHEET E-225 SHOWS A 125 AMP PANEL FOR UNIT F. LOAD
 CALCULATION PROVIDED SHOWS A LOAD FOR THIS UNIT OF 154
 AMPS. PROVIDE CORRECTION. PROVIDE WIRE AND CONDUIT
 SIZES FOR FEEDS TO UNIT PANEL. PROVIDE ACCURATE
 LOCATION OF ELECTRICAL PANEL. ALL PANEL SCHEDULES FOR
 THE UNITS STATE THAT THE PANEL IS IN THE UTILITY ROOM,
 BUT THIS IS NOT THE CASE. EDIT LOCATIONS IN PANEL
 SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM CODE
 COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS
 REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC
 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30,
 408.36
 131. SHEET E-224 SHOWS A 125 AMP PANEL FOR UNIT E. LOAD
 CALCULATION PROVIDED SHOWS A LOAD FOR THIS UNIT OF 157
 AMPS. PROVIDE CORRECTION. PROVIDE WIRE AND CONDUIT
 SIZES FOR FEEDS TO UNIT PANEL. PROVIDE ACCURATE
 LOCATION OF ELECTRICAL PANEL. ALL PANEL SCHEDULES FOR
 THE UNITS STATE THAT THE PANEL IS IN THE UTILITY ROOM,
 BUT THIS IS NOT THE CASE. EDIT LOCATIONS IN PANEL
 SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM CODE
 COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS
 REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC
 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30,
 408.36
 132. SHEET E-223 SHOWS A 125 AMP PANEL FOR UNIT D.
 PROVIDE WIRE AND CONDUIT SIZES FOR FEEDS TO UNIT PANEL.
 PROVIDE ACCURATE LOCATION OF ELECTRICAL PANEL. ALL
 PANEL SCHEDULES FOR THE UNITS STATE THAT THE PANEL IS
 IN THE UTILITY ROOM, BUT THIS IS NOT THE CASE. EDIT
 LOCATIONS IN PANEL SCHEDULES AND SHOW LOCATION ON PLAN
 TO CONFIRM CODE COMPLIANCE. REMOVE OR EDIT CLOUDS FROM
 PREVIOUS REVISIONS THAT BLOCK OTHER INFORMATION ON
 PLAN. WPB FBC 107.2.1; NEC 220, 215.2, 215.5,
 310.15(B)(16), 408.30, 408.36
 133. SHEET E-222 SHOWS A 125 AMP PANEL FOR UNIT C.
 PROVIDE WIRE AND CONDUIT SIZES FOR FEEDS TO UNIT PANEL.
 PROVIDE ACCURATE LOCATION OF ELECTRICAL PANEL. ALL
 PANEL SCHEDULES FOR THE UNITS STATE THAT THE PANEL IS
 IN THE UTILITY ROOM, BUT THIS IS NOT THE CASE. EDIT
 LOCATIONS IN PANEL SCHEDULES AND SHOW LOCATION ON PLAN
 TO CONFIRM CODE COMPLIANCE. REMOVE OR EDIT CLOUDS FROM
 PREVIOUS REVISIONS THAT BLOCK OTHER INFORMATION ON
 PLAN. WPB FBC 107.2.1; NEC 220, 215.2, 215.5,
 310.15(B)(16), 408.30, 408.36
 134. SHEET E-221 SHOWS A 125 AMP PANEL FOR UNIT B. LOAD
 CALCULATION PROVIDED SHOWS A LOAD FOR THIS UNIT OF 126
 AMPS. PROVIDE CORRECTION. PROVIDE WIRE AND CONDUIT
 SIZES FOR FEEDS TO UNIT PANEL. PROVIDE ACCURATE
 LOCATION OF ELECTRICAL PANEL. ALL PANEL SCHEDULES FOR
 THE UNITS STATE THAT THE PANEL IS IN THE UTILITY ROOM,
 BUT THIS IS NOT THE CASE. EDIT LOCATIONS IN PANEL
 SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM CODE
 COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS
 REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC
 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30,
 408.36
 135. SHEET E-220 SHOWS A 125 AMP PANEL FOR UNIT A.
 PROVIDE WIRE AND CONDUIT SIZES FOR FEEDS TO UNIT PANEL.
 PROVIDE ACCURATE LOCATION OF ELECTRICAL PANEL. ALL
 PANEL SCHEDULES FOR THE UNITS STATE THAT THE PANEL IS
 IN THE UTILITY ROOM, BUT THIS IS NOT THE CASE. EDIT
 LOCATIONS IN PANEL SCHEDULES AND SHOW LOCATION ON PLAN
 TO CONFIRM CODE COMPLIANCE. REMOVE OR EDIT CLOUDS FROM
 PREVIOUS REVISIONS THAT BLOCK OTHER INFORMATION ON
 PLAN. WPB FBC 107.2.1; NEC 220, 215.2, 215.5,
 310.15(B)(16), 408.30, 408.36
 136. SHEET E-230 SHOWS A 125 AMP PANEL FOR GUEST
 SUITES. PROVIDE LOAD CALCULATION FOR PANEL. PROVIDE
 WIRE AND CONDUIT SIZES FOR FEEDS TO UNIT PANEL. PROVIDE
 ACCURATE LOCATION OF ELECTRICAL PANEL. ALL PANEL
 SCHEDULES FOR THE UNITS STATE THAT THE PANEL IS IN THE
 UTILITY ROOM, BUT THIS IS NOT THE CASE. EDIT LOCATIONS
 IN PANEL SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM
 CODE COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS
 REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC
 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30,
 408.36
 137. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD
 CALCULATION ON SHEET E-601A SHOWS A LOAD OF 54.2 AMPS
 FOR PANEL EOPH. SHEET E-602 SHOWS A LOAD OF 96 AMPS.
 CORRECT DISCREPANCY, UPDATE LOAD CALCULATION AS NEEDED.
 WPB FBC 107.2.1; NEC 220, 215.2, 215.5, 408.30, 408.36
 138. DIAGRAM ON SHEET E-501 SHOWS TWO PANELS IN EVERY
 UNIT WITH A TRANSFER SWITCH. THIS DETAIL IS NOT
 REFLECTED ANYWHERE ELSE IN PLAN. ENLARGED UNIT PLANS
 SHOULD SHOW CONTAIN THIS INFORMATION, INCLUDING WHAT
 LOADS ARE ON MAIN PANEL AND WHICH ARE ON EMERGENCY
 PANEL. SHOW LOCATION OF PANELS IN THE UNITS. PROVIDE
 DETAILS. WPB FBC 107.2.1; NEC 215.5, 220
 139. SHEET E-502 SHOWS A 1000 KW GENERATOR. LOAD
 CALCULATION PROVIDED ON SHEET E-601A SHOWS A LOAD OF
 1205 KVA ON EMERGENCY SYSTEM, AND A LOAD OF 200 KVA FOR
 FIRE PUMP, FOR A TOTAL OF 1405 KVA. THE LEGALLY
 REQUIRED GENERATOR MUST BE SIZED TO HANDLE ALL OF THIS
 LOAD. PROVIDE CORRECTION. NEC 695.3(D)(1), 701.4
 140. SHEET E-701, DETAILS 3, 4, AND 5 DO NOT IDENTIFY
 THE EQUIPMENT IN THE ELECTRICAL ROOMS. PROVIDE
 CORRECTION. WPB FBC 107.2.1
 141. PROVIDE LIGHT FIXTURE LEGEND AND SCHEDULE TO
 CORRESPOND WITH DRAWINGS. LIGHTING IN BATHTUB OR SHOWER
 AREAS SHALL BE SUITABLE FOR DAMP LOCATIONS. LIGHTING
 WITH OPEN OR PARTIALLY ENCLOSED LAMPS AND PENDANT
 LUMINAIRES OR LAMPHOLDERS SHALL NOT BE PERMITTED IN
 CLOTHES CLOSETS. NONE OF THESE ARE CLEAR ON PLAN,
 PROVIDE CORRECTION. NEC 410.10(D), 410.16.
 142. PROVIDE COMPLIANCE WITH FBC C402.5.8: RECESSED
 LUMINAIRES INSTALLED IN THE BUILDING THERMAL ENVELOPE
 SHALL BE ALL OF THE FOLLOWING:
  1.IC-RATED.
  2.LABELED AS HAVING AN AIR LEAKAGE RATE OF NOT MORE
 2.0 CFM (0.944 L/S) WHEN TESTED IN ACCORDANCE WITH ASTM
 E283 AT A 1.57 PSF (75 PA) PRESSURE DIFFERENTIAL.
  3.SEALED WITH A GASKET OR CAULK BETWEEN THE HOUSING
 AND INTERIOR WALL OR CEILING COVERING.
 143. PLEASE BE ADVISED THAT SOME OF THESE COMMENTS HAVE
 NOT BEEN ADDRESSED FOR TWO REVIEWS. IF UPON THE NEXT
 REVIEW, IF IT IS NECESSARY TO REJECT THE SUBMITTED PLAN
 AGAIN FOR THE SAME REASONS, AN ADDITIONAL PLAN REVIEW
 IS REQUIRED. FLORIDA STATUTES STATE: WITH RESPECT TO
 EVALUATION OF DESIGN PROFESSIONALS DOCUMENTS, IF A
 LOCAL GOVERNMENT FINDS IT NECESSARY, IN ORDER TO
 ENFORCE COMPLIANCE WITH THE FLORIDA BUILDING CODE AND
 ISSUE A PERMIT, TO REJECT DESIGN DOCUMENTS REQUIRED BY
 THE CODE THREE OR MORE TIMES FOR FAILURE TO CORRECT A
 CODE VIOLATION SPECIFICALLY AND CONTINUOUSLY NOTED IN
 EACH REJECTION, INCLUDING, BUT NOT LIMITED TO, EGRESS,
 FIRE PROTECTION, STRUCTURAL STABILITY, ENERGY,
 ACCESSIBILITY, LIGHTING, VENTILATION, ELECTRICAL,
 MECHANICAL, PLUMBING, AND GAS SYSTEMS, OR OTHER
 REQUIREMENTS IDENTIFIED BY RULE OF THE FLORIDA BUILDING
 COMMISSION ADOPTED PURSUANT TO CHAPTER 120, THE LOCAL
 GOVERNMENT SHALL IMPOSE, EACH TIME AFTER THE THIRD SUCH
 REVIEW THE PLANS ARE REJECTED FOR THAT CODE VIOLATION,
 A FEE OF FOUR TIMES THE AMOUNT OF THE PROPORTION OF THE
 PERMIT FEE ATTRIBUTED TO PLANS REVIEW. FS 553.80(2)(B)
 THE ADDITIONAL FEE FOR THIS PROJECT WOULD BE
 $735,550.00
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  
  

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2019-02-12 Cont ID  
Sent By jpearson Date 2019-02-12 Time 15:45 Rev Time 0.00
Received By jpearson Date 2019-02-08 Time 11:22 Sent To  
Notes
2019-02-12 09:17:38CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED
 SATISFACTORILY HAVE BEEN REMOVED. PREVIOUS COMMENTS
 THAT HAVE NOT BEEN ADDRESSED SATISFACTORILY HAVE
 ADDITIONAL COMMENTS IN PARENTHESES. ANY NEW COMMENTS
 WILL BE LISTED AFTER PREVIOUS COMMENTS.
  
  
 14. SHEET E-102B, CIRCUIT AL-17 IS SHOWN FEEDING THE
 TRATAM ROOM. WHAT IS THIS ROOM USED FOR, IS GFCI
 PROTECTION REQUIRED. PROVIDE CLARIFICATION AND/OR
 CORRECTION. NEC 210.8; WPB FBC 107.2.1 (BASED ON
 DESCRIPTION PROVIDED, GFCI PROTECTION IS REQUIRED.
 PROVIDE CORRECTION. NEC 210.8(B)(7) )
 15. SHEET E-102B, CIRCUIT AL-1, 3, 5 IS SHOWN FEEDING
 HP-2L-2, BUT THE PANEL SCHEDULE SHOWS CIRCUIT 1 AND 3
 FEEDING POOL RECEPTACLES. PROVIDE CORRECTION. WPB FBC
 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED
 SHEET, THIS INFORMATION IS STILL SHOWN.)
 16. SHEET E-103, ALL RECEPTACLE OUTLETS IN CATERING
 KITCHEN AND PERFORMANCE KITCHEN REQUIRE GFCI
 PROTECTION. PROVIDE CORRECTION. NEC 210.8(B)(2) (IT
 SEEMS WE DID NOT RECEIVE THE CORRECTED SHEET, THIS
 INFORMATION IS STILL SHOWN.)
 84. LIGHTING SHEETS (ALL) DO NOT SHOW THE AUTOMATIC
 CONTROL REQUIRED. PROVIDE THE ADDITIONAL AUTOMATIC
 LIGHTING CONTROLS STIPULATED IN THE FBC ENERGY CODE.
 FBC EC C405.2 (NOT PROVIDED, THIS IS FOR INTERIOR
 SPACES NOT PART OF A DWELLING UNIT.)
 85. PROVIDE GRAPH/CALCULATION OF EXTERIOR LIGHTING
 POWER ALLOWANCES PER THE FBC ENERGY CONSERVATION IN
 RELATION TO THE CONNECTED EXTERIOR LIGHTING PROPOSED TO
 COMPLY WITH CODE. FBC EC C405.5.1 (NOT PROVIDED.)
 87. SHEET E-501, LABEL ALL FEEDERS TO SHOW WIRE AND
 CONDUIT SIZE. WPB FBC 107.2.1; NEC 310.15 (FROM FPL
 VAULT TO MAINS NOT SHOWN.)
 91. SHEET E-502, LABEL ALL FEEDERS TO SHOW WIRE AND
 CONDUIT SIZE. WPB FBC 107.2.1; NEC 310.15 (FROM FPL
 VAULT TO MAINS NOT SHOWN. TRANSFORMER SCHEDULE PASTED
 OVER RISER AND IS DIFFICULT TO READ.)
 94. PROVIDE DETAILS OF ARC FLASH MITIGATION FOR ALL
 MAINS PER CODE. NEC 240.87 (ARC FAULT MITIGATION IS NOT
 RELIANT ON THE AIC CALCULATION. SEE CODE SECTION FOR
 METHODS OF COMPLIANCE.)
 95. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR
 EACH PANEL INCLUDING INFORMATION FROM THE POWER COMPANY
 STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR
 THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE
 SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE.
 NEC 110.9, 110.10 (NOT PROVIDED, NOTED THAT THE
 APPLICANT IS WAITING ON FPL. THIS CAN BE A DEFERRED
 SUBMITTAL IF YOU CHOOSE. BE AWARE THAT APPLICANT WOULD
 BE PROCEEDING AT YOUR OWN RISK UNTIL THIS INFORMATION
 IS OBTAINED. IF SO DESIRED, PROVIDE NOTE ON PLAN TO
 THAT EFFECT.)
 96. ON RISER DIAGRAM PANEL EQPH IS SHOWN AS A 100 AMP
 PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS
 SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC
 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED
 PANEL SCHEDULE SHEET, THIS INFORMATION IS STILL SHOWN.)
 97. ON RISER DIAGRAM PANEL EQEH IS SHOWN AS A 1200 AMP
 PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS
 SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC
 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED
 PANEL SCHEDULE SHEET, THIS INFORMATION IS STILL SHOWN.)
 98. ON RISER DIAGRAM PANEL EDPH IS SHOWN AS A 600 AMP
 PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS
 SHOWN AS AN 1200 AMP PANEL. PROVIDE CORRECTION. WPB FBC
 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED
 PANEL SCHEDULE SHEET, THIS INFORMATION IS STILL SHOWN.)
 102. AS ADJUSTMENTS ARE MADE TO DISCREPANCIES IN PLAN,
 PROVIDE UPDATED LOAD CALCULATION FOR EACH PANEL AND
 SERVICE. NEC 220 (IT SEEMS WE DID NOT RECEIVE THE
 CORRECTED SHEET, THIS INFORMATION IS STILL SHOWN.)
 103. SHEET E-601A, LOADS LISTED FOR LOAD CALCULATION
 SHOWN ARE MUCH DIFFERENT THAN THE LOADS SHOWN IN THE
 CORRESPONDING PANEL SCHEDULES. PROVIDE CLARIFICATION
 AND CORRECTION. WPB FBC 107.2.1; NEC 220 (IT SEEMS WE
 DID NOT RECEIVE THE CORRECTED SHEET, THIS INFORMATION
 IS STILL SHOWN.)
 104. WHERE ARE ELEVATORS FED FROM? I COULD NOT FIND
 THIS LOAD INCLUDED IN THE LOAD CALCULATION OR IN ANY
 PANEL SCHEDULES. PROVIDE CORRECTION. WPB FBC 107.2.1;
 NEC 220 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED
 SHEET, THIS INFORMATION IS STILL SHOWN.)
 105. MANY OF THE PANEL SCHEDULES PROVIDED ARE
 INCOMPLETE. HOW CAN AN ACCURATE LOAD CALCULATION BE
 PROVIDED WITH THIS MUCH MISSING INFORMATION. PROVIDE
 CORRECTION. WPB FBC 107.2.1; NEC 220 (IT SEEMS WE DID
 NOT RECEIVE THE CORRECTED SHEET, THIS INFORMATION IS
 STILL SHOWN.)
 106. RISER DIAGRAM STATES THAT MDP1 IS ONE OF THE
 MAINS. THE PANEL SCHEDULE FOR THIS PANEL DOES NOT SHOW
 A MAIN. PROVIDE CORRECTION. WPB FBC 107.2.1; NEC 230.2
 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED SHEET, THIS
 INFORMATION IS STILL SHOWN.)
 107. LOAD FOR PANEL H SHOWN IN PANEL SCHEDULE FOR PANEL
 MDP1 IS MUCH DIFFERENT THAN THE LOAD SHOWN IN THE PANEL
 SCHEDULE FOR PANEL H. PROVIDE CORRECTION. WPB FBC
 107.2.1; NEC 220 (IT SEEMS WE DID NOT RECEIVE THE
 CORRECTED SHEET, THIS INFORMATION IS STILL SHOWN.)
 108. RISER DIAGRAM STATES THAT THE EMERGENCY MAINS ARE
 MAINS 2 AND 3. THE PANEL SCHEDULE FOR THESE PANELS DOES
 NOT SHOW A MAIN. PROVIDE CORRECTION. WPB FBC 107.2.1;
 NEC 230.2 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED
 SHEET, THIS INFORMATION IS STILL SHOWN.)
  
 NEW COMMENTS:
  
 109. PROVIDE LEGIBLE SHEET FOR E-502. THERE ARE
 GENERATOR SPECS PASTED OVER THE DRAWING KEYNOTES,
 MAKING PART OF THIS SHEET ILLEGIBLE. WPB FBC 107.2.1
 110. CORRECT DISCREPANCY FOR 75KVA TRANSFORMER FEEDING
 PANEL RL. RISER SHOWS IT BEING FED FROM PANEL RH. PANEL
 SCHEDULE SHOWS IT BEING FED FROM PANEL RDH. WPB FBC
 107.2.1
 111. PROVIDE PANEL SCHEDULE FOR ALL PANELS. SOME ARE
 MISSING, SUCH AS RDEH AND RH. WPB FBC 107.2.1; NEC
 408.4
 112. SHEET E-701, GENERATOR AND EMERGENCY ROOM ?
 ENLARGED PLAN, IT APPEARS THERE IS A WALL BUILT IN
 FRONT OF PANELS EOPH, EOL, EQEH, EQH, EQL, AND THE TWO
 TRANSFORMERS ON THAT WALL. PROVIDE CLARIFICATION AND/OR
 CORRECTION. NEC 110.26; WPB FBC 107.2.1
 113. BE ADVISED THAT FIRE ALARM, LOW VOLTAGE SYSTEMS,
 DAS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL HOOD
 SYSTEMS, WALK IN COOLERS, SIGNS, SITE LIGHTING, AND
 SWIMMING POOLS (WHERE APPLICABLE) ARE NOT INCLUDED IN
 THE SCOPE OF THIS PLAN REVIEW. PROVIDE A BLOCK NOTE
 INDICATING THE REQUIRED SEPARATE PERMITS AND PLAN
 SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. WPB FBC
 105.1, 107.2.1
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-10-19 Cont ID  
Sent By jpearson Date 2018-10-19 Time 15:55 Rev Time 0.00
Received By jpearson Date 2018-10-17 Time 12:21 Sent To  
Notes
2018-10-18 08:58:07CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 BE ADVISED THAT THERE IS SO MUCH CONFLICTING AND
 INCOMPLETE INFORMATION ON THIS SUBMISSION THAT A FULL
 REVIEW WILL BE REQUIRED FOR THE SECOND REVIEW, LIKELY
 RESULTING IN FURTHER COMMENTS.
  
 1. SHEET E-001, PLAN STATES THAT IT IS NOT FOR
 CONSTRUCTION OR PERMIT PURPOSES. REMOVE STATEMENT AND
 PROVIDE COMPLETED PERMIT SET FOR REVIEW. WPB FBC
 107.2.1
 2. SHEET E-001, NOTE 4, THE NEC AND FBC SPECIFIED FOR
 DESIGN IS NOT THE CURRENT CODE. PROVIDE CORRECTION. FBC
 PREFACE (ALSO SEE CURRENT CODES ABOVE)
 3. SHEET E-001, NOTE 63, AFCI PROTECTION SHOWN IN NOT
 CODE COMPLIANT. ALL BRANCH CIRCUITS THAT SUPPLY
 120-VOLT, SINGLE-PHASE, 15- AND 20-AMPERE OUTLETS
 INSTALLED IN KITCHENS, FAMILY ROOMS, DINING ROOMS,
 LIVING ROOMS, PARLORS, LIBRARIES, DENS, BEDROOMS,
 SUN-ROOMS, RECREATIONS ROOMS, CLOSETS, HALLWAYS,
 LAUNDRY AREAS AND SIMILAR ROOMS OR AREAS SHALL BE AFCI
 PROTECTED. THIS INCLUDES LIGHTING AND POWER OUTLETS AND
 RECEPTACLES. SOME AREAS REQUIRE BOTH AFCI AND GFCI
 PROTECTION. PROVIDE CORRECTION. NEC 210.8, 210.12
 4. SHEET E-001, NOTE 68, STATES THAT RECEPTACLES SHALL
 BE TAMPER RESISTANT PER NEC 406.11. THIS CODE SECTION
 DOES NOT APPLY TO TAMPER RESISTANT RECEPTACLES. PROVIDE
 CORRECTION. NEC 406.12
 5. SHEET E-001, NOTE 79, REFERS TO THE 2010 FBC FOR
 STAIRS. PROVIDE CLARIFICATION FOR PERTINENCE TO
 ELECTRICAL REVIEW. PROVIDE CORRECT CODE FOR DESIGN. WPB
 FBC 107.2.1; FBC PREFACE (ALSO SEE CURRENT CODES ABOVE)
 6. SHEET E-001, NOTE 80, THE NEC AND FBC SPECIFIED FOR
 DESIGN IS NOT THE CURRENT CODE. PROVIDE CORRECTION. FBC
 PREFACE (ALSO SEE CURRENT CODES ABOVE)
 7. SHEET E-101, PROVIDE GFCI PROTECTION FOR ALL
 RECEPTACLE OUTLETS IN GARAGE. NEC 210.8(B)(8)
 8. SHEET E-101, DETAILS ARE SPECIFIED TO BE ON SHEET
 E-701WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE
 CORRECTION. WPB FBC 107.2.1
 9. SHEET E-101, DETAILS ARE SPECIFIED TO BE ON SHEET
 E-702 WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE
 CORRECTION. WPB FBC 107.2.1
 10. SHEET E-101, DETAIL 1 FOR MAIN ELECTRICAL ROOM IS
 MISSING. PROVIDE CORRECTION. WPB FBC 107.2.1
 11. SHEET E-101A, PROVIDE GFCI PROTECTED RECEPTACLE
 OUTLET FOR SERVICING OF A/C EQUIPMENT WITHIN 25 FEET OF
 THE EQUIPMENT PER CODE. NEC 210.63
 12. SHEET E-101A, PROVIDE THE REQUIRED SERVICE AREA
 RECEPTACLE PER CODE. NEC 210.64
 13. SHEET E-101B, PROVIDE GFCI PROTECTION FOR ALL
 RECEPTACLE OUTLETS IN GARAGE. NEC 210.8(B)(8)
 14. SHEET E-102B, CIRCUIT AL-17 IS SHOWN FEEDING THE
 TRATAM ROOM. WHAT IS THIS ROOM USED FOR, IS GFCI
 PROTECTION REQUIRED. PROVIDE CLARIFICATION AND/OR
 CORRECTION. NEC 210.8; WPB FBC 107.2.1
 15. SHEET E-102B, CIRCUIT AL-1, 3, 5 IS SHOWN FEEDING
 HP-2L-2, BUT THE PANEL SCHEDULE SHOWS CIRCUIT 1 AND 3
 FEEDING POOL RECEPTACLES. PROVIDE CORRECTION. WPB FBC
 107.2.1
 16. SHEET E-103, ALL RECEPTACLE OUTLETS IN CATERING
 KITCHEN AND PERFORMANCE KITCHEN REQUIRE GFCI
 PROTECTION. PROVIDE CORRECTION. NEC 210.8(B)(2)
 17. SHEET E-104, DETAIL 3 IS SPECIFIED TO BE ON SHEET
 E-701WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE
 CORRECTION. WPB FBC 107.2.1
 18. SHEET E-104, CORRIDOR RECEPTACLE OUTLETS ARE MARKED
 AS EITHER ?CC? OR ?CC1?. WHAT DOES THIS DESIGNATION
 MEAN? PROVIDE CLARIFICATION. WPB FBC 107.2.1
 19. SHEET E-106, DETAIL 5 IS SPECIFIED TO BE ON SHEET
 E-701WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE
 CORRECTION. WPB FBC 107.2.1
 20. SHEET E-106, CORRIDOR RECEPTACLE OUTLETS ARE MARKED
 AS EITHER ?CC? OR ?CC1?. WHAT DOES THIS DESIGNATION
 MEAN? PROVIDE CLARIFICATION. WPB FBC 107.2.1
 21. SHEET E-107, DETAIL 4 IS SPECIFIED TO BE ON SHEET
 E-701WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE
 CORRECTION. WPB FBC 107.2.1
 22. SHEET E-108, DETAIL 1 IS SPECIFIED TO BE ON SHEET
 E-702 WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE
 CORRECTION. WPB FBC 107.2.1
 23. SHEET E-220, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 24. SHEET E-220, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 25. SHEET E-220, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 26. SHEET E-220, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 27. SHEET E-220, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 28. SHEET E-220, PROVIDE GFCI RECEPTACLE ON EACH
 BALCONY ACCESSIBLE FROM UNIT. NEC 210.52(E)(3)
 29. SHEET E-221, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 30. SHEET E-221, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 31. SHEET E-221, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 32. SHEET E-221, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 33. SHEET E-221, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 34. SHEET E-221, A GFCI PROTECTED RECEPTACLE OUTLET ON
 A 20 AMP CIRCUIT IS REQUIRED WITHIN 3 FEET OF EACH
 BASIN. PROVIDE CORRECTION. NEC 210.11(C)(3), 210.52(D)
 35. SHEET E-222, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 36. SHEET E-222, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 37. SHEET E-222, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 38. SHEET E-222, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 39. SHEET E-222, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 40. SHEET E-223, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 41. SHEET E-223, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 42. SHEET E-223, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 43. SHEET E-223, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 44. SHEET E-224, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 45. SHEET E-223, PROVIDE GFCI RECEPTACLE ON EACH
 BALCONY ACCESSIBLE FROM UNIT. NEC 210.52(E)(3)
 46. SHEET E-224, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 47. SHEET E-224, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 48. SHEET E-224, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 49. SHEET E-224, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 50. SHEET E-224, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 51. SHEET E-225, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 52. SHEET E-225, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 53. SHEET E-225, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 54. SHEET E-225, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 55. SHEET E-225, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 56. SHEET E-225, COMPLETE PLAN FOR UNIT F IS NOT ON
 PLAN SHEET, IT APPEARS TO HAVE BEEN CUT OFF. PROVIDE
 COMPLETE FLOOR PLAN FOR UNIT F ON PLAN SHEET. WPB FBC
 107.2.1
 57. SHEET E-226, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 58. SHEET E-226, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 59. SHEET E-226, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 60. SHEET E-226, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 61. SHEET E-226, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 62. SHEET E-227, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 63. SHEET E-227, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 64. SHEET E-227, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 65. SHEET E-227, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 66. SHEET E-227, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 67. SHEET E-227, RECEPTACLE OUTLETS INSTALLED IN
 LAUNDRY AREAS SHALL HAVE GFCI PROTECTION. PROVIDE
 CORRECTION. NEC 210.8(A)(9)
 68. SHEET E-228, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 69. SHEET E-228, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 70. SHEET E-228, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 71. SHEET E-228, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 72. SHEET E-228, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 73. SHEET E-229, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 74. SHEET E-229, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 75. SHEET E-229, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 76. SHEET E-229, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 77. SHEET E-229, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 78. SHEET E-229, A GFCI PROTECTED RECEPTACLE OUTLET ON
 A 20 AMP CIRCUIT IS REQUIRED WITHIN 3 FEET OF EACH
 BASIN. PROVIDE CORRECTION. NEC 210.11(C)(3), 210.52(D)
 79. SHEET E-230, KEYNOTE 1 SPECIFIES THE 2008 NEC AS
 BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE
 80. SHEET E-230, PANEL SCHEDULE PROVIDED DOES NOT SHOW
 AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE
 CORRECTION. NEC 210.12
 81. SHEET E-230, PROVIDE GFCI PROTECTION FOR
 DISHWASHER. NEC 210.8(D)
 82. SHEET E-230, LABEL ROOMS TO FACILITATE CODE
 COMPLIANCE. WPB FBC 107.2.1
 83. SHEET E-230, PANEL IS SHOWN AS 120/240 VOLT SINGLE
 PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE
 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC
 107.2.1
 84. LIGHTING SHEETS (ALL) DO NOT SHOW THE AUTOMATIC
 CONTROL REQUIRED. PROVIDE THE ADDITIONAL AUTOMATIC
 LIGHTING CONTROLS STIPULATED IN THE FBC ENERGY CODE.
 FBC EC C405.2
 85. PROVIDE GRAPH/CALCULATION OF EXTERIOR LIGHTING
 POWER ALLOWANCES PER THE FBC ENERGY CONSERVATION IN
 RELATION TO THE CONNECTED EXTERIOR LIGHTING PROPOSED TO
 COMPLY WITH CODE. FBC EC C405.5.1
 86. SHEET E-501, NOTE 4 SPECS A 2500 KW GENERATOR.
 SHEET E-502, THE RISER DIAGRAM SHOWS A 1000 KW
 GENERATOR. PROVIDE CLARIFICATION AND CORRECTION. WPB
 FBC 107.2.1
 87. SHEET E-501, LABEL ALL FEEDERS TO SHOW WIRE AND
 CONDUIT SIZE. WPB FBC 107.2.1; NEC 310.15
 88. SHEET E-502, PLAN STATES THAT IT IS NOT FOR
 CONSTRUCTION OR PERMIT PURPOSES. REMOVE STATEMENT AND
 PROVIDE COMPLETED PERMIT SET FOR REVIEW. WPB FBC
 107.2.1
 89. SHEET E-502 IS LABELED AS THE RESIDENTIAL RISER
 DIAGRAM, WHICH IS ALSO WHAT E-501 IS LABELED. PROVIDE
 CORRECTION. WPB FBC 107.2.1
 90. SHEET E-502 STATES THAT THERE WILL BE A 125
 HORSEPOWER FIRE PUMP. SHEET E-601A STATES THAT THE FIRE
 PUMP WILL BE 200 HORSEPOWER. CORRECT DISCREPANCY.
 CORRECT LOAD CALCULATION AND WIRE SIZE AS NEEDED FOR
 FIRE PUMP FEED. NEC 695.6; WPB FBC 107.2.1
 91. SHEET E-502, LABEL ALL FEEDERS TO SHOW WIRE AND
 CONDUIT SIZE. WPB FBC 107.2.1; NEC 310.15
 92. SHEET E-502, THE SIZE OF THE MAINS IS NOT SHOWN ON
 PLAN. PROVIDE CORRECTION. WPB FBC 107.2.1
 93. PROVIDE GROUND FAULT PROTECTION FOR MAINS AS PER
 CODE. NEC 230.95
 94. PROVIDE DETAILS OF ARC FLASH MITIGATION FOR ALL
 MAINS PER CODE. NEC 240.87
 95. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR
 EACH PANEL INCLUDING INFORMATION FROM THE POWER COMPANY
 STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR
 THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE
 SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE.
 NEC 110.9, 110.10
 96. ON RISER DIAGRAM PANEL EQPH IS SHOWN AS A 100 AMP
 PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS
 SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC
 107.2.1
 97. ON RISER DIAGRAM PANEL EQEH IS SHOWN AS A 1200 AMP
 PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS
 SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC
 107.2.1
 98. ON RISER DIAGRAM PANEL EDPH IS SHOWN AS A 600 AMP
 PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS
 SHOWN AS AN 1200 AMP PANEL. PROVIDE CORRECTION. WPB FBC
 107.2.1
 99. IN REFERENCE TO COMMENTS 96, 97, AND 98, CORRECT
 THE SIZING OF TRANSFER SWITCHES 1, 2, AND 3 TO
 CORRESPOND TO THE PANELS THAT THEY FEED. WPB FBC
 107.2.1
 100. GENERATOR SHOWN ON RISER DIAGRAM APPEARS TO FEED
 SOME SORT OF PANEL AND THEN BRANCHES OUT TO THE
 TRANSFER SWITCHES. PROVIDE CLARIFICATION. PROVIDE PANEL
 SCHEDULE IS THIS IS A PANEL. WPB FBC 107.2.1; NEC
 408.4, 408.30, 408.36
 101. SHEET E-602, PANEL EM AND PANEL GMP ARE SHOWN
 FEEDING THE SAME LOADS. PROVIDE CLARIFICATION AND
 CORRECTION. WPB FBC 107.2.1
 102. AS ADJUSTMENTS ARE MADE TO DISCREPANCIES IN PLAN,
 PROVIDE UPDATED LOAD CALCULATION FOR EACH PANEL AND
 SERVICE. NEC 220
 103. SHEET E-601A, LOADS LISTED FOR LOAD CALCULATION
 SHOWN ARE MUCH DIFFERENT THAN THE LOADS SHOWN IN THE
 CORRESPONDING PANEL SCHEDULES. PROVIDE CLARIFICATION
 AND CORRECTION. WPB FBC 107.2.1; NEC 220
 104. WHERE ARE ELEVATORS FED FROM? I COULD NOT FIND
 THIS LOAD INCLUDED IN THE LOAD CALCULATION OR IN ANY
 PANEL SCHEDULES. PROVIDE CORRECTION. WPB FBC 107.2.1;
 NEC 220
 105. MANY OF THE PANEL SCHEDULES PROVIDED ARE
 INCOMPLETE. HOW CAN AN ACCURATE LOAD CALCULATION BE
 PROVIDED WITH THIS MUCH MISSING INFORMATION. PROVIDE
 CORRECTION. WPB FBC 107.2.1; NEC 220
 106. RISER DIAGRAM STATES THAT MDP1 IS ONE OF THE
 MAINS. THE PANEL SCHEDULE FOR THIS PANEL DOES NOT SHOW
 A MAIN. PROVIDE CORRECTION. WPB FBC 107.2.1; NEC 230.2
 107. LOAD FOR PANEL H SHOWN IN PANEL SCHEDULE FOR PANEL
 MDP1 IS MUCH DIFFERENT THAN THE LOAD SHOWN IN THE PANEL
 SCHEDULE FOR PANEL H. PROVIDE CORRECTION. WPB FBC
 107.2.1; NEC 220
 108. RISER DIAGRAM STATES THAT THE EMERGENCY MAINS ARE
 MAINS 2 AND 3. THE PANEL SCHEDULE FOR THESE PANELS DOES
 NOT SHOW A MAIN. PROVIDE CORRECTION. WPB FBC 107.2.1;
 NEC 230.2
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  
  

Review Stop ENG ENGINEERING CSD
Rev No 4 Status P Date 2019-09-12 Cont ID  
Sent By rrossano Date 2019-09-12 Time   Rev Time 0.00
Received By rrossano Date 2019-09-12 Time   Sent To  
Notes
2019-09-12 11:52:22UNDER FORMAL ENGINEERING REVIEW (E18020047 -1515 S
 FLAGLER DR).

Review Stop ENG ENGINEERING CSD
Rev No 3 Status F Date 2019-07-08 Cont ID  
Sent By shill Date 2019-07-08 Time 07:02 Rev Time 0.00
Received By shill Date 2019-07-08 Time 07:02 Sent To  
Notes
2019-07-08 07:02:52CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT
 APPLICATION IF REQUIRED
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE
  
 MAIN PHONE: (561) 822-1200
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2019-02-21 Cont ID  
Sent By shill Date 2019-02-21 Time 14:34 Rev Time 0.00
Received By shill Date 2019-02-21 Time 14:34 Sent To  
Notes
2019-02-21 14:34:49CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT
 APPLICATION IF REQUIRED
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE
  
 MAIN PHONE: (561) 822-1200
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2018-12-20 Cont ID  
Sent By shill Date 2018-12-20 Time 17:36 Rev Time 0.00
Received By shill Date 2018-12-20 Time 17:35 Sent To  
Notes
2018-12-20 17:36:36CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT
 APPLICATION IF REQUIRED
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE
  
 MAIN PHONE: (561) 822-1200
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 4 Status P Date 2019-08-12 Cont ID  
Sent By pleduc Date 2019-08-12 Time   Rev Time 0.00
Received By pleduc Date 2019-07-31 Time 16:15 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2019-05-30 Cont ID  
Sent By pleduc Date 2019-05-30 Time   Rev Time 0.00
Received By pleduc Date 2019-05-24 Time 14:33 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-01-16 Cont ID  
Sent By scaldero Date 2019-01-16 Time 12:06 Rev Time 0.00
Received By scaldero Date 2019-01-16 Time 10:19 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2018-10-31 Cont ID  
Sent By scaldero Date 2018-10-31 Time 12:16 Rev Time 0.00
Received By scaldero Date 2018-10-17 Time 13:45 Sent To  
Notes
2018-10-30 16:12:50PERMIT # 18081528
 REVIEW COMMENTS - FIRE DEPARTMENT
  
 FAILED COMMENTS:
  
 1) ENGINEERED FIRE ALARM AND FIRE SPRINKLER
 CONSTRUCTION DOCUMENTS ARE REQUIRED FOR A GENERAL
 BUILDING PERMIT. AFTER THE BUILDING PERMIT HAS BEEN
 ISSUED, THE SUBCONTRACTORS CAN THEN SUBMIT SHOP
 DRAWINGS (CONFORMING TO THE ENGINEERED CONSTRUCTION
 DOCUMENTS) FOR A SUB-PERMIT.
 PLEASE REVIEW THE REQUIREMENTS UNDER FSS 61-G TO ENSURE
 THAT ALL RELEVANT DETAILS FOR BOTH THE FIRE ALARM AND
 FIRE SPRINKLER DRAWINGS ARE PROVIDED.
  
 A) THERE ARE NO ENGINEERED DOCUMENTS PROVIDED FOR THE
 FIRE ALARM SYSTEM.
  
 B) IT APPEARS THAT SOME OF THE REQUIRED FIRE SPRINKLER
 DETAILS ARE MISSING. SPECIFICALLY: PER FLORIDA
 ADMINISTRATIVE CODE SECTION 61G15-32.004, FIRE
 PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY AND WATER SUPPLY
 DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA).
  
  
  
 REVIEW NOTES:
  
 2) PER NFPA 241 SECTION 8.7.2.3, WHERE UNDERGROUND
 WATER MAINS AND HYDRANTS ARE TO BE PROVIDED, THEY SHALL
 BE INSTALLED, COMPLETED, AND IN SERVICE PRIOR TO
 CONSTRUCTION WORK.
  
 3) SEPARATE PLANS AND PERMITS ARE REQUIRED FOR THE
 INSTALLATION OR MODIFICATION OF THE FIRE SPRINKLER
 SYSTEM AND/OR FIRE ALARM SYSTEM.
  
 4) SEPARATE PLANS AND PERMITS NEEDED FOR PRIVATE
 UNDERGROUND FIRE LINE AND FIRE HYDRANTS.
  
 5) EVERY ASSEMBLY OCCUPANCY ROOM NOT HAVING FIXED SEATS
 SHALL HAVE THE OCCUPANT LOAD OF THE ROOM POSTED IN A
 CONSPICUOUS PLACE NEAR THE MAIN EXIT FROM THE ROOM.
 SIGNS SHALL BE DURABLE AND INDICATE THE NUMBER OF
 OCCUPANTS PERMITTED FOR EACH ROOM.
  
  
 SUE ELLEN CALDERON
 ASSISTANT FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 4 Status P Date 2019-08-28 Cont ID  
Sent By gjohnson Date 2019-08-28 Time 16:09 Rev Time 0.00
Received By gjohnson Date 2019-08-28 Time 16:09 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status F Date 2019-06-05 Cont ID  
Sent By gjohnson Date 2019-06-05 Time 11:06 Rev Time 0.00
Received By gjohnson Date 2019-05-20 Time 08:44 Sent To  
Notes
2019-06-05 11:07:013RD REVIEW: 18081528
 2017 FLORIDA BUILDING CODE 6TH EDITION
 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH
 EDITION
  
 GAS COMMENTS: SPECIFICATIONS SHALL BE SUBMITTED BEFORE
 A GAS PERMIT WILL BE ISSUED
  
 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017
 FBC-FUEL GAS CODE SEC.304.1, 614.6
 OR 2017 FBC-RES. SEC.G 2407.1 AND G2439.4 . NEED
 CALCULATIONS FOR RANGES IN CATERING KITCHEN
 APPLICANT?S RESPONSE: CATERING KITCHEN RANGE HAS BEEN
 REMOVED FROM PROJECT. PLEASE REFER TO SHEET
 P-241. RANGE IS STILL SHOWN ON PLAN
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2019-02-13 Cont ID  
Sent By gjohnson Date 2019-02-13 Time 09:59 Rev Time 0.00
Received By gjohnson Date 2019-02-13 Time 09:59 Sent To  
Notes
2019-02-13 11:10:54 
 2ND REVIEW:
 2017 FLORIDA BUILDING CODE 6TH EDITION
 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH
 EDITION
  
 GAS COMMENTS: PREVIOUS COMMENTS
 1. COMPLIED
 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017
 FBC-FUEL GAS CODE SEC.304.1, 614.6 (CLOTHES DRYERS) OR
 2017 FBC-RES. SEC.G 2407.1 AND G2439.4 (CLOTHES
 DRYERS). NEED CALCULATIONS FOR RANGES IN CATERING
 KITCHEN
 3. SUBMIT TWO COPIES OF A DETAIL SHOWING THE TYPE OF
 VENT, LOCATION, SIZE, TERMINATION POINT, HEIGHT ABOVE
 THE ROOF AND ANCHORING DETAILS OF THE GAS VENT(S) PER
 2017 FBC-FUEL GAS SECS. 502 THRU 505 OR 2017 FBC-RES.
 SEC.G2426 THROUGH G2439.WHAT WAS SUBMITTED IS UNCLEAR
 IN HOW AND WHERE THE VENTS AND INTAKES ARE RUNNING
 PLEASE PROVIDE ELEVATION DRAWING SHOWING INTAKES AND
 EXHAUST LOCATION THE OPENINGS ALSO DRAWING SHOWING THE
 LENGTH AND SIZE AND LEVEL ABOVE GROUND FLOOR. ALL SHALL
 COMPLY WITH MANUFACTURE INSTILLATION GUIDES.
  
 4. SUBMIT TWO COPIES OF THE MANUFACTURER?S
 SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS
 EQUIPMENT AND REGULATORS TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND FBC-2017 FUEL GAS CODE
 SEC. 402.2, AND 301.3 OR 2017 FBC-RES. SEC. G2404.3.
 GAS APPLIANCES SHALL BE LISTED AND LABELED. THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC
 SEC.305.1, FBC-RES. SEC.G2408.1. SPECIFICATIONS SHALL
 BE SUBMITTED BEFORE A GAS PERMIT WILL BE ISSUED. THEY
 CAN BE DIFFERED FOR THE MASTER BUILDING PERMIT ISSUE IF
 REQUESTED.
  
 NEW COMMENTS
 1. LABEL GAS PIPING ON FLOOR PLANS. PER WPB AMEND TO
 FBC 107.2.1
 2. PROVIDE AN ENLARGE FLOOR PLAN FOR ALL BOILER AND
 PUMP ROOMS ON THE 1ST AND 23RD FLOORS
 3. SHT P-505 THE SECTION OF PIPING BETWEEN THE THE .5LB
 REGULATOR AND THE FIRST HVAC BOILER SHALL BE A MIN OF
 3" ALSO THE SECTION BETWEEN THE TWO POOL HEATERS SHALL
 BE 11/4"
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-12-06 Cont ID  
Sent By gjohnson Date 2018-12-06 Time 11:23 Rev Time 0.00
Received By gjohnson Date 2018-12-06 Time 11:23 Sent To  
Notes
2018-12-06 11:24:25 
 1ST REVIEW:
 2017 FLORIDA BUILDING CODE 6TH EDITION
 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH
 EDITION
  
 GAS COMMENTS:
 1. PLEASE PROVIDE SIZING TABLE FOR .5 LB. SYSTEM WITH
 LONGEST LENGTH FROM FURTHEST APPLIANCE. 2017 FBC-FUEL
 GAS SEC.402.4.1, 402.4.2
 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017
 FBC-FUEL GAS CODE SEC.304.1, 614.6 (CLOTHES DRYERS) OR
 2017 FBC-RES. SEC.G 2407.1 AND G2439.4 (CLOTHES
 DRYERS).
 3. SUBMIT TWO COPIES OF A DETAIL SHOWING THE TYPE OF
 VENT, LOCATION, SIZE, TERMINATION POINT, HEIGHT ABOVE
 THE ROOF AND ANCHORING DETAILS OF THE GAS VENT(S) PER
 2017 FBC-FUEL GAS SECS. 502 THRU 505 OR 2017 FBC-RES.
 SEC.G2426 THROUGH G2439.
  
 4. SUBMIT TWO COPIES OF THE MANUFACTURER?S
 SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS
 EQUIPMENT AND REGULATORS TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND FBC-2017 FUEL GAS CODE
 SEC. 402.2, AND 301.3 OR 2017 FBC-RES. SEC. G2404.3.
 GAS APPLIANCES SHALL BE LISTED AND LABELED. THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC
 SEC.305.1, FBC-RES. SEC.G2408.1.
  
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2019-09-13 Cont ID  
Sent By shill Date 2019-09-13 Time 05:43 Rev Time 0.00
Received By shill Date 2019-07-26 Time 08:46 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-07-08 Cont ID  
Sent By shill Date 2019-07-08 Time 07:02 Rev Time 0.00
Received By shill Date 2019-05-08 Time 07:45 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-03-14 Cont ID  
Sent By lmarchan Date 2019-03-14 Time 08:27 Rev Time 0.00
Received By lmarchan Date 2019-01-14 Time 07:38 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-12-20 Cont ID  
Sent By shill Date 2018-12-20 Time 17:36 Rev Time 0.00
Received By shill Date 2018-09-17 Time 17:09 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 3 Status P Date 2019-05-30 Cont ID  
Sent By shill Date 2019-05-30 Time 12:40 Rev Time 0.00
Received By shill Date 2019-05-30 Time 12:39 Sent To  
Notes
2019-05-30 12:40:40PASSED UNDER FOUNDATION PERMIT 18040645
 NO FEES DUE (PREVIOUS BUILDING WHICH WAS LARGER WAS
 DEMOLISHED)
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status F Date 2019-02-19 Cont ID  
Sent By rmcdouga Date 2019-02-19 Time 11:42 Rev Time 0.00
Received By rmcdouga Date 2019-02-19 Time 11:41 Sent To  
Notes
2019-02-19 11:43:27PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON
 APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO
 YOUR PROJECT OR EMAIL IT TO [email protected] .

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2018-11-15 Cont ID  
Sent By rmcdouga Date 2018-11-15 Time 07:12 Rev Time 0.00
Received By rmcdouga Date 2018-11-15 Time 07:12 Sent To  
Notes
2018-11-15 07:14:28PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON
 APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO
 YOUR PROJECT OR EMAIL IT TO [email protected] .

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2019-08-15 Cont ID  
Sent By pvalenti Date 2019-08-15 Time 06:22 Rev Time 0.00
Received By ccole Date 2019-08-15 Time 06:22 Sent To  
Notes
2019-08-15 06:25:33MECHANICAL REVIEW
  
 APPROVED PER CHRIS COLE (REMOTELY)
  
 NOTE: OK TO ISSUE; PLEASE NOTIFY [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2019-06-18 Cont ID  
Sent By ccole Date 2019-06-18 Time 11:45 Rev Time 0.00
Received By ccole Date 2019-06-11 Time 07:18 Sent To  
Notes
2019-06-18 11:47:323RD REVIEW FBC-2017 MECHANICAL
 PERMIT #18081528
 1515 S FLAGLER DR.
 6/19/19
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
 BASED ON THE REVISED PLANS AND COMMENT RESPONSES FROM
 MANAGED LAND ENTITLEMENTS, PLEASE ADDRESS THESE
 REMAINING ISSUES.
  
 1) PARKING GARAGES- SHEETS M100, M101A, M101B, M503:
 A) THE SEQUENCE OF OPERATION FOR THE GARAGE EXHAUST
 SYSTEM SHALL INDICATE THAT AUTOMATIC OPERATION OF THE
 SYSTEM SHALL NOT REDUCE THE VENTILATION AIRFLOW RATE
 BELOW 0.05 CFM PER SQUARE FOOT OF THE FLOOR AREA. THE
 CURRENT NOTES INDICATE THE FANS WILL OPERATE ONLY BY
 ACTUATION OF THE SENSORS. CONTINUOUS OPERATION AT THE
 MINIMUM RATE IS REQUIRED. THE EXHAUST SYSTEMS SHALL
 ALSO BE IN COMPLIANCE WITH SECTION C403.2.6.2 FBC EC
 WHICH IS COPIED BELOW:
 C403.2.6.2 ENCLOSED PARKING GARAGE VENTILATION
 CONTROLS. ENCLOSED PARKING GARAGES USED FOR STORING OR
 HANDLING AUTOMOBILES OPERATING UNDER THEIR OWN POWER
 SHALL EMPLOY CONTAMINATION-SENSING DEVICES AND
 AUTOMATIC CONTROLS CONFIGURED TO STAGE FANS OR MODULATE
 FAN AVERAGE AIRFLOW RATES TO 50 PERCENT OR LESS OF
 DESIGN CAPACITY, OR INTERMITTENTLY OPERATE FANS LESS
 THAN 20 PERCENT OF THE OCCUPIED TIME OR AS REQUIRED TO
 MAINTAIN ACCEPTABLE CONTAMINANT LEVELS IN ACCORDANCE
 WITH FLORIDA BUILDING CODE, MECHANICAL PROVISIONS.
 FAILURE OF CONTAMINATION SENSING DEVICES SHALL CAUSE
 THE EXHAUST FANS TO OPERATE CONTINUOUSLY AT DESIGN
 AIRFLOW.
 B) INDICATE HOW THE CIRCULATION FANS WILL BE PROTECTED
 FROM DAMAGE- PROVIDE DETAILS- OR RAISE THE FANS TO THE
 MINIMUM REQUIRED HEIGHT OF 8?0? FROM F.F. TO BOTTOM OF
 FAN- SECTION 304.6 FBC M.
 C) COMMENT #13 FROM THE SECOND REVIEW STILL EXISTS.
 IMPACT PROTECTION FOR THE GARAGE EXHAUST FANS SHOWN ON
 M101B & M706 NOT PROVIDED.
  
 2) GENERATOR- SHEETS M101A, P242, & P708:
 A) AS PREVIOUSLY REQUESTED SHOW THE CLEARANCE DISTANCE
 MEASUREMENTS FROM THE GENERATOR RADIATOR EXHAUST AND
 ENGINE EXHAUST OUTLET TO THE ROOM AIR INTAKE LOUVER,
 AND ANY OTHER OPENINGS OR AIR INTAKES INTO THE
 BUILDING.
 B) PROVIDE THE DETAILS AND SPECIFICATIONS FOR THE FUEL
 TANK AND FUEL PIPING THAT ARE INDICATED ON SHEETS P242
 AND P708 ON THE MECHANICAL PLANS, OR NOTE THESE PLAN
 SHEETS ON M101A TO HELP EXPEDITE THE CONSTRUCTION AND
 INSPECTION PROCESS. (THE GENERATOR AND THE FUEL SYSTEM
 ARE MECHANICAL INSPECTIONS).
  
 3) POOL EQUIPMENT ROOM- SHEETS M101A, M603:
 A) PROVIDE A SEQUENCE OF OPERATION FOR THE EXHAUST
 SYSTEM. WILL PEEF-2 RUN CONTINUOUSLY? WILL ANY POOL
 TREATMENT CHEMICALS BE STORED IN THE ROOM? PLEASE
 REVIEW SECTIONS 510.1, 510.2, 510.7.1, AND 510.7.3 FBC
 M AND INDICATE COMPLIANCE.
 B) THE EXHAUST FAN SCHEDULE DOES NOT PROVIDE ANY
 INFORMATION ABOUT THE FANS IN THE ?REMARKS? COLUMN THAT
 WOULD INDICATE THE FANS HAVE BEEN TESTED AND RATED FOR
 GAS BOILER EXHAUST SYSTEMS- SECTION 305.1 FBC FG.
 C) PROVIDE A UL TESTED AND APPROVED FIRESTOPPING
 ASSEMBLY FOR THE BOILER VENT FLUE PENETRATIONS THROUGH
 THE FIRE RATED WALL- SECTION 714 FBC B.
 D) SHEET 101A INDICATES AN EXHAUST LOUVER TERMINATION
 FOR THE POOL VENT FLUES- M706 INDICATES A LOCHINVAR
 TERMINATION KIT FOR AIR INTAKE AND EXHAUST FLUE.
  
 4) KITCHEN: THE COMMENT RESPONSE NARRATIVE INDICATES AN
 EQUIPMENT SCHEDULE ON SHEET G10 WHICH HAS NOT BEEN
 PROVIDED- SECTION 107.2.1 WPB.
  
 5) SHEET M102B: THE REQUESTED VENTILATION FOR THE TRASH
 ROOM NOT PROVIDED- SECTION 502.1 FBC M.
  
 6) SHEETS M106, M107, & M108: AS PREVIOUSLY REQUESTED
 INDICATE HOW THE TRASHROOMS AND CORRIDORS BY THE
 STAIRWAYS WILL BE VENTILATED-
  
 7) SHEETS M103, M502: THE SMOKE ANALYSIS DOES NOT
 SPECIFICALLY CALL OUT SMOKE DETECTORS IN THE STAIRWAY
 PRESSURIZATION DUCTS ON PAGE 28 OF THE ANALYSIS. SMOKE
 DETECTORS ARE REQUIRED IN THE ELEVATOR HOISTWAY
 PRESSURIZATION FAN SYSTEMS- SECTION 909.21.4.2 FBC B,
 HOWEVER THERE IS NO CORRELATING REQUIREMENT IN THE CODE
 FOR PRESSURIZED STAIRWAYS, EXCEPT THE REQUIREMENT UNDER
 SECTION 606.2.1. AS PREVIOUSLY REQUESTED PROVIDE A
 SEQUENCE OF OPERATION AND CLARIFY HOW WILL THESE
 DETECTORS WILL INTERACT WITH THE SMOKE CONTROL
 SEQUENCING PROCEDURES IN THE EVENT OF AN EMERGENCY
 ALARM.
  
  
 THE FOLLOWING INFORMATION COPIED FOR REFERENCE:
  
 1) COMMISSIONING OF THE MECHANICAL SYSTEMS, SERVICE
 WATER HEATING SYSTEMS, AND ELECTRICAL POWER AND
 LIGHTING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC-17
 ENERGY CONSERVATION.
 PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW.
  
 C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING
 SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS.
 PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS,
 THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER,
 MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE
 EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND
 COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS
 SECTION.
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER OR OWNER'S AUTHORIZED AGENT AND MADE
 AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN
 ACCORDANCE WITH SECTIONS
 C408.2.4 AND C408.2.5.
  
 C408.2.1. COMMISSIONING PLAN.
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED
 DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL
 ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE
 FOLLOWING ITEMS:
  
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED
 TO, CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN
 CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE'
  
 2) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS
 REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN
 THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES
 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE
 TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A
 REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN
 FIRE PROTECTION ENGINEERING AND/OR MECHANICAL
 ENGINEERING.
 PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM,
 DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED
 TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR
 AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED
 TO BE REVIEWED BY THE WPB BUILDING AND FIRE
 DEPARTMENTS.
 PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE
 PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED
 BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT
 SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE
 DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED
 IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER)
 IN THE BUILDING.
  
 3) SEPARATE PERMITS ARE REQUIRED FOR KITCHEN EXHAUST
 HOODS AND FIRE SUPPRESSION SYSTEMS, WALK-IN COOLERS AND
 FREEZERS.
  
 4) REQUIRED SUBMITTALS:
  
 A) COMMISSION PLAN AND FINAL REPORT.
 B) SMOKE CONTROL TESTING AND FINAL REPORTS.
 C) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS.
 D) MOTORIZED AND BAROMETRIC DAMPERS
 E) DUCT SMOKE DETECTORS
 F) EXHAUST AND OUTSIDE AIR LOUVERS INCLUDING
 MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS
 AND/OR MIAMI-DADE NOA'S
 G) C02 AND N02 SENSORS
 H) COOLING TOWERS
 I) GENERATOR
 J) ACCESS PANELS
 K) DUCT FIRE WRAPPING
 L) FIRESTOPPING AND FIRE CAULKING
 M) CONDENSER WATER PIPING AND PIPE INSULATION.
 N) BOILERS AND WATER HEATERS, PIPING AND INSULATION
 O) WIND LOAD ENGINEERING FOR THE COOLING TOWER, ROOFTOP
 FANS AND CURBS, CONDENSERS AND STANDS, INCLUDING FL.
 PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE
 STANDS.
 P) FLAMEBAR DUCTWORK AND INSTALLATION DETAILS.
 PLEASE NOTE : ALL SUBMITTALS AND SHOP DRAWINGS SHALL
 BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN
 PROFESSIONAL OF RECORD.
  
 DEFERRED SUBMITTAL: 107.3.4.1 WPB DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT
 ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED
 BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2019-02-13 Cont ID  
Sent By ccole Date 2019-02-13 Time 12:54 Rev Time 0.00
Received By ccole Date 2019-02-06 Time 10:29 Sent To  
Notes
2019-02-13 12:56:202ND REVIEW FBC-2017 MECHANICAL
 PERMIT #18081528
 1515 S FLAGLER DR.
 2/12/19
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE REVISED ENERGYGAUGE COMPLIANCE FORM IS STILL
 MISSING COMPLIANCE DATA FOR THE VERTICAL HEAT PUMPS
 WITH THE EXCEPTION OF HP-3L-2.
  
 2) SHEET M001: THE REVISED VENTILATION CALCULATIONS ARE
 NOT IN COMPLIANCE WITH TABLE 403.3.1.1. FBC M, OR
 ASHRAE 62.1- 2013.
 A) LOBBY AND RECEPTION ROOMS AND AREAS ARE CALCULATED
 AT 30 PERSONS PER 1000 SF.
 B) MEETING & MULTI-PURPOSE- 120 PERSONS PER 1000 SF.
 C) FITNESS- 40 PERSONS PER 1000 SF.
 D) LOUNGE- 150 PERSONS PER 1000 SF.
 PLEASE REFER TO SECTION 403.3.1.1 OUTDOOR AIRFLOW RATE
 FBC M:
 VENTILATION SYSTEMS SHALL BE DESIGNED TO HAVE THE
 CAPACITY TO SUPPLY THE MINIMUM OUTDOOR AIRFLOW RATE,
 DETERMINED IN ACCORDANCE WITH THIS SECTION. IN EACH
 OCCUPIABLE SPACE, THE VENTILATION SYSTEM SHALL BE
 DESIGNED TO DELIVER THE REQUIRED RATE OF OUTDOOR
 AIRFLOW TO THE BREATHING ZONE. THE OCCUPANT LOAD
 UTILIZED FOR DESIGN OF THE VENTILATION SYSTEM SHALL BE
 NOT LESS THAN THE NUMBER DETERMINED FROM THE ESTIMATED
 MAXIMUM OCCUPANT LOAD RATE INDICATED IN TABLE
 403.3.1.1. VENTILATION RATES FOR OCCUPANCIES NOT
 REPRESENTED IN TABLE 403.3.1.1 SHALL BE THOSE FOR A
 LISTED OCCUPANCY CLASSIFICATION THAT IS MOST SIMILAR IN
 TERMS OF OCCUPANT DENSITY, ACTIVITIES AND BUILDING
 CONSTRUCTION; OR SHALL BE DETERMINED BY AN APPROVED
 ENGINEERING ANALYSIS. THE VENTILATION SYSTEM SHALL BE
 DESIGNED TO SUPPLY THE REQUIRED RATE OF VENTILATION AIR
 CONTINUOUSLY DURING THE PERIOD THE BUILDING IS
 OCCUPIED, EXCEPT AS OTHERWISE STATED IN OTHER
 PROVISIONS OF THE CODE.
 WITH THE EXCEPTION OF SMOKING LOUNGES, THE VENTILATION
 RATES IN TABLE 403.3.1.1 ARE BASED ON THE ABSENCE OF
 SMOKING IN OCCUPIABLE SPACES. WHERE SMOKING IS
 ANTICIPATED IN A SPACE OTHER THAN A SMOKING LOUNGE, THE
 VENTILATION SYSTEM SERVING THE SPACE SHALL BE DESIGNED
 TO PROVIDE VENTILATION OVER AND ABOVE THAT REQUIRED BY
 TABLE 403.3.1.1 IN ACCORDANCE WITH ACCEPTED ENGINEERING
 PRACTICE.
 EXCEPTION: THE OCCUPANT LOAD IS NOT REQUIRED TO BE
 DETERMINED BASED ON THE ESTIMATED MAXIMUM OCCUPANT LOAD
 RATE INDICATED IN TABLE 403.3.1.1 WHERE APPROVED
 STATISTICAL DATA DOCUMENT THE ACCURACY OF AN ALTERNATE
 ANTICIPATED OCCUPANT DENSITY.
  
 4) SHEET M100, M101A & M101B: COMMENT #10 FROM THE 1ST
 REVIEW CONCERNING MECHANICAL EQUIPMENT INSTALLED BELOW
 FLOOD ELEVATION WILL STAND UNTIL EVIDENCE OF COMPLIANCE
 IS PROVIDED BY SUBMITTAL OF THE ELEVATION CERTIFICATE.
  
 5) M100, M101A & B: COMMENT #13B FROM THE 1ST REVIEW IS
 STILL NOT RESOLVED. REQUIRED EXHAUST VENTILATION FOR
 BASEMENT AND GROUND FLOOR GARAGES- (32407 + 41182 =
 73589 CFMS). TOTAL EXHAUST CAPACITY OF EXHAUST FANS-
 (70,800 CFMS). PLEASE NOTE THAT SHEET M101B INDICATES
 THE REQUIRED EXHAUST VENTILATION FOR THE BASEMENT
 GARAGE TO BE (36258 CFMS), AS OPPOSED TO (32407 CFMS)
 SHOWN ON SHEET M100.
  
 6) M100, M101A & B: AS NOTED IN 1ST REVIEW COMMENT
 #13C, THE LOCATIONS OF THE EXHAUST INLETS FOR THE
 GARAGE EXHAUST DO NOT APPEAR TO BE IN THE AREAS OF THE
 HEAVIEST CONCENTRATIONS OF CONTAMINANTS BECAUSE THEY
 ARE LOCATED ONLY ON THE EAST SIDE OF THE GARAGES. IT IS
 ACKNOWLEDGED THAT THE NEW CIRCULATION FANS MAY HELP TO
 MOVE THE CONTAMINATED AIR FROM THE WEST END TO THE
 EAST, HOWEVER THIS WILL HAVE TO BE CONFIRMED BY FIELD
 TESTING WHICH WILL BE REQUIRED FOR FINAL APPROVAL.
  
 7) M100: PLEASE CLARIFY THE RESPONSE TO COMMENT #13F
 CONCERNING THE FD'S IN THE AIR SHAFT. THE NARRATIVE
 STATES THERE IS "NO SEQUENCE OF OPERATIONS". PLEASE
 EXPLAIN WHAT WILL CAUSE THE DAMPERS TO CLOSE- FUSIBLE
 LINK?
  
 8) M100 & M101A: THE LOCATION OF THE BASEMENT AIR SHAFT
 OPENING DOES NOT APPEAR TO HAVE A MINIMUM 10' CLEARANCE
 FOR THE GARAGE DRIVEWAY AREA- SEE SECTION 401.4 (2) FBC
 M.
  
 9) M100, M101A & B: THE GARAGE CIRCULATION FANS SHALL
 BE INSTALLED A MINIMUM OF 8' ABOVE THE FINISHED FLOOR
 OF THE GARAGE. THE NOTE ON THE PLAN INDICATES 7'0"
 HIGH.
  
 10) M101A: ADDITIONAL INFORMATION AND SPECIFICATIONS
 FOR THE GENERATOR ARE REQUIRED.
 A) SEE TABLE 4.1(A) AND 4.2 NFPA 110-2013 AND INDICATE
 THE"CLASSIFICATION" OF THE EMERGENCY GENERATOR (EPSS).
 B) SEE TABLE 4.1(B) AND SECTION 4.3 AND INDICATE THE
 "TYPE" OF EPSS.
 C) SEE SECTION 4.4 AND INDICATE WHICH "LEVEL" EPSS
 SYSTEM IS TO BE INSTALLED- LEVEL 1 OR LEVEL 2.
 D) VERIFY COMPLIANCE WITH SECTION 7.7.1 WHICH REQUIRES
 THE VENTILATION AIRFLOW FOR THE EPS ROOM TO BE CAPABLE
 OF LIMITING THE MAXIMUM AIR TEMPERATURE AIR TEMPERATURE
 IN THE ROOM PER MANUFACTURER'S RECOMMENDATIONS.
 E) INDICATE THE EPSS STANDBY LOADS AND EMERGENCY LOADS
 AS OUTLINED IN SECTIONS 403.4.8.3 AND 403.4.8.4 FBC B.
 F) INDICATE WHICH STANDARD WAS USED TO CALCULATE THE
 AIR CHANGES IN THE EPSS ROOM.
 G) VERIFY THERE WILL BE A MINIMUM 10' CLEARANCE
 PROVIDED FROM THE RADIATOR DISCHARGE TO THE AIR INTAKE
 LOUVER.
 H) VERIFY MINIMUM 10' CLEARANCE FROM THE ENGINE EXHAUST
 PIPE TERMINATION TO ANY AIR INTAKES INTO THE BUILDING.
 I) FUEL OIL TANK: SHOW THE TYPE AND SIZE OF TANK VENT
 PIPE, SHOW THE PIPE RUN AND TERMINATION LOCATION.
 J) FUEL OIL FILL PIPING: SHOW THE TYPE AND SIZE OF FILL
 PIPING, EXTERIOR FILL PIPE LOCATION, AND PIPING RUN TO
 THE TANK.
  
 11) M101A, POOL EQUIPMENT ROOM:
 A) PROVIDE EQUIPMENT SCHEDULES FOR THE POOL BOILERS.
 THE BOILERS ARE ASSUMED TO BE GAS-FIRED BASED ON THE 6"
 FLUES. AS PREVIOUSLY NOTED A VESTIBULE IS REQUIRED
 BETWEEN THE EQUIPMENT ROOM AND THE GARAGE.
 305.3.2 PARKING GARAGES. CONNECTION OF A PARKING GARAGE
 WITH ANY ROOM IN WHICH THERE IS A FUEL-FIRED APPLIANCE
 SHALL BE BY MEANS OF A VESTIBULE PROVIDING A
 TWO-DOORWAY SEPARATION, EXCEPT THAT A SINGLE DOOR IS
 PERMITTED WHERE THE SOURCES OF IGNITION IN THE
 APPLIANCE ARE ELEVATED IN ACCORDANCE WITH SECTION
 305.3. EXCEPTION: THIS SECTION SHALL NOT APPLY TO
 APPLIANCE INSTALLATIONS COMPLYING WITH SECTION 305.4.
 B) IT APPEARS THAT COMBUSTION AIR FOR THE BOILERS IS
 BEING TAKEN FROM THE ENCLOSED GARAGE WHICH IS
 PROHIBITED- SECTION 304.9 FBC FG AND TABLE 403.3.1.1
 FBC M.
 C) THERE APPEARS TO BE A LOUVERED OPENING IN THE EAST
 SIDE OF THE EQUIPMENT ROOM WHICH WOULD REQUIRE A FIRE
 DAMPER, HOWEVER THIS OPENING IS NOT PERMITTED TO
 PROVIDE MAKEUP AIR FROM THE ENCLOSED GARAGE FOR PEEF-2,
 OR COMBUSTION AIR FOR THE BOILERS BECAUSE EACH MUST BE
 TAKEN FROM THE OUTDOORS AS PREVIOUSLY NOTED ABOVE.
 D) PLEASE INDICATE WHICH STANDARD OR METHOD WAS USED
 FOR THE POOL EQUIPMENT ROOM EXHAUST VENTILATION
 CALCULATION.
 E) INDICATE THE TYPE OF VENT FLUE PIPING AND EXHAUST
 DUCT TO BE INSTALLED.
 F) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE POOL
 HEATERS AND FLUE PIPING. (MAY BE DEFERRED SUBMITTALS
  
 12) M101A, M101B B, M-708: COMMENTS #19A, 22, 23 & 24
 FROM THE 1ST REVIEW ARE STILL NOT RESOLVED. FIRE
 DAMPERS ARE NOT SHOWN FOR THE EF-IL-4 & 5 EXHAUST DUCTS
 PENETRATING THE 2HR FIRE-RATED EXTERIOR WALLS OF THE
 WATER PUMP ROOM. PROVIDE EXHAUST VENTILATION
 CALCULATIONS AND THE SEQUENCES OF OPERATIONS FOR
 EF-1L-2, 3, 4 & 5.
  
 13) M-101B, & M-706: IMPACT PROTECTION FOR THE GARAGE
 EXHAUST FANS NOT PROVIDED- 9N-3 FAC.
  
 14) M102A: IT IS NOT CLEAR WHERE THE POOL EXHAUST DUCT
 AND BOILER VENT FLUES ARE TERMINATING. PLEASE PROVIDE
 NOTES AND DETAILS TO CLARIFY. A) INDICATE HOW THE DUCT
 AND FLUE WILL BE SUPPORTED AND ANCHORED TO RESIST WIND
 PRESSURES- SECTION 301.15 FBC M.
  
 15) M102A: COMMENT #26 FROM THE 1ST REVIEW NOT
 RESOLVED- IDENTIFY THE ROOM TO THE WEST OF CHNG RM
 1134.
  
 16) M102A, M102B: COMMENT #27 FROM THE 1ST REVIEW NOT
 RESOLVED- VENTILATION FOR THE TRASH ROOM NOT PROVIDED.
  
 17) M102B: THE NARRATIVE RESPONSE TO COMMENT #30
 INDICATES A NEW UPDATED PLAN SHEET WAS UPLOADED,
 HOWEVER THIS SHEET WAS NOT PROVIDED.
  
 18) M103: COMMENT #33 FROM THE 1ST REVIEW NOT RESOLVED.
 THE NARRATIVE STATES ALL "TO BE PROVIDED BY THE
 ARCHITECT", HOWEVER, I AM NOT SEEING ANY ARCHITECTURAL
 PLANS FOR THE KITCHEN, EQUIPMENT SCHEDULE, OR THE
 REQUESTED AIR BALANCE CALCULATION.
  
 19) M103: COMMENTS #33 & 34 WILL STAND UNTIL FURTHER
 INFORMATION ABOUT THE KITCHEN IS PROVIDED.
  
 20) M104, 106, 107, & 108: COMMENTS #36 & 37 FROM THE
 1ST REVIEW STILL NOT RESOLVED- THE PLAN SHEETS HAVE NOT
 BEEN UPDATED.
  
 21) M104: COMMENT #38 NOT RESOLVED. FD'S MISSING FOR
 O/A DUCTS PENETRATING FIRE-RATED CORRIDOR WALLS AT
 FOYER 643 AND ELECT RM 403.
  
 22) M107 & M701: COMMENT #39 FROM THE 1ST REVIEW NOT
 RESOLVED. PLEASE PROVIDE AN ENLARGED PLAN FOR THE
 BOILER ROOM SHOWING THE LOCATIONS OF ALL EQUIPMENT AND
 WORKING CLEARANCES. INCLUDE AN EQUIPMENT SCHEDULE AND
 SUBMIT SPECS FOR ALL EQUIPMENT. A) PROVIDE VENTILATION
 FOR THE ROOM.
  
 23) M707 & M103: COMMENT #40 FROM THE 1ST REVIEW NOT
 RESOLVED. PROVIDE DETAILS SHOWING HOW THE
 PRESSURIZATION DUCTS WILL CONNECT INTO THE INTERIOR
 EXIT STAIRWAYS AND HOISTWAYS. WILL FSD'S BE INSTALLED
 AT THESE LOCATIONS? WILL FLAMEBAR BE USED OR DUCTS
 ENCLOSED WITH 2HR FIRE-RATED DUCTWRAP?
  
 24) M103: THE SMOKE DETECTORS SHOWN IN THE
 PRESSURIZATION DUCTS ARE NOT INCLUDED IN THE SLS SMOKE
 CONTROL REPORT. PLEASE CONSULT WITH THE SMOKE CONTROL
 ENGINEER AND HAVE THE REPORT REVISED, AND PROVIDE NOTES
 ON THE PLAN TO CLARIFY THEIR SEQUENCE OF OPERATION.
  
 25) M109: COMMENT #41 FROM THE 1ST REVIEW NOT RESOLVED.
 DS DETECTORS REQUIRED IN THE SUPPLY SYSTEMS OF THE
 5-TON HP'S.
  
 26) M110: COMMENT #42- IT IS ACKNOWLEDGED THAT WIND
 LOAD ENGINEERING WILL BE DEFERRED.
  
 27) M110: THE SMOKE DETECTORS SHOWN IN THE
 PRESSURIZATION DUCTS ARE NOT INCLUDED IN THE SLS SMOKE
 CONTROL REPORT. PLEASE CONSULT WITH THE SMOKE CONTROL
 ENGINEER AND HAVE THE REPORT REVISED, AND PROVIDE NOTES
 ON THE PLAN TO CLARIFY THEIR SEQUENCE OF OPERATION.
 PLEASE NOTE ACCORDING TO THE REPORT, SMOKE DETECTORS
 ARE REQUIRED AT THE TOP OF THE HOISTWAY ENCLOSURES.
  
 28) M220-229 A: COMMENT #44 NOTE RESOLVED. A) EVIDENCE
 OF UL LISTING AND LABELING FOR THE MIELE ELECTRIC
 COOKING APPLIANCES AND RANGE HOOD NOT PROVIDED- SECTION
 917.1 AND 505.1 EXCEPTION 1 FBC M. B) EVIDENCE OF ANSI
 TESTING APPROVAL FOR THE GAS-FIRED COOKING APPLIANCES
 NOT PROVIDED- SECTION 623.1 FBC FG. C) EVIDENCE OF UL
 LISTING AND LABELING FOR THE VENTLESS DRYERS NOT
 PROVIDED, AND INSTALLATION INSTRUCTIONS ARE REQUIRED-
 SECTION 504.21 EXCEPTION FBC M. PLEASE CLARIFY WHY
 SPECS FOR VENTLESS DRYERS HAVE BE SUBMITTED BUT THE
 PLANS SHOW DYER EXHAUST DUCT RUNS
  
 29) M222: COMMENT #45B NOT RESOLVED. PROVIDE RETURN AIR
 FROM BEDROOM #2.
  
 30) M224: COMMENT #45D NOT RESOLVED. THE TRANSFER
 GRILLS ARE STILL UNDERSIZED- SEE SECTION 601.6
 EXCEPTIONS 2 & 3. PLEASE NOTE THE KITCHEN EXHAUST FAN
 IS MISSING- SEE TABLE 403.3.1.1 FBC M.
  
 31) M227: COMMENT #45G NOT RESOLVED. THE MASTER BEDROOM
 TRANSFER GRILL IS UNDERSIZED- SEE SECTION 601.6
 EXCEPTIONS 2 & 3.
  
 32) M229: COMMENT 45H-3, 4, & 5 NOT RESOLVED- PLEASE
 COMPLY. 3) PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY
 SYSTEM OF HP-H. 4) LABEL ALL THE HP'S IN THE SPACE. 5)
 BEDROOM #2 & 3 TRANSFER DUCTS ARE UNDERSIZED.
  
 33) M502: COMMENTS #55 & 56 PRINTED BELOW NOT RESOLVED-
 THE UPDATED PLANS WAS NOT SUBMITTED.
  
 54) M502: THE DUCTWORK CONNECTING THE PRESSURIZATION
 FANS TO THE SHAFTS SHALL BE FIRE-RATED PER SECTION-
 909.21.3 FBC B.
  
 55) M502: THE HOISTWAY SHAFT VENTS SHALL BE PROVIDED
 WITH CLASS I MOTORIZED DAMPERS WITH A MAXIMUM LEAKAGE
 RATE OF 4 CFM/FT2 AT 1.0 INCH WATER GAUGE (W.G.) (249
 PA) WHEN TESTED IN ACCORDANCE WITH AMCA 500D- SECTION
 C403.2.4.3 FBC M.
  
 COMMENTS LISTED BELOW FROM THE 1ST REVIEW ARE COPIED
 FOR REFERENCE.
 PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL
 CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE
 PROJECT WILL BE REQUIRED TO ATTEND A MEETING AT THE WPB
 BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL
 INSPECTOR , PLANS EXAMINER, AND OTHERS- TO DISCUSS
 TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE
 DEFERRED SUBMITTAL PROCESS.
  
 1) COMMISSIONING OF THE MECHANICAL SYSTEMS, SERVICE
 WATER HEATING SYSTEMS, AND ELECTRICAL POWER AND
 LIGHTING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC-17
 ENERGY CONSERVATION.
 PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW.
 C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING
 SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS.
 PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS,
 THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER,
 MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE
 EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND
 COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS
 SECTION.
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER OR OWNER'S AUTHORIZED AGENT AND MADE
 AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN
 ACCORDANCE WITH SECTIONS
 C408.2.4 AND C408.2.5.
  
 C408.2.1. COMMISSIONING PLAN.
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED
 DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL
 ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE
 FOLLOWING ITEMS:
  
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED
 TO, CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN
 CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE'
  
 2) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS
 REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN
 THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES
 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE
 TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A
 REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN
 FIRE PROTECTION ENGINEERING AND/OR MECHANICAL
 ENGINEERING.
 PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM,
 DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED
 TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR
 AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED
 TO BE REVIEWED BY THE WPB BUILDING AND FIRE
 DEPARTMENTS.
 PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE
 PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED
 BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT
 SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE
 DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED
 IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER)
 IN THE BUILDING.
  
 3) SEPARATE PERMITS ARE REQUIRED FOR KITCHEN EXHAUST
 HOODS AND FIRE SUPPRESSION SYSTEMS, WALK-IN COOLERS AND
 FREEZERS.
  
 4) REQUIRED SUBMITTALS:
  
 A) COMMISSION PLAN AND FINAL REPORT.
 B) SMOKE CONTROL TESTING AND FINAL REPORTS.
 C) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS.
 D) MOTORIZED AND BAROMETRIC DAMPERS
 E) DUCT SMOKE DETECTORS
 F) EXHAUST AND OUTSIDE AIR LOUVERS INCLUDING
 MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS
 AND/OR MIAMI-DADE NOA'S
 G) C02 AND N02 SENSORS
 H) COOLING TOWERS
 I) GENERATOR
 J) ACCESS PANELS
 K) DUCT FIRE WRAPPING
 L) FIRESTOPPING AND FIRE CAULKING
 M) CONDENSER WATER PIPING AND PIPE INSULATION.
 N) BOILERS AND WATER HEATERS, PIPING AND INSULATION
 O) WIND LOAD ENGINEERING FOR THE COOLING TOWER, ROOFTOP
 FANS AND CURBS, CONDENSERS AND STANDS, INCLUDING FL.
 PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE
 STANDS.
 P) FLAMEBAR DUCTWORK AND INSTALLATION DETAILS.
 PLEASE NOTE : ALL SUBMITTALS AND SHOP DRAWINGS SHALL
 BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN
 PROFESSIONAL OF RECORD.
  
 DEFERRED SUBMITTAL: 107.3.4.1 WPB DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT
 ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED
 BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  
  
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-11-01 Cont ID  
Sent By ccole Date 2018-11-01 Time 10:27 Rev Time 0.00
Received By ccole Date 2018-10-31 Time 10:27 Sent To  
Notes
2018-11-01 10:47:34 
 1ST REVIEW FBC-2017 MECHANICAL
 PERMIT #18081528
 1515 S FLAGLER DR.
 10/31/18
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES
 THAT ARE LISTED BELOW.
 COMMENTS #1-4 ADDRESS APPROVED SUBMITTALS THAT WILL BE
 REQUIRED IN ORDER TO RECEIVE A FINAL MECHANICAL
 INSPECTION APPROVAL AND CO FOR THE PROJECT.
 PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL
 CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE
 PROJECT WILL BE REQUIRED TO ATTEND A MEETING AT THE WPB
 BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL
 INSPECTOR , PLANS EXAMINER, AND OTHERS- TO DISCUSS
 TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE
 DEFERRED SUBMITTAL PROCESS.
  
 1) COMMISSIONING OF THE MECHANICAL SYSTEMS, SERVICE
 WATER HEATING SYSTEMS, AND ELECTRICAL POWER AND
 LIGHTING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC-17
 ENERGY CONSERVATION.
 PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW.
  
 C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING
 SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS.
 PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS,
 THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER,
 MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE
 EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND
 COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS
 SECTION.
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER OR OWNER'S AUTHORIZED AGENT AND MADE
 AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN
 ACCORDANCE WITH SECTIONS
 C408.2.4 AND C408.2.5.
  
 C408.2.1. COMMISSIONING PLAN.
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED
 DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL
 ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE
 FOLLOWING ITEMS:
  
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED
 TO, CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN
 CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE'
  
 2) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS
 REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN
 THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES
 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE
 TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A
 REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN
 FIRE PROTECTION ENGINEERING AND/OR MECHANICAL
 ENGINEERING.
 PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM,
 DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED
 TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR
 AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED
 TO BE REVIEWED BY THE WPB BUILDING AND FIRE
 DEPARTMENTS.
 PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE
 PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED
 BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT
 SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE
 DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED
 IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER)
 IN THE BUILDING.
  
 3) SEPARATE PERMITS ARE REQUIRED FOR KITCHEN EXHAUST
 HOODS AND FIRE SUPPRESSION SYSTEMS, WALK-IN COOLERS AND
 FREEZERS.
  
 4) REQUIRED SUBMITTALS:
  
 A) COMMISSION PLAN AND FINAL REPORT.
 B) SMOKE CONTROL TESTING AND FINAL REPORTS.
 C) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS.
 D) MOTORIZED AND BAROMETRIC DAMPERS
 E) DUCT SMOKE DETECTORS
 F) EXHAUST AND OUTSIDE AIR LOUVERS INCLUDING
 MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS
 AND/OR MIAMI-DADE NOA'S
 G) C02 AND N02 SENSORS
 H) COOLING TOWERS
 I) GENERATOR
 J) ACCESS PANELS
 K) DUCT FIRE WRAPPING
 L) FIRESTOPPING AND FIRE CAULKING
 M) CONDENSER WATER PIPING AND PIPE INSULATION.
 N) BOILERS AND WATER HEATERS, PIPING AND INSULATION
 O) WIND LOAD ENGINEERING FOR THE COOLING TOWER, ROOFTOP
 FANS AND CURBS, CONDENSERS AND STANDS, INCLUDING FL.
 PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE
 STANDS.
 P) FLAMEBAR DUCTWORK AND INSTALLATION DETAILS.
 PLEASE NOTE : ALL SUBMITTALS AND SHOP DRAWINGS SHALL
 BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN
 PROFESSIONAL OF RECORD.
  
 DEFERRED SUBMITTAL: 107.3.4.1 WPB DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT
 ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED
 BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  
 5) ENERGYGAUGE COMPLIANCE FORM SUBMITTAL: PLEASE REVIEW
 THE FORM AND COMPARE WITH THE AC SCHEDULES ON SHEETS
 M601 & M602. IN ADDITION TO THE SYSTEMS'
 IDENTIFICATIONS (ID'S) LISTED IN THE FORM NOT MATCHING
 THE ID'S LISTED IN THE SCHEDULES, THERE ARE NUMEROUS
 INCONSISTENCIES AND SYSTEM OMISSIONS.
  
 A) THE OAU IS LISTED AS AN RTU AND HAS INCORRECT
 COMPLIANCE DATA-CAPACITY AND DESIGN EFFICIENCY.
 B) NO COMPLIANCE DATA IS LISTED FOR THE BOILERS AND
 PIPING.
 C) NO COMPLIANCE DATA FOR HP-H.
 D) NO COMPLIANCE DATA FOR THE HORIZONTAL HP'S, AND THE
 VERTICAL 8, 18, & 25 TON HP'S- SEE SHEET M602.
 E) COOLING TOWER EFFICIENCY IS NOT CONSISTENT WITH THE
 PROCEDURE DESCRIBED IN TABLE C403.2.3(8).
  
 6) SHEET M001 THERE ARE NO VENTILATION RATES OR OUTDOOR
 CFM VALUES LISTED IN THE ASHRAE VENTILATION TABLE-
 PLEASE SEE TABLE 403.3.1.1 FBC M.
  
 7) THE OAU THAT IS LOCATED ON THE 3RD FLOOR IS
 MISLABELED AS AN ENERGY RECOVERY RTU IN THE SCHEDULE,
 HOWEVER IS NOT AN RTU AND DOES NOT APPEAR TO BE
 EQUIPPED WITH ENERGY RECOVERY.
  
 8) M602: IN THE HP SCHEDULES PLEASE PROVIDE A SYSTEM ID
 IN THE TAG COLUMN LINES.
  
 9) M602: A MANUFACTURER'S SUBMITTAL AND WIND LOAD
 ENGINEERING FOR THE COOLING TOWERS IS REQUIRED IN
 ACCORDANCE WITH SECTIONS 908.1 AND 301.15 FBC M. PLEASE
 NOTE THE SPECS FOR THE TOWERS SHALL INDICATE THE UNITS
 ARE LISTED IN ACCORDANCE WITH UL 1995. THE ENGINEERING
 FOR THE SUPPORT STRUCTURE AND INSTALLATION OF THE
 TOWERS MAY BE DEFERRED IF REQUESTED- SEE COMMENT #3
 ABOVE.
  
 10) M100, M101A & M101B: REFER TO SECTION 301.16 FBC M
 COPIED BELOW AND PROVIDE COMPLIANCE INFORMATION:
 301.16. FLOOD HAZARD.
 FOR STRUCTURES LOCATED IN FLOOD HAZARD AREAS,
 MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES SHALL BE
 LOCATED AT OR ABOVE THE ELEVATION REQUIRED BY SECTION
 1612 OF THE FLORIDA BUILDING CODE, BUILDING FOR
 UTILITIES AND ATTENDANT EQUIPMENT.
 EXCEPTION: MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES
 ARE PERMITTED TO BE LOCATED BELOW THE ELEVATION
 REQUIRED BY SECTION 1612 OF THE OF THE FLORIDA BUILDING
 CODE, BUILDING FOR UTILITIES AND ATTENDANT EQUIPMENT
 PROVIDED THAT THEY ARE DESIGNED AND INSTALLED TO
 PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE
 COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC
 LOADS AND STRESSES, INCLUDING THE EFFECTS OF BUOYANCY,
 DURING THE OCCURRENCE OF FLOODING UP TO SUCH ELEVATION.
 301.16.1COASTAL HIGH-HAZARD AREAS AND COASTAL A ZONES.
 IN COASTAL HIGH-HAZARD AREAS AND COASTAL A ZONES
 MECHANICAL SYSTEMS AND EQUIPMENT SHALL NOT BE MOUNTED.
  
 11) M100: REPLACE KEYNOTES 7 & 8 WITH 1 & 2 TO MATCH
 THE PLANS.
  
 12) M100: PROVIDE OUTDOOR AIR (O/A) IN THE ELEVATOR
 LOBBY AND OTHER OCCUPIED STORAGE ROOMS- SEE SECTION
 404.3 AND TABLE 403.3.1.1 FBC M.
  
 13) M100, M101A, M101B, M503, M601- PARKING GARAGES:
 A) LOCATIONS OF THE BASEMENT EXHAUST FANS NOT SHOWN.
 B) CALCULATIONS INDICATE INADEQUATE VENTILATION WITH
 ALL 1ST AND 2ND FLOOR FANS OPERATING AT FULL CAPACITY-
 SEE CALCULATIONS ON M100, M101A & M101B AND SCHEDULE ON
 M601.
 C) THE LOCATIONS OF THE GROUND FLOOR EXHAUST FANS DO
 NOT MEET COMPLIANCE WITH SECTION 502.1.1 FOR HAVING
 EXHAUST INLETS AT AREAS OF HEAVIEST CONCENTRATIONS OF
 CONTAMINANTS.
 D) PROVIDE SUBMITTALS FOR THE CO AND NO2 SENSORS AND
 CONTROLLER- SEE COMMENT #4 ABOVE.
 E) PROVIDE CALCULATIONS FOR THE AIR INTAKE LOUVERS AT
 THE SHAFT AND SUBMITTALS FOR THE LOUVERS AND THE FIRE
 DAMPERS.
 F) PROVIDE A SEQUENCE OF OPERATION FOR THE FIRE DAMPERS
 AT THE SHAFT.
 G) CLARIFY OR SHOW HOW THE AIR SHAFT IS CONNECTING WITH
 THE EXTERIOR OF THE BUILDING.
 E) INDICATE THE HEIGHT FROM THE FINISHED GARAGE FLOORR
 TO THE BOTTOM SIDES OF THE CIRCULATION FANS- SECTION
 304.6.
  
 14) M101A- GENERATOR:
 A) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 GENERATOR, EXHAUST PIPE, MUFFLER, THIMBLE, SILENCER-
 SEE COMMENT #4 ABOVE.
 B) SUBMIT THE UL 2200 CERTIFICATE OF COMPLIANCE.
 C) PROVIDE EXHAUST VENTILATION CALCULATIONS AND A
 SEQUENCE OF OPERATION FOR EF-1L-1.
 D) PLEASE REVIEW SECTION 7.7.1 NFPA 110. AN AC SYSTEM
 MAY BE REQUIRED FOR THE GENERATOR ROOM IN ORDER TO
 LIMIT THE MAXIMUM AIR TEMPERATURE IN THE ROOM TO THE
 MAXIMUM AMBIENT AIR TEMPERATURE AS REQUIRED BY THE
 GENERATOR MANUFACTURER.
  
 15) M101A: INDICATE HOW THE POOL EQUIPMENT ROOM WILL BE
 VENTILATED. PLEASE NOTE THAT IF A FUEL FIRED POOL
 HEATER IS TO BE INSTALLED IN THE ROOM, COMBUSTION AIR
 PER SECTION 304 FBC FG IS REQUIRED, AND A VESTIBULE
 WITH A TWO-WAY DOOR SEPARATION SHALL BE PROVIDED- SEE
 SECTION 305.3.2 FBC FG AND EXCEPTION.
  
 16) M101A: KEYNOTES #7 & 8 SHOWN AT THE BOTTOM OF THE
 PLAN SHEET DO NOT APPEAR ON THE ACTUAL PLAN.
  
 17) M101A: NOTE #1 BY HP-1L-1 HAS NO CORRESPONDING TEXT
 ON THE PLAN SHEET, ALTHOUGH IT APPEARS TO BE
 IDENTIFYING A REQUIRED O/A INTAKE DAMPER.
  
 18) M101A: PROVIDE VENTILATION FOR THE DOCKMASTER,
 TRASH HOLDING, AND FIRE COMMAND ROOMS.
  
 19) M101A & M101B: FIRE DAMPERS MISSING AT TRASH ROOM
 EXHAUST DUCT PENETRATIONS OF THE FIRE-RATED ELEVATOR
 LOBBY AND PUMP ROOM WALLS- SECTION 607.5.2 FBC M. A)
 PROVIDE EXHAUST VENTILATION CALCULATIONS AND A SEQUENCE
 OF OPERATION FOR THE EF-1L-5. B) IT APPEARS THAT THE
 TRASH EXHAUST DOES NOT TERMINATE TO THE OUTDOORS.
  
 20) M101A & M101B: PROVIDE WIND LOAD ENGINEERING FOR
 INSTALLATION OF THE EXTERIOR CU'S- SEE COMMENT #4 AND
 SECTION 301.15 FBC M.
  
 21) M101A & M101B: PROVIDE AN ELEVATION VIEW, AND
 INSTALLATION DETAILS FOR THE GARAGE EXHAUST FANS ON THE
 EXTERIOR WALL.
  
 22) M101B: FIRE DAMPER MISSING AT O/A DUCT PENETRATION
 OF WATER PUMP FIRE RATED WALL- SECTION 607.5.2 FBC M.
  
 23) M101B: PROVIDE AN ENLARGED DRAWING OF THE WATER
 PUMP ROOM SHOWING ALL REQUIRED WORKING CLEARANCES
 AROUND THE EQUIPMENT, AND SUBMIT MANUFACTURER?S
 SPECIFICATIONS FOR THE BOILERS, HEAT EXHANGERS AND THE
 PUMPS. IT APPEARS NOTE #4 AT THE BOILER SHOULD BE
 CHANGED TO NOTE #6.
  
 24) M101B: PROVIDE EXHAUST VENTILATION CALCULATIONS FOR
 THE WATER PUMP ROOM AND A SEQUENCE OF OPERATION FOR
 EF-1L-4.
  
 25) M100, M101A & M101B: REFER TO SECTIONS 401.4 AND
 501.3.1 AND PROVIDE CLEARANCE DISTANCE MEASUREMENTS FOR
 THE O/A INLETS AND EXHAUST OUTLETS. SUBMIT
 MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS
 FOR THE LOUVERS.
  
 26) M102A: PLEASE IDENTIFY ALL ROOMS AND SPACES SHOWN
 ON THE PLAN.
  
 27) M102A: PROVIDE VENTILATION FOR THE STORAGE, TRASH
 AND PACKING RMS- TABLE 403.3.1.1 FBC M.
  
 28) M102A: PROVIDE RETURN DUCT SIZES AT HP-2L-1.
  
 29) M102A: PROVIDE EXHAUST VENTILATION CALCULATIONS AND
 A SEQUENCE OF OPERATION FOR THE EF'S IN THE ROOMS
 ADJACENT TO THE MECHANICAL ROOM.
  
 30) M102B: IDENTIFY ALL ROOMS AND SPACES ON THE PLANS
 AND PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE
 EF'S AND A SEQUENCE OF OPERATION FOR THE FANS.
  
 31) M103: FD MISSING AT 70X26" DUCT PENETRATING
 FIRE-RATED MECH ROOM (OAU-1) SECTION 607.5.2 FBC M.
  
 32) M103: FD?S MISSING AT 30X20" AND 24X20" RETURN
 DUCTS PENETRATING FIRE-RATED MECH ROOM WALL (HP-3L-2
 AND 3L-3)- SECTION 607.5.2.
  
 33) M103: PROVIDE ENLARGED MECHANICAL PLANS FOR THE
 PRIVATE DINING/PERFORMANCE KITCHEN AREA- SECTION
 107.2.1 WPB, AND SUBMIT MANUFACTURER'S SPECIFICATIONS
 FOR ALL COOKING APPLIANCES. PLEASE NOTE THAT SEPARATE
 PERMITS ARE REQUIRED FOR KITCHEN EXHAUST HOODS, HOWEVER
 AN AIR BALANCE CALCULATION IS REQUIRED ON THE MAIN MECH
 PLANS- PLEASE PROVIDE.
  
 33) M103: THE PLAN INDICATES THAT AIR FROM THE KITCHEN
 WILL BE RECIRCULATED TO OTHER ROOMS AND SPACES OUTSIDE
 OF THE KITCHEN WHICH IS PROHIBITED PER TABLE 403.3.1.1
 FBC M FOOTNOTE B
  
 34) M103: EXHAUST VENTILATION AT A RATE OF 0.7 CFMS PER
 SF. IS REQUIRED FOR THE KITCHEN- TABLE 403.3.1.1 FBC M.
  
 35) M103: SHOW HOW O/A IS BEING PROVIDED TO GUEST
 SUITES 1 & 2- TABLE 403.3.1.1.
  
 36) M104, 106, 107, 108: VENTILATION REQUIRED FOR THE
 TRASH ROOMS AND CORRIDORS BY STAIRWELL.
  
 37) M104, 106, 107, 108, 109, 110: THE FSD'S AT THE
 SHAFTS MUST BE MOTORIZED IN ORDER TO OPERATE IN
 SEQUENCE WITH THE SMOKE CONTROL SYSTEM- PLEASE PLACE A
 SYMBOL AT EACH LOCATION.
  
 38) M104: IT APPEARS THAT SOME O/A DUCTS SUPPLYING THE
 APARTMENT HAVE FD'S AT THE CORRIDOR WALL PENETRATIONS
 AND OTHERS DO NOT- PLEASE CLARIFY.
  
 39) M-107: PLEASE PROVIDE AN ENLARGED PLAN FOR THE
 BOILER ROOM SHOWING THE LOCATIONS OF ALL EQUIPMENT AND
 WORKING CLEARANCES. INCLUDE AN EQUIPMENT SCHEDULE AND
 SUBMIT SPECS FOR ALL EQUIPMENT. A) PROVIDE VENTILATION
 FOR THE ROOM.
  
 40) M109: SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE FLAMEBAR DUCTWORK,
 INCLUDING A DETAIL FOR INSTALLATION OF THE FIRE DAMPER
 IN THE DUCT- SEE COMMENT #4 ABOVE.
  
 41) M109: THE PLAN SHOWS 5-TON AC SYSTEMS WHICH REQUIRE
 DUCT SMOKE DETECTORS TO BE INSTALLED AT EACH MAIN
 SUPPLY TRUNK. IN ADDITION THE PLAN APPEARS TO INDICATE
 A SHARED PLENUM WHICH WILL REQUIRE DUCT SMOKE DETECTORS
 AT ALL AIR HANDLER LOCATIONS- SECTIONS 606.2.1 &
 606.2.2 FBC M.
  
 42) M110: PROVIDE WIND LOAD ENGINEERING DRAWINGS FOR
 THE ROOFTOP FANS AND CURBS, CONDENSERS AND STANDS, AND
 ALL REQUIRED DUCT SUPPORTS AND BRACKETS. PLEASE INCLUDE
 FL. PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE
 STANDS. SHOW HOW THE FANS AND DUCTS WILL CONNECT TO THE
 SHAFTS.
  
 43) M110: PROVIDE A SEQUENCE OF OPERATION FOR THE SMOKE
 DETECTORS IN THE PRESSURIZATION FANS. CLARIFY HOW WILL
 THESE DETECTORS WILL INTERACT WITH THE SMOKE CONTROL
 SEQUENCING PROCEDURES.
  
 44) M220, 221, 222, 223, 224, 225, 226, 227, 228, 229:
 A) SUBMIT SPECS FOR THE CLOTHES DRYERS, RECIRCULATION
 EXHAUST HOODS, COOKING APPLIANCES AND THE X-VENTS.
 B) CLARIFY HOW MAKEUP AIR IS BEING PROVIDED FOR THE
 DRYERS- SECTION 504.6 FBC M.
 C) VERIFY THAT THE DRYER EXHAUST DUCT IS NOT IN A
 RETURN AIR PLENUM- SECTION 504.4
 D) PROVIDE THE TOTAL LENGTH OF THE DRYER EXHAUST DUCT
 RUNS- SECTION 504.8.4.
 E) VERIFY NO COMBUSTIBLES IN AC CLOSETS INCLUDING THE
 CLOSET DOORS.
 F) PROVIDE SMOKE DETECTORS IN RETURN AIR PLENUM-RATED
 AC CLOSETS
  
 45) SHEETS M221, 222, 223, 224, 225, 226, 227, 229,
 230:
 LISTED BELOW ARE DEFICIENCIES IN THE RETURN AIR SYSTEMS
 OF THE APARTMENTS AND SOME OTHE MISSING INFORMATION
 REFER TO SECTION 601.6 FBC M ITEMS 1-3 AND CORRECT.
  
 A) M221: PROVIDE RETURN AIR FROM THE MASTER BEDROOM.
  
 B) M222: PROVIDE RETURN AIR FROM THE BEDROOM 2.
  
 C) M223: IDENTIFY ALL ROOMS ON THE PLAN- SECTION
 107.2.1
  
 D) M224: 1) IDENTIFY ALL ROOMS ON THE PLAN. 2) THE
 RETURN TRANSFERS FROM THE BEDROOMS ARE UNDERSIZED.
  
 E) M225: MASTER BEDROOM AND BEDROOM #2 TRANSFER DUCTS
 ARE UNDERSIZED.
  
 F) M226: 1) THE PLAN IS CUT-OFF AT THE NORTHEAST. 2)
 PROVIDE RETURN AIR FROM BEDROOMS 2 & 3.
  
 G) M227: A) IDENTIFY ALL ROOMS. B) THE 20X6 TRANSFER
 GRILL IS UNDERSIZED.
  
 H) M229: 1) PROVIDE COMPLETE ROOM IDENTIFICATIONS. 2)
 PROVIDE RETURN AIR FROM THE YOGA ROOM. 3) PROVIDE A
 DUCT SMOKE DETECTOR IN THE SUPPLY SYSTEM OF HP-H. 4)
 LABEL ALL THE HP'S IN THE SPACE. 5) BEDROOM #2 & 3
 TRANSFER DUCTS ARE UNDERSIZED. 6) DUCT SMOKE DETECTORS
 ARE REQUIRED IN THE SUPPLY SYSTEMS OF EACH 5-TON HP-
 SECTION 606.2.1, AND ALSO IN THE AC CLOSETS IF SHARING
 THE PLENUM.
  
 53) M230: THE 18X10" AND 16X10" RETURN DUCTS ARE
 UNDERSIZED.
  
 54) M502: THE DUCTWORK CONNECTING THE PRESSURIZATION
 FANS TO THE SHALFTS SHALL BE FIRE-RATED PER SECTION-
 909.21.3 FBC B.
  
 55) M502: THE HOISTWAY SHAFT VENTS SHALL BE PROVIDED
 WITH CLASS I MOTORIZED DAMPERS WITH A MAXIMUM LEAKAGE
 RATE OF 4 CFM/FT2 AT 1.0 INCH WATER GAUGE (W.G.) (249
 PA) WHEN TESTED IN ACCORDANCE WITH AMCA 500D- SECTION
 C403.2.4.3 FBC M.
  
 56) M-701: SOME OF THE REQUESTED WIND LOAD ENGINEERING
 HAS BEEN PROVIDED HOWEVER THE DETAILS ARE INCOMPLETE
 AND NO WIND DESIGN CRITERIA HAS BEEN PROVIDED.
  
 57) POST FIRE SMOKE REMOVAL SYSTEM: PROVIDE
 CALCULATIONS TO VERIFY FAN SIZING IN ACCORDANCE WITH
 THE SMOKE CONTROL SYSTEM REQUIREMENTS LISTED ON PAGE 29
 OF THE REPORT.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status P Date 2019-09-06 Cont ID  
Sent By rmcdouga Date 2019-09-06 Time 07:09 Rev Time 0.00
Received By rmcdouga Date 2019-09-06 Time 07:09 Sent To  
Notes
2019-09-06 07:09:49LETTER OF MAP REVISION BASED ON FILL (LOMR-F) DATED
 JANURARY 10, 2019, CASE NUMBER 19-04-1248A. PROPERTY
 AROUND BUILDING WAS REMOVED FROM THE SFHA AND CHANGED
 TO FLOOD ZONE X.

Review Stop P PLUMBING
Rev No 4 Status P Date 2019-08-28 Cont ID  
Sent By gjohnson Date 2019-08-28 Time 15:45 Rev Time 0.00
Received By gjohnson Date 2019-08-26 Time 17:29 Sent To  
Notes
2019-08-28 15:49:34PROVISO: 18081528
  
  
 PLEASE COMPLY WITH THE FOLLOWING COMMENTS BEFORE 2ND
 ROUGH INSPECTION.
  
 1. PLEASE REVISE SHEETS A103 P-103, 241 THEY DO NOT
 MATCH THE REDESIGN OF THE MEN AND WOMEN BATHROOMS SHOWN
 ON SHEET A-245 ON SHEET P241 REVISE THE FLOOR PLAN AND
 ISOMETRIC DRAWING AND ADD THE URINAL ON THE
 ISOMETRIC.PER WPB AMEND TO FBC 107.2.1
  
 2. THE REAR GRAB BAR FOR THE COMMON AREA TOILETS SHALL
 BE 12" AND 24" FROM THE CENTER OF THE TOILET SHT P-245
 DETAIL # 11+7 DO NOT COMPLY
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]

Review Stop P PLUMBING
Rev No 3 Status F Date 2019-06-05 Cont ID  
Sent By gjohnson Date 2019-06-05 Time 09:28 Rev Time 0.00
Received By gjohnson Date 2019-05-20 Time 08:45 Sent To  
Notes
2019-06-05 09:28:28 
 3RD REVIEW: 18011528
 2017 FLORIDA BUILDING CODE 6TH EDITION
 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH
 EDITION
  
 PLUMBING COMMENTS: PREVIOUS COMMENTS.
  
 1. SHT. A-772 DETAIL #12 TYPE 10 BATHROOM, THE CLEAR
 FLOOR SPACE FOR THE SHOWER SHALL RUN PARALLEL TO THE
 FIXTURE AND THE END LINE UP WITH THE CONTROL WALL. PER
 FHA DESIGN MANUAL REQUIREMENT #7 PG. 7.5
  
 14. SHT. P-502 LABEL ALL WATER PIPING WITH HOT , COLD,
 RETURN . PER WPB AMEND TO FBC 107.2.1
  
 NEW COMMENTS:
  
 1. SHOWERS IN SPA SHALL COMPLY WITH ANSI 117.1 1986
 SEC. 4.21 SHOW COMPLIANCE ON PLAN CONTROLS, GRAB BARS
 AND CLEAR FLOOR SPACE.
  
 2. THE MEN AND WOMENS BATHROOM ON LEVEL 3 SHALL HAVE A
 LAVATORY OUT SIDE THE ACCESSIBLE STALL AND IN THE SAME
 ROOM AS THE REQUIRED WATER CLOSET.PER FBC PL 405.3.2
  
 3.COMMON AREA BATHROOMS SHOW THE DISTANCE OF THE SIDE
 WALL GRAB BAR FROM THE REAR WALL OF THE TOILET. ANZI
 117.1 1986 SEC 416.4
  
 4. COMMON AREA BATHROOMS SHOW HEIGHT OF TOILET PER ANZI
 117.1 1986 SEC 416.3
  
 5. COMMON AREA BATHROOMS SHOW DIMENSIONS OF REAR GRAB
 BARS IN REFERENCE TO CENTER OF TOILET. ANZI 117.1 1968
 SEC 416.4
  
 6. COMMON AREA BATHROOMS SHOW HEIGHT OF TOILET PAPER
 DISPENSER. ANZI 117.1 1968 SEC 416.6
  
 7. COMMON AREA BATHROOMS SHOW CENTER OF TOILET OFF SIDE
 WALL ANZI 117.1 1968 SEC 416.2
  
 8. SHT. P-502B COMPLY WITH THE FOLLOWING:REQUIRED TO
 DETERMINE CODE COMPLIANCE. PER WPB AMEND TO FBC 107.2.1
 A) EXPAND THE ISOMETRIC DRAWING.
 B) SHOW FLOOR LEVELS ON ISOMETRIC DRAWING.
 C) THERE ARE PIPES THAT END WITH NO LABEL OR LOCATION
 TAG PLEASE LABEL ALL PIPING TERMINATION POINTS SOME
 EXAMPLES ARE BRANCHES OFF THE FOLLOWING STACKS S/1,
 S/20, S/4, S/6, S13, S/13, S/12, S/11
 D) SHOW THE REQUIRED CLEAN OUTS AT THE BASE OF THE
 STACKS.
  
 9. SHT. P-502A COMPLY WITH THE FOLLOWING:REQUIRED TO
 DETERMINE CODE COMPLIANCE. PER WPB AMEND TO FBC 107.2.1
 A) PLEASE ORIENTATE THE ISOMETRIC SO THAT THE BOTTOM OF
 THE DRAWING IS LINED UP WITH THE BOTTOM OF THE PLAN
 PAGE.
 B) THERE ARE PIPES THAT END WITH NO LABEL OR LOCATION
 TAG PLEASE LABEL ALL PIPING TERMINATION POINTS.
 C) SHOW FLOOR LEVELS ON THE SOILSTACKS NOT JUST VENTS.
 D) SHOW ALL BRANCHES ON THE SANITARY STACKS FOR EACH
 FLOOR.
 E) ARE THE TOP OF THE SOIL STACKS CONNECTING TO THE
 VENT STACKS IF SO PLEASE SHOW ON THE DRAWING.
 F) THE TOP OF S/14 SHWS A FLOOR DRAIN THAT IS NOT
 CONNECTED TO PIPING PLEASE CLARIFY.
  
 10. P-501 PLEASE ORIENTATE ISOMETRIC SO THAT THE BOTTOM
 OF THE DRAWING IS LINED UP WITH THE BOTTOM OF THE PLAN
 PAGE.
  
 11. SHT A-774 COMPLY WITH THE FOLLOWING:REQUIRED TO
 DETERMINE CODE COMPLIANCE. PER WPB AMEND TO FBC 107.2.1
 A) DETAIL #4 THE TOILET SHALL BE 18" OFF THE SIDE WALL
 OR GRAB BAR SIDE FHA REQ. #6
 B) DETAIL #4 THE CLEAR FLOOR SPACE PARALLEL TO THE
 SHOWER AND LINED UP WITH THE CONTROL WALL FHA REQ 7 PG
 7.56
 C)DETAIL #7 THE TOILET SHALL BE 18" OFF THE SIDE WALL
 OR GRAB BAR SIDE FHA REQ. #6
 D) DETAIL #7 THE CLEAR FLOOR SPACE PARALLEL TO THE
 SHOWER AND LINED UP WITH THE CONTROL WALL FHA REQ 7 PG
 7.56
 E) DETAIL #10 THE CLEAR FLOOR SPACE PARALLEL TO THE
 SHOWER AND LINED UP WITH THE CONTROL WALL FHA REQ 7 PG
 7.56
 F) DETAIL #10 THE TOILET SHALL BE 18" OFF THE SIDE WALL
 OR GRAB BAR SIDE FHA REQ. #6
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]

Review Stop P PLUMBING
Rev No 2 Status F Date 2019-02-13 Cont ID  
Sent By gjohnson Date 2019-02-13 Time 09:58 Rev Time 0.00
Received By gjohnson Date 2019-02-06 Time 17:08 Sent To  
Notes
2019-02-13 09:58:43 
 2ND REVIEW: 18011528
 2017 FLORIDA BUILDING CODE 6TH EDITION
 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH
 EDITION
  
 PLUMBING COMMENTS: PREVIOUS COMMENTS.
 1. COMPLIED
 2. COMPLIED
 A) COMPLIED
 A) COMPLIED
 B) LABEL ALL CLEAR FLOOR SPACE WITH DIMENSIONS PER ANSI
 A117.1-1986 4.17.3 AND4.19.2.2 AND FHA REQUIREMENT #7
 ON ALL ENLARGED BATHROOM FLOOR PLANS PLEASE EITHER NOTE
 NEXT TO OR ON, PLACE THE DIMENSIONS ON THE CLEAR FLOOR
 SPACE.
 C) COMPLIED
 3. COMPLIED
 4. COMPLIED
 5. COMPLIED
 6. THE LINE FOR THE INTERIOR WALLS AND FIXTURES ARE
 EXTREMELY LIGHT SOME PLUMBING FIXTURES ARE MISSING ON
 THE FLOOR PLANS PLEASE DARKEN LINES AND INCLUDE FIXTURE
 ON ALL FLOOR PLAN SHEETS. PER WPB AMEND TO FBC THE GRID
 LINES ARE SO DARK AND THE LINES FOR THE WALLS ARE SO
 LIGHT IT IS EXTREMELY DEFAULT TO READ THE PLAN PLEASE
 CLARIFY.
 7. COMPLIED
 8. COMPLIED
 9.COMPLIED
 10. COMPLIED
 11. COMPLIED
 12. COMPLIED
 13. SHT A-790/ A-791/ A-792 THE DRAWING ARE EXTREMELY
 LIGHT PLEASE DARKEN. PER WPB AMEND TO FBC 107.2.1
 14. COMPLIED
 15. PROVIDE MANUFACTURE SPECIFICATION FOR RUBBERIZED
 SHOWER PAN LINER TO COMPLY WITH FBC PL 417.5.2-
 417.5.2.6
 16. PROVIDE DETAIL FOR EMERGENCY SCUPPER WITH
 DIMENSIONS. PER WPB AMEND TO FBC 107.2.1SHT. A-809
 DETAIL #2 DID NOT GIVE THE WIDTH DIMENSIONS PLEASE
 CLARIFY.
 17. COMPLIED
 18. COMPLIED
 19. COMPLIED
  
 NEW COMMENTS:
  
 1. SHT. A-772 DETAIL #12 TYPE 10 BATHROOM, THE CLEAR
 FLOOR SPACE FOR THE SHOWER SHALL RUN PARALLEL TO THE
 FIXTURE AND THE END LINE UP WITH THE CONTROL WALL. PER
 FHA DESIGN MANUAL REQUIREMENT #7 PG. 7.56
 2. PLEASE SHOW THE CLEAR FLOOR SPACE WITH DIMENSIONS
 FOR THE TOILETS IN THE FHA BATHROOMS ON THE UNIT
 BATHROOM PLAN SHEETS. PER FHA DESIGN MANUAL REQ. #7
 PG.7.43
 3.SHT A-774 THE GUEST SUITES SHALL COMPLY WITH FAIR
 HOUSING PLEASE INDICATE DESIGN SPEC FOR THE BATHROOMS A
 OR B PER FHA DESIGN MANUAL REQUIREMENT #7
 4.SHT. A-221 SHOWS BATHROOM TYPE 2 AS THE FHA SPEC B
 BATHROOM SHT A-771 SHOWS THE TYPE # AS THE FHA BATHROOM
 AND SHT G-5 LIST TYPE 3 PLEASE CLARIFY. PER WPB AMEND
 TO FBC 107.2.1
 5. SHT. A-222 INDICATE ON THE PLAN WHICH IS THE FHA
 BATHROOM. PER WPB AMEND TO FBC 107.2.1
 6.SHT. A-222 UNIT C IF FHA SPEC A IS USED ALL THE
 BATHROOMS SHALL COMPLY. PER FHA REQUIREMENT #7 PG. 7.34
 AND 7.35
 7.SHT. A-222,223,224,225,226 INDICATE TYPE FHA BATHROOM
 . PER FHA REQUIREMENT #7
 8.SHT. A-229A INDICATE ON THE PLAN WHICH BATHROOM IS
 THE FHA BATHROOM PER FHA REQUIREMENT #7
 9. SHT. A-770, 771, 772,773, 774 PLEASE INDICATE ON THE
 PLAN WHERE THE GRAB BAR BACKING IS REQUIRED ALL
 BATHROOMS EXCEPT THE POWDER ROOM SHALL HAVE IT. PER FHA
 DESIGN MANUAL REQ. #6
 10.ANY WING WALL OR VANITY NEXT TO THE TOILET IN THE
 FHA BATHROOMS SHALL NOT EXTEND OVER 24" FROM THE BACK
 WALL. PER FHA DESIGN MANUAL REQ. #7 PG. 7.43
 11.PLEASE PROVIDE A DETAIL FOR THE GREASE INTERCEPTOR
 PIPING AND MOUNTING SYSTEM. PER WPB AMEND TO FBC
 107.2.1
 12. PLEASE PROVIDE MANUFACTURE SPECIFICATIONS AND
 INSTILLATION GUIDE FOR THE GREASE INTERCEPTOR. PER WPB
 AMEND TO FBC 107.2.1
 13. PROVIDE SIZING CALCULATION FROM THE MANUFACTURE FOR
 THE GREASE INTERCEPTOR. PER WPB AMEND TO FBC 107.2.1
 AND FBC PL 1003.2
 14. SHT. P-502 LABEL ALL WATER PIPING WITH HOT , COLD,
 RETURN AND UNIT TYPE. PER WPB AMEND TO FBC 107.2.1
 15. SHT P-502 THE SANITARY RISER DIAGRAM IS DO
 DIFFICULT TO DETERMINE CODE COMPLIANCE PLEASE PROVIDE A
 3 DIMENSIONAL ISOMETRIC DRAWING FOR THE UNDERGROUND
 COLLECTION PIPING AND SEPARATE SOIL STACK ISOMETRICS.
 PER WPB AMEND TO FBC 107.2.1
 16. FOR THE FUEL OIL SYSTEM PLEASE SUBMIT THE
 FOLLOWING:
 A)MANUFACTURES SPECIFICATION FOR ALL EQUIPMENT BEING
 USED ON FUEL OIL SYSTEM INCLUDING TANK.
 B) A FLOOR PLAN AND ISOMETRIC DRAWING OF THE PIPING AND
 TANK.
 PER WPB AMEND TO FBC 107.2.1
 THE FUEL OIL SYSTEM CAN BE SUBMITTED AS A SEPARATE
 PERMIT IF THAT IS YOUR INTENT PLEASE REMOVE ANY DETAILS
 OR DRAWING FROM THE MASTER SET.
 17. PROVIDE AN ENLARGED FLOOR PLAN FOR ALL BOILER AND
 PUMP ROOMS ON THE 1ST AND 23RD FLOORS AND PIPING
 DETAIL. PER WPB AMEND TO FBC 107.2.1
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-12-06 Cont ID  
Sent By gjohnson Date 2018-12-06 Time 11:21 Rev Time 0.00
Received By gjohnson Date 2018-11-26 Time 13:00 Sent To  
Notes
2018-12-06 11:22:101ST REVIEW:
 2017 FLORIDA BUILDING CODE 6TH EDITION
 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH
 EDITION
  
 PLUMBING COMMENTS:
 1. PLEASE STATE ON THE PLAN WHICH FHA DOCUMENT YOU ARE
 USING TO DESIGN THIS PROJECT. PER WPB AMEND TO FBC
 107.2.1
 2. ALL COMMON AREA BATHROOMS SHALL COMPLY WITH ANSI
 A117.1-1986 PLEASE SHOW COMPLIANCE WITH THE FOLLOWING.
 A) THE SIDE WALL GRAB BAR AT THE TOILET SHALL BE 42
 INCHES LONG MINIMUM, LOCATED 12 INCHES MAXIMUM FROM THE
 REAR WALL AND EXTENDING 54 INCHES MINIMUM FROM THE REAR
 WALL. PER ANSI A117.1-1986 4.17.6
 A) THE REAR WALL GRAB BAR SHALL BE 36 INCHES LONG
 MINIMUM AND EXTEND FROM THE CENTERLINE OF THE WATER
 CLOSET 12 INCHES MINIMUM ON ONE SIDE AND 24 INCHES
 MINIMUM ON THE OTHER SIDE. PER ANSI A117.1-1986 4.17.6
 B) LABEL ALL CLEAR FLOOR SPACE WITH DIMENSIONS PER ANSI
 A117.1-1986 4.17.3 AND4.19.2.2
 C) SHOWER STALLS SHALL COMPLY WITH ANSI A117.1-1986
 4.21
 3. PLEASE LABEL ALL COMMON AREA BATHROOMS MEN'S OR
 WOMEN SEPARATE FACILITIES REQUIRED. PER FBC PL 403.2
 4. PROVIDE PLUMBING FIXTURE COUNT BREAKDOWN PER AREA.
 WPB AMEND TO FBC 107.2.1
 5. SEPARATE FACILITIES REQUIRED FOR ROOMS 211 AND 213
 AND SURROUNDING AREA. PER FBC PL 403.2
 6. THE LINE FOR THE INTERIOR WALLS AND FIXTURES ARE
 EXTREMELY LIGHT SOME PLUMBING FIXTURES ARE MISSING ON
 THE FLOOR PLANS PLEASE DARKEN LINES AND INCLUDE FIXTURE
 ON ALL FLOOR PLAN SHEETS. PER WPB AMEND TO FBC
 7. PLEASE PROVIDE A SCHEDULE OF THE FHA BATHROOMS WITH
 UNIT AND SPEC TYPE MARKED. PER WPB AMEND TO FBC 107.2.1
 8. SHOW THE CLEAR FLOOR SPACE FOR ALL THE FHA
 LAVATORY?S. PER FHA REQUIREMENT #7
  
 9. SHT A-771 AND A-772 DETAILS #12 + 17 THE CLEAR FLOOR
 SPACE FOR THE LAVATORY SEEMS TO BE ENCROACHED BY THE
 TOILET. PLEASE CLARIFY. PER FHA REQUIREMENT #7
 10. IN THE SPEC B BATHROOMS THE CLEAR FLOOR SPACE FOR
 THE SHOWERS SHALL LINE UP WITH THE CONTROL WALLS. PER
 FHA REQUIREMENT #7
 11. WHERE THE DOOR SWING IS INTO THE BATHROOM A 30"X48"
 CLEAR FLOOR SPACE OUTSIDE OF THE DOOR SWING IS
 REQUIRED. . PER FHA REQUIREMENT #7
 12. PLEASE PROVIDE ELEVATION OF LAVATORY IN GUEST SUITE
 BATHROOMS. . PER FHA REQUIREMENT #7
 13. SHT A-790/ A-791/ A-792 THE DRAWING ARE EXTREMELY
 LIGHT PLEASE DARKEN. PER WPB AMEND TO FBC 107.2.1
 14. THE KITCHEN SINK IN THE PRIVATE DINING ROOM AND
 CATERING AREA SHALL BE REQUIRED TO DISCHARGE THROUGH A
 GREASE INTERCEPTOR. PER FBC PL 1003.3.1
 15. PROVIDE MANUFACTURE SPECIFICATION FOR RUBBERIZED
 SHOWER PAN LINER TO COMPLY WITH FBC PL 417.5.2-
 417.5.2.6
 16. PROVIDE DETAIL FOR EMERGENCY SCUPPER WITH
 DIMENSIONS. PER WPB AMEND TO FBC 107.2.1
 17. PLEASE PROVIDE ISOMETRIC DRAWINGS FOR WATER
 SANITARY AND STORM DRAINS. THE RISERS SHOWN ON THE PLAN
 DO NOT PROVIDE SUFFICIENT DETAIL TO DETERMINE CODE
 COMPLIANCE YOU CAN PROVIDE ENLARGE DETAIL ISOMETRICS
 FOR INDIVIDUAL BATHROOM GROUPS AND COMMON AREAS. PER
 WPB AMEND TO FBC 107.2.1
 18. PLEASE SHOW THE TAGS FOR THE SS AND WATER STACKS ON
 THE ENLARGED FLOOR PLANS. PER WPB AMEND TO FBC 107.2.1
 19. PROVIDE DETAIL WITH DIMENSIONS FOR GRAB BAR BACKING
 IN ALL BATHROOMS. FHA REQUIREMENT #6
  
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status N Date 2018-11-30 Cont ID  
Sent By rmcdouga Date 2018-11-30 Time 18:31 Rev Time 0.00
Received By rmcdouga Date 2018-11-30 Time 18:30 Sent To  
Notes
2018-11-30 18:33:16DEFERRED SUBMITTALS - TPO ON ROOF, WATERPROOFING ON
 BALCONIES AND DECKS.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2019-09-13 Cont ID  
Sent By shill Date 2019-09-13 Time 05:43 Rev Time 0.00
Received By shill Date 2019-09-13 Time 05:43 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2019-06-17 Cont ID  
Sent By shill Date 2019-06-17 Time 16:12 Rev Time 0.00
Received By shill Date 2019-06-17 Time 16:12 Sent To  
Notes
2019-06-17 16:28:53****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. CIVIL ENGINEER (MICHAEL SPRUCE, PE) HAS A DIGITAL
 SIGNATURE THAT WAS SELF-SIGNED RATHER THAN ISSUED BY A
 THIRD PARTY CERTIFICATE AUTHORITY,
 FAC61G15-23.004(2)(B). THIS WAS DISCUSSED WITH
 ENGINEER'S OFFICE AND WILL BE RESOLVED; PLEASE CONTACT
 ME PRIOR TO RESUBMITTAL.
  
 2. STRUCTURAL ENGINEER DIGITAL SIGNATURE OK.
  
 3. FMEP ENGINEER (MATTHEW DONOLLI) DIGITAL SIGNATURE
 WAS SELF-SIGNED (DOES NOT COMPLY) FOR SOME SHEETS (FOR
 EXAMPLE, FP230); OTHERS (FOR EXAMPLE, P226) WERE SIGNED
 WITH A DIGITAL SIGNATURE ISSUED BY IDENTRUST (OK).
  
  
  
  
  
  
2019-06-05 11:22:54ELECTRICAL SHEETS OK.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2019-03-11 Cont ID  
Sent By shill Date 2019-03-11 Time 09:28 Rev Time 0.00
Received By shill Date 2019-03-11 Time 09:27 Sent To  
Notes
2019-03-11 09:08:32SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. ARCHITECTURAL PAGES LACK THE ARCHITECT BUSINESS
 NUMBER (AA26000733) WHICH IS REQUIRED TO BE ON EVERY
 PAGE PER FS481. PLEASE ADD TO ALL PAGES, BUT DO NOT
 RESUBMIT THESE PAGES UNLESS THERE ARE OTHER CHANGES.
  
 ARCHITECT'S DIGITAL SIGNATURE OK (ANDREW WYLIE BURNETT,
 AR98495)
  
 2. CIVIL PAGES LACK THE CERTIFICATE OF AUTHORIZATION
 NUMBER REQUIRED PER FS471. AS KIMLEY HORN HAS MORE THAN
 ONE, IT IS NOT CLEAR THROUGH WHIH COMPANY THIS IS BEING
 SIGNED AND SEALED. REVISE ALL PAGES TO INCLUDE, BUT
 RESUBMIT ONLY ONE PAGE UNLESS THERE ARE CHANGES AS A
 RESULT OF A PLAN REVIEW COMMENT.
  
 CIVIL ENGINEER'S DIGITAL SIGNATURE OK (MICHAEL DAVID
 SPRUCE, PE52776)
  
 3. STRUCTURAL PAGES OK (BRAD W. MALMSTEN, PE 71012,
 THORNTON TOMASETTI, CA7519)
  
 4. FIRE PROTECTION PAGES LACK THE CERTIFICATE OF
 AUTHORIZATION NUMBER REQUIRED PER FS471 FOR STANTEC
 CONSULTING SERVICES INC. (APPEARS TO BE CA27013 AS THE
 OTHERS ARE NULL AND VOID OR CLOSED). REVISE ALL PAGES
 TO INCLUDE, BUT RESUBMIT ONLY ONE PAGE UNLESS THERE ARE
 CHANGES AS A RESULT OF A PLAN REVIEW COMMENT.
  
 FP PAGES DIGITAL SIGNATURE OK (MATTHEW DONOLLI,
 PE56407)
  
 5. PLUMBING, MECHANICAL, ELECTRICAL, FIRE ALARM PAGES
 LACK THE CERTIFICATE OF AUTHORIZATION NUMBER REQUIRED
 PER FS471 FOR STANTEC CONSULTING SERVICES INC. (APPEARS
 TO BE CA27013 AS THE OTHERS ARE NULL AND VOID OR
 CLOSED). REVISE ALL PAGES TO INCLUDE, BUT RESUBMIT ONLY
 ONE PAGE UNLESS THERE ARE CHANGES AS A RESULT OF A PLAN
 REVIEW COMMENT.
  
 ELECTRICAL, PLUMBING AND MECHANICAL PAGES UPLOADED
 8/31/18 DIGITAL SIGNATURE OK (MATTHEW DONOLLI, PE56407)
 ALL FIRE ALARM PAGES DIGITAL SIGNATURE OK (MATTHEW
 DONOLLI, PE56407)
  
 THE FOLLOWING PAGES HAVE AN INVALID SIGNATURE:
 P100, P101A, P101B, 102B, OTHERS
 IT APPEARS THAT THE PAGES UPLOADED ON 1/12, 1/14 & 1/15
 HAVE AN INVALID SIGNATURE.
  
 6. DIGITAL SIGNATURES SUBMITTED NEXT REVIEW CYCLE
 REQUIRE REVIEW.
  
  
  
  
  
  
  
  
  
  
  
2019-02-12 09:19:452ND SUBMITTAL: ELECTRICAL SHEETS OK.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2018-11-15 Cont ID  
Sent By rmcdouga Date 2018-11-15 Time 07:15 Rev Time 0.00
Received By rmcdouga Date 2018-11-15 Time 07:15 Sent To  
Notes
2018-11-15 07:23:43SIGNATURES WILL BE VARIFIED AFTER THE CONSTRUCTION
 DOCUMENTS HAVE BEEN REVIEWED AND APPROVED.
2018-10-17 12:31:10ELECTRICAL SHEETS OK FOR SIGNATURE.

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status P Date 2019-01-14 Cont ID  
Sent By rmcdouga Date 2019-01-14 Time 09:56 Rev Time 0.00
Received By rmcdouga Date 2019-01-14 Time 09:56 Sent To  
Notes
2019-01-14 09:57:06THORNTON TOMASETTI (954) 903-9300
 101 NE 3RD AVE, SUITE 1170, FORT LAUDERDALE, FL 33301
 [email protected]
 ERIC DAVID SEARCH (786) 385-1518
 PE 54984
 SI 7018775
 NOTE: NO OTHER INSPECTOR'S INFORMATION WAS PROVIDED.
 ENGINEERS IN TRAINING ARE NOT ALLOWED TO PERFORM
 INSPECTIONS REQUIRED BY THE FLORIDA BUILDING CODE.

Review Stop Z ZONING
Rev No 4 Status P Date 2019-09-10 Cont ID  
Sent By eschneid Date 2019-09-10 Time 17:06 Rev Time 3.00
Received By eschneid Date 2019-09-10 Time 17:06 Sent To  
Notes
2019-09-10 17:09:30PASSED W/PROVISO
  
 REVISE SHEETS M-226, M-227, M-228, M-229, E-109 PRIOR
 TO FIRST INSPECTION TO REMOVE THE COOKING FACILITIES
 AND RECIRCULATING HOODS IN THE SECONDARY KITCHENS.

Review Stop Z ZONING
Rev No 3 Status F Date 2019-07-03 Cont ID  
Sent By eschneid Date 2019-07-03 Time 17:02 Rev Time 6.00
Received By eschneid Date 2019-07-03 Time 08:53 Sent To  
Notes
2019-07-03 17:04:39FAILED
  
 PROVIDE WRITTEN RESPONSES TO COMMENTS.
  
 1) REVISED COMMENT: STAFF HAS REVIEWED THE COMMENT
 RESPONSE IN ADDITION TO THE LETTER PROVIDED BY AARON
 KNIGHT, DATED APRIL 25, 2019, AS WELL AS THE ENLARGED
 UNIT PLANS AND ENLARGED ELECTRICAL PLANS AND HAS THE
 FOLLOWING COMMENTS.
  
 A. YOU MAY PROVIDE A "SECONDARY KITCHEN" PROVIDED THAT
 THERE ARE NO RANGES/COOK TOPS OR OVENS IN THE SECONDARY
 KITCHEN. STAFF NOTED THAT THE ARCHITECTURAL PLANS DO
 NOT SHOW THESE COOKING FACILITIES IN THE SECONDARY
 KITCHENS IN UNITS G, H OR I (UNIT E IS STATED IN THE
 LETTER AS HAVING A SECONDARY KITCHEN, BUT NONE SHOWN ON
 THE UNIT PLAN), SO THIS IS PERMITTED BY THE ZONING
 CODE. PLEASE NOTE THE ELECTRICAL PLANS FOR THESE UNITS
 DOES SHOW A "COOK TOP" ON THE ELECTRICAL PANEL, WITH
 THE ASSOCIATED OUTLET, WHICH IS NOT PERMITTED AND MAY
 NOT BE INSTALLED, AND THE MECHANICAL PLANS SHOW
 RECIRCULATING HOODS WHICH ARE NOT PERMITTED AND MAY NOT
 BE INSTALLED.
  
 B. SHEET A-229A SHOWS AN OVEN/RANGE IN THE SECONDARY
 KITCHEN, WHICH IS NOT PERMITTED AS THIS IS THE SECOND
 SET OF COOKING FACILITIES IN THE PENTHOUSE UNIT. NOTE:
 SHEET E-229 SHOWS A "COOK TOP" IN THE ELECTRICAL PANEL
 FOR THE SECONDARY KITCHEN; HOWEVER, THE OUTLET IS NOT
 SHOWN WHERE THE ARCHITECTURAL PLAN SHOWS THE
 NON-PERMITTED OVEN/RANGE IS SHOWN. THE SECOND
 OVEN/RANGE NEEDS TO BE REMOVED FROM THE PLANS AND THE
 ELECTRICAL PLANS CORRECTED.
  
 2) NEW COMMENT: ON SHEET A114 THE "TOTAL PROVIDED
 PARKING COUNT" TABLE (LOWER LEFT CORNER OF SHEET) NOW
 LISTS 183 PARKING SPACES PROVIDED BASED ON CHANGING THE
 MIX OF PARKING SPACES. THE "PARKING PROVIDED" TABLE
 (TOP MIDDLE OF SHEET) CONTINUES TO LIST 184 PARKING
 SPACES PROVIDED. ALL TABLES MUST LIST CORRECT,
 CONSISTENT INFORMATION. NOTE THERE ARE 18 BICYCLE
 PARKING SPACES PROVIDED.
  
 3) NEW COMMENT: ON SHEET A114 THE NEW PARKING LAYOUT
 CHANGED (NO CLOUDING OF PLANS PROVIDED) AND STAFF NOTED
 THE FOLLOWING ISSUES:
  
 A. PARKING SPACE #8 IS NO LONGER DESIGNATED ON THE
 PLANS AND NO DIMENSIONS WERE PROVIDED TO VERIFY THAT IT
 MEETS MINIMUM CODE REQUIREMENTS.
 B. PARKING SPACE #9 DOES NOT FUNCTION DUE TO THE COLUMN
 AT ITS HEAD MAKING THE SPACE LESS THAN THE REQUIRED 16
 FEET IN DEPTH (FOR A COMPACT SPACE) DUE TO THE
 ELIMINATION OF THE WHEEL STOP OVERHANG. NOTE: THIS IS
 DIFFERENT FROM HOW IT APPEARS ON SHEETS A-101 AND
 A-101A
 C. PARKING SPACE #26 IS NO LONGER DESIGNATED ON THE
 PLANS AND NO DIMENSIONS WERE PROVIDED TO VERIFY THAT IT
 MEETS MINIMUM CODE REQUIREMENTS.
 D. PARKING SPACE #29 CHANGED FROM A COMPACT SPACE TO A
 REGULAR SPACE; HOWEVER THE STRIPING AT THE PARKING
 SPACE WAS NOT CORRECTED TO MEET CODE REQUIREMENTS.
 E. PARKING SPACE #58, #95 AND #96 NO LONGER EXIST. DID
 THE SHIFT TO WHERE THE OLD SPACE #96 WAS? THE PAVEMENT
 MARKING IS UNCLEAR ON THE PLANS. NO DIMENSIONS FOR WHAT
 APPEAR TO BE THE NEW SPACES IS PROVIDED FOR STAFF TO
 VERIFY CODE COMPLIANCE, THIS INCLUDES THE AISLE WIDTH
 AT THIS LOCATION. NOTE: SHEET A-101A PARKING SPACE
 DEPTH DIFFERS FROM WHAT IS SHOWN ON SHEET A114.
  
 4) NEW COMMENT: PLEASE EXPLAIN WHY THE GRAND TOTAL GBA
 GROUND LEVEL AREA SHOWN ON SHEET A114 INCREASED FROM
 47,179 SF ON VERSION 2 OF THE PLANS TO 47,611 SF ON
 VERSION 3 OF THE PLANS. STAFF WAS NOT ABLE TO SEE ANY
 INCREASE IN THE BUILDING FOOTPRINT, NOR WAS CLOUDING
 USED TO HIGHLIGHT CHANGES.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]
  
  

Review Stop Z ZONING
Rev No 2 Status F Date 2019-03-13 Cont ID  
Sent By eschneid Date 2019-03-13 Time 16:49 Rev Time 6.00
Received By eschneid Date 2019-03-13 Time 09:03 Sent To  
Notes
2019-03-13 17:04:25FAILED
  
 PROVIDE WRITTEN RESPONSES TO COMMENTS.
  
 1) REPEAT COMMENT: SHEET G-3 SHOWS INCORRECT STRIPING.
 - THE "STANDARD ADA PARKING SPACE DESIGN" DETAIL WAS
 NOT CORRECTED TO REFLECT THE CITY REQUIREMENT OF 12
 INCHES BETWEEN THE STRIPES. THE OTHER DETAIL SHOW THIS
 CORRECTLY.
  
 2) A REVIEW OF THE FLOOR PLANS SHOWS MANY UNITS HAVING
 TWO KITCHENS. THE PRESENCE OF KITCHENS IS THE MAJOR
 FACTOR USED BY THE CITY TO DETERMINE UNIT COUNTS (THE
 REASON THE GUEST SUITES ARE NOT PERMITTED TO HAVE
 KITCHENS). PLEASE PROVIDE INFORMATION SO THAT THE CITY
 CAN BE ASSURED THAT THE UNITS WITH MULTIPLE KITCHENS
 WILL NOT BE USED FOR PURPOSES OTHER THAN SINGLE FAMILY
 OCCUPANCY.
  
 3) THE SHROUDS/HOODS FOR THE GARAGE VENTING/GENERATOR
 VENTING REQUIRE ZONING REVIEW AND APPROVAL.
  
 4) SEPARATE PERMIT REQUIRED FOR:
  
 A. LIGHTING
 B. FENCING, TO INCLUDE GUARD RAIL
 C. LANDSCAPE
 D. IRRIGATION
 E. HARDSCAPE
  
 5) PLEASE NOTE THAT THERE APPEAR BE AREAS WHERE THE
 GUARD RAIL SITS ON TOP OF THE RETAINING WALL AND WILL
 EXCEED THE SIX FOOT WALL HEIGHT ALLOWED AT THE PROPERTY
 LINE (NO WAIVER GRANTED BY THE CITY COMMISSION FOR
 THIS). STAFF IS UNSURE WHO THE GUARD RAIL SERVES AS
 EACH SIDE OF THE RETAINING WALL SEEMS TO HAVE ENOUGH
 HEIGHT TO KEEP SOMEONE FROM FALLING OFF EITHER SIDE.
 THIS WARRANTS FURTHER DISCUSSION.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]
  
  
  
  
  
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 2018-12-19 Cont ID  
Sent By eschneid Date 2018-12-19 Time 12:13 Rev Time 6.00
Received By eschneid Date 2018-12-12 Time 10:35 Sent To  
Notes
2018-12-19 12:32:38FAILED
  
 PROVIDE WRITTEN RESPONSES TO COMMENTS.
  
 1) SHEET A114 IS NOT THE LATEST PLAN APPROVED AS PART
 OF THE MINOR PD AMENDMENT.
  
 2) SHEET G-3 SHOWS INCORRECT STRIPING.
  
 3) SHEET G-7 SHOWS INCORRECT DATA.
  
 4) THESE ARE NOT THE LATEST CIVIL PLANS APPROVED AS
 PART OF THE MINOR PD AMENDMENT.
  
 5) SHEET A-101 IS NOT THE LATEST PLAN APPROVED AS PART
 OF THE MINOR PD AMENDMENT ? PARKING COUNT AND BICYCLE
 RACKS.
  
 6) SHEETS A-101A, A-102 AND A-102A SHOW A RETAINING
 WALL BLOCKING THE WESTERN PERIMETER SIDEWALK.
  
 5) SHEET A-101B IS NOT THE LATEST PLAN APPROVED AS PART
 OF THE MINOR PD AMENDMENT ? BICYCLE RACKS.
  
 6) ROOF SLAB ON SHEET A-110 SHOWS THE HEIGHT AT 302
 FEET 4 INCHES AS OPPOSED TO THE MINOR AMENDMENT
 APPROVED ROOF HEIGHT OF 301 FEET 10 INCHES AND THE
 HEIGHT SHOWN ON THE ELEVATION DRAWINGS SHEETS A-400
 THROUGH A-402 AND THE SECTION DRAWINGS. STAIR SECTION 3
 ON SHEET A-601 AND SECTION 2 ON SHEET A-609 ALSO SHOW
 ROOF HIGHER THAN 301 FEET 10 INCHES. SHEET A-610 SHOWS
 THE ELEVATOR CORE EXCEEDING THE 301 FEET 10 INCH
 HEIGHT. THE TRASH CUTES ON SHEET A-620 EXCEED THE 301
 FEET 10 INCH HEIGHT.
  
 7) THE NORTH ELEVATION ON THE PERMIT SET SHOWS THE
 MIDDLE OF THE BUILDING AS "STUCCO/PTD W/ SCORE LINES"
 WHILE THE APPROVED MINOR PD AMENDMENT PLANS SHOW THIS
 AREA AS ?MATTE ALUMINUM CLADDING?.
  
 8) THE EAST ELEVATION ON THE PERMIT SET SHOWS A
 "CONCRETE WALL" WHILE THE APPROVED PLANS SHOW THIS AREA
 AS "BEAUVAL FRENCH LIMESTONE".
  
 9) SHEET A-502, BUILDING SECTION, SHOWS A PORTION OF
 THE BUILDING EXTENDING ABOVE THE 307 FOOT MAXIMUM
 HEIGHT.
  
 10) SHEET A-801 DOES NOT SHOW THE FULL HEIGHT OF THE
 COOLING TOWERS SCREENED AS REQUIRED BY THE RPD
 REGULATIONS.
  
 11) SHEET M-101A SHOWS THE GARAGE VENTING/GENERATOR
 VENTING TOWARD THE RESIDENTIAL BUILDING TO THE SOUTH OF
 THE SITE. THIS IS NOT PERMITTED. VENTING MAY NOT BE
 DIRECTED TOWARD THE ADJACENT RESIDENTIAL PROPERTIES.
  
 12) SHOW A SECTION DRAWING TO VERIFY THAT THE ROOFTOP
 MECHANICAL EQUIPMENT DOES NOT EXCEED THE HEIGHT OF THE
 PARAPET.
  
 13) THE ABOVE GRADE PHOTOMETRIC PLANS NEED TO BE SHOWN
 TO THE PROPERTY LINE IN ACCORDANCE WITH THE CONDITIONS
 FROM THE APPROVED MINOR PD AMENDMENTS.
  
 14) PROVIDE VERIFICATION THAT THE GLASS AND STEEL ON
 ALL BUILDING FACADES IS TREATED IN SUCH A WAY TO
 MINIMIZE GLARE AND REFLECTION OF HIGH INTENSITY
 SUNLIGHT ONTO SURROUNDING PROPERTIES.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved