Plan Review Details - Permit 18081528
| Plan Review Stops For Permit 18081528 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
2 |
Status |
P |
Date |
2023-07-13 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2023-07-13 |
Time |
13:34 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2023-07-13 |
Time |
13:34 |
Sent To |
|
|
| Notes |
| 2023-07-13 13:34:43 | RECIEVED PRELIMINARY PCNS FROM PAPA UNITS UPDATED |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
F |
Date |
2023-02-21 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2023-02-21 |
Time |
15:05 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2023-02-21 |
Time |
15:04 |
Sent To |
|
|
| Notes |
| 2023-02-21 15:05:41 | PARCEL NEEDS TO BE UPDATED TO RETIRE THE 1515 S FLAGLER | | | DR ADDRESS AND TO ACTIVATE THE APARTMENT ADDRESSES. | | | PLEASE REACH OUT TO [email protected] OR CALL | | | 561-805-6659 TO DISCUSS THE ADDRESSING ISSUES. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2019-09-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-09-05 |
Time |
19:00 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-09-05 |
Time |
18:58 |
Sent To |
|
|
| Notes |
| 2022-02-17 17:59:17 | TOTAL CALCULATED ICC VALUATION IS $76,090,718.00. | | | | | | DECLARED VALUE = $91,000,000.00 | | | THE $3 MILLION FOUNDATION IS NOT INCLUDED IN THE $91 | | | MILLION. | | | | | | COSTS THAT WERE REMOVED FROM THE $91 MILLION. | | | GENERATOR - $300,000.00 | | | 2 POOLS - $500,000.00 | | | SITE WALLS -$150,000.00 | | | LANDSCAPE -$1.3 MILLION | | | IRRIGATION -$50,000.00 | | | CIVIL -$1.2 MILLION | | | FIRE SPRINKLER -$1.2 MILLION | | | FIRE ALARM -$200,000.00 | | | TOTAL DEDUCTIONS = $4.9 MILLION | | | | | | GRAND TOTAL = $91 MILLION - $4.9 MILLION = $86.1 | | | MILLION |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2019-07-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-07-05 |
Time |
14:43 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-06-27 |
Time |
18:40 |
Sent To |
|
|
| Notes |
| 2019-07-05 11:00:07 | REVIEW COMMENTS | | | | | | 3RD REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | WPB PERMIT: 18081528 | | | ADD: 1515 S. FLAGLER DRIVE | | | CONT: | | | TEL: | | | EMAIL: | | | | | | 1) ART IN PUBLIC PLACES - WILL COMPLY. | | | | | | 2) COMPLIED. | | | | | | 3) COMPLIED. | | | | | | 4) COMPLIED. | | | | | | 5) COMPLIED. | | | | | | 6) COMPLIED. | | | | | | 7) COMPLIED. | | | | | | 8) COMPLIED. | | | | | | 9) COMPLIED. | | | | | | 10) COMPLIED. | | | | | | 11) COMPLIED. | | | | | | 12) COMPLIED. | | | | | | 13) COMPLIED. | | | | | | 14) COMPLIED.. | | | | | | 15) COMPLIED. | | | | | | 16) COMPLIED. | | | | | | 17) COMPLIED. | | | | | | 18) COMPLIED. | | | | | | 19) COMPLIED. | | | | | | 20) COMPLIED. | | | | | | 21) COMPLIED. | | | | | | 22) COMPLIED. | | | | | | 23) COMPLIED. | | | | | | 24) COMPLIED. | | | | | | 25) COMPLIED. | | | | | | 26) COMPLIED. | | | | | | 27) COMPLIED. | | | | | | 28) COMPLIED. | | | | | | 29) COMPLIED. | | | | | | 30) COMPLIED. | | | | | | 31) COMPLIED. | | | | | | 32) COMPLIED. | | | | | | 33) COMPLIED. | | | | | | 34) COMPLIED. | | | | | | 35) COMPLIED. | | | | | | 36) COMPLIED. | | | | | | 37) COMPLIED. | | | | | | 38) COMPLIED. | | | | | | 39)COMPLIED. | | | | | | 40) NOT COMPLIED. SOME OF THE ITEMS THAT ARE LISTED AS | | | DEFERRED ON SHEET G-7 ARE REQUIRED TO HAVE SEPARATE | | | PERMITS, APPLICATIONS AND REVIEWS. SEPARATE PERMITS ARE | | | REQUIRED FOR GENERATORS, IRRIGATION, LANDSCAPE, POOLS | | | AND FENCES. THESE ITEMS REQUIRING SEPARATE PERMITS | | | SHOULD NOT BE LISTED AS DEFERRED (NO FEE) SUBMITTALS. | | | PROVIDE A LIST OF THE ITEMS THAT WILL BE DEFERRED ON | | | THE PLANS. FBC 107.3.4.1 DEFERRED SUBMITTALS. FOR THE | | | PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE | | | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT | | | SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE | | | TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A | | | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL | | | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE | | | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE | | | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | | | | 41) DEFERRED. W. P. B. 107.3.4.1 PRODUCT APPROVALS. | | | THOSE PRODUCTS WHICH ARE REGULATED BY THE DCA RULE | | | 9N-03 SHALL BE REVIEWED AND APPROVED IN WRITING BY THE | | | DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR | | | JURISDICTIONAL APPROVAL. FL 61G1-23.015 (2) THE | | | ARCHITECT IS RESPONSIBLE FOR SUPERVISING AND REVIEWING | | | ALL PROJECT DATA, REPORTS, SHOP DRAWINGS ETC. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | | OFFICIAL. | | | | | | 42) PARTIAL COMPLIANCE. THIS NOTE IS INCORRECTLY WORDED | | | AND NEEDS TO BE REVISED. FBC 1207.2 ADDRESSES | | | AIR-BOURNE SOUND THAT WHEN TESTED IN ACCORDANCE WITH | | | ASTM E90 IS REQUIRED TO HAVE A SOUND TRANSMISSION CLASS | | | (STC) OF NOT LESS THAN 50 OR NOT LESS THAN 45 IF TESTED | | | IN THE FIELD. FBC 1207.3 ADDRESSES STRUCTURE-BOURNE | | | SOUND THAT WHEN TESTED IN ACCORDANCE WITH ASTM E492 IS | | | REQUIRED TO HAVE AN IMPACT INSULATION CLASS (IIC) | | | RATING OF NOT LESS THAN 50 OR NOT LESS THAN 45 WHEN | | | TESTED IN THE FIELD. REVISE THE NOTE ON THE PLAN TO | | | INCLUDE ASTM E 492. SHOW COMPLIANCE WITH FBC 1207.2 FOR | | | AIR-BORNE SOUND TRANSMISSION AND FBC 1207.3 FOR | | | STRUCTURE BORNE SOUND INSULATION. | | | | | | 43) COMPLIED. | | | | | | 44) COMPLIED. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2019-03-08 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-03-08 |
Time |
18:36 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-02-11 |
Time |
16:09 |
Sent To |
|
|
| Notes |
| 2019-03-07 08:37:09 | REVIEW COMMENTS | | | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | WPB PERMIT: 18081528 | | | ADD: 1515 S. FLAGLER DRIVE | | | CONT: | | | TEL: | | | EMAIL: | | | | | | 1) ART IN PUBLIC PLACES - APPLICANT IS WORKING TO | | | ADDRESS. | | | | | | 2) PARTIAL COMPLIANCE. PLEASE CLARIFY THE COST | | | BREAKDOWN THAT WAS PROVIDED FOR THE ITEMS THAT WILL BE | | | PERMITED SEPARATELY AND ARE NOT INCLUDED IN THE | | | $91,000,000.00 VALUATION FOR THE BUILDING. | | | A) IS THE $3,000,000.00 FOR THE FOUNDATION PART OF THE | | | $91,000,000.00 FOR THE BUILDING? | | | B) DOES THE $ 0.6 MILLION FOR THE POOL INCLUDE THE COST | | | OF THE POOL LOCATED ON THE 25TH FLOOR? PLEASE PROVIDE | | | THE COSTS FOR EACH POOL. | | | C) THE SITE WALL, LANDSCAPE AND IRRIGATION WILL BE | | | THREE SEPARATE PERMITS. PLEASE DIVIDE THE $1.5 MILLION | | | TO SHOW THE COST OF EACH ONE INDIVIDUALLY. | | | D) SPECIFY THE COST OF THE GENERATOR. | | | | | | 3) PARTIAL COMPLIANCE. | | | A) SUBMIT A THRESHOLD INSPECTION PLAN. FBC (CITY | | | AMENDMENTS)110.8.1 THRESHOLD INSPECTION PLAN. THE | | | ENFORCING AGENCY SHALL REQUIRE A SPECIAL INSPECTOR TO | | | PERFORM STRUCTURAL INSPECTIONS ON A THRESHOLD BUILDING | | | PURSUANT TO A STRUCTURAL INSPECTION PLAN PREPARED BY | | | THE ENGINEER OF RECORD. THE STRUCTURAL INSPECTION PLAN | | | MUST BE SUBMITTED TO THE ENFORCING AGENCY PRIOR TO THE | | | ISSUANCE OF A BUILDING PERMIT FOR THE CONSTRUCTION OF A | | | THRESHOLD BUILDING. THE PURPOSE OF THE STRUCTURAL | | | INSPECTION PLAN IS TO PROVIDE SPECIFIC INSPECTION | | | PROCEDURES AND SCHEDULES SO THAT THE BUILDING CAN BE | | | ADEQUATELY INSPECTED FOR COMPLIANCE WITH THE PERMITTED | | | DOCUMENTS. THE SPECIAL INSPECTOR MAY NOT SERVE AS A | | | SURROGATE IN CARRYING OUT THE RESPONSIBILITIES OF THE | | | BUILDING OFFICIAL, THE ARCHITECT OR THE ENGINEER OF | | | RECORD. THE CONTRACTOR'S CONTRACTUAL OR STATUTORY | | | OBLIGATIONS ARE NOT RELIEVED BY ANY ACTION OF THE | | | SPECIAL INSPECTOR. | | | | | | B) COMPLIED. | | | | | | C) COMPLIED. | | | | | | D) COMPLIED. | | | | | | E) COMPLIED. | | | | | | F) NOTE: FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, | | | PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING | | | ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE | | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | | PLANS. | | | | | | G) WILL COMPLY. | | | | | | H) WILL COMPLY. | | | | | | I) COMPLIED. | | | | | | J) COMPLIED. | | | | | | 4) COMPLIED. | | | | | | 5) COMPLIED. | | | | | | 6) COMPLIED. | | | | | | 7) NOT COMPLIED. SOME OF THE PLANS HAVE A STATEMENT | | | THAT SAYS "PRELIMINARY NOT FOR CONSTRUCTION". SEE | | | SHEETS A111 THRU A115 & SHEETS 000.1 THRU 000.4. THE | | | SITE PLANS ARE REQUIRED MARKED FOR REFERENCE ONLY. ALL | | | PLANS AND CONSTRUCTION DOCUMENTS THAT ARE SUBMITTED FOR | | | PERMIT ARE REQUIRED TO BE SIGNED AND SEALED BY THE | | | ENGINEER OR ARCHITECT THAT PREPARED THEM. FS 471 & 481 | | | | | | 8) COMPLIED. | | | | | | 9) NOT COMPLIED. THERE ARE PLAN SHEETS LISTED IN THE | | | DRAWING INDEX THAT ARE NOT PROVIDED. COORDINATE THE | | | DRAWING INDEX ON SHEET G-1 WITH THE PLAN SHEETS THAT | | | ARE BEING UPLOADED. STRIKE OUT THE SHEETS THAT ARE NOT | | | UPLOADED. FBC 107.2.1 | | | | | | 10) COMPLIED. | | | | | | 11) COMPLIED. | | | | | | 12) COMPLIED. | | | | | | 13) COMPLIED. | | | | | | 14) COMPLIED.. | | | | | | 15) COMPLIED. | | | | | | 16) COMPLIED. | | | | | | 17) COMPLIED. | | | | | | 18) COMPLIED. | | | | | | 19) COMPLIED. | | | | | | 20) COMPLIED. | | | | | | 21) COMPLIED. | | | | | | 22) NOT COMPLIED. THIS DOOR IS SPECIFIED AS A 45 MIN. | | | FIRE RATED DOOR ON LS-5, HOWEVER, THE WALL IN WHICH IT | | | IS LOCATED IS SPECIFIED AS HAVING A TWO HOUR FIRE | | | RATING REQUIRING A 90 MIN FIRE RATED DOOR. ON SHEET | | | LS-5 THE FIRE RATING OF THE DOOR TO THE TRASH ROOM IS | | | NOT SPECIFIED.FBC 716.5.3 | | | | | | 23) COMPLIED. | | | | | | 24) COMPLIED. | | | | | | 25) PARTIALLY COMPLIED. THE DOORS TO ROOMS 305 AND 307 | | | ON SHEET LS-4 ARE SPECIFIED AS 45 MIN. FIRE RATED, | | | HOWEVER, THE WALLS THEY ARE LOCATED IN ARE SHOWN AS 2 | | | HOUR FIRE RATED (WHICH REQUIRE 90 MIN. FIRE RATED | | | DOORS). ALSO SEE SHEETS LS-5, LS-7, LS-8, LS-9. THE | | | FIRE RATING OF THE DOORS TO THE STORAGE ROOM AND THE | | | TRASH ROOM IN THE 2 HOUR FIRE RATED WALLS ARE NOT | | | SPECIFIED. FBC 107.2.1 | | | | | | 26) COMPLIED. | | | | | | 27) NOT COMPLIED. THIS DOOR IS LISTED AS A 45 MIN. FIRE | | | RATED DOOR IN THE DOOR SCHEDULE. THE WALL THAT IT IS IN | | | IS SHOWN AS A 2 HR. FIRE RATED WALL, WHICH REQUIRES A | | | 90 MIN. FIRE RATED DOOR. SHOULD THIS WALL HAVE A 1 HR | | | FIRE RATING? DOOR 2504A IN THE 2 HOUR FIRE RATED WALL | | | AND IS REQUIRED TO BE 90 MINUTE FIRE RATES IS NOT | | | LISTED IN THE DOOR SCHEDULE. FBC 107.2.1 | | | | | | 28) COMPLIED. | | | | | | 29) COMPLIED. | | | | | | 30) COMPLIED. | | | | | | 31) COMPLIED. | | | | | | 32) COMPLIED. | | | | | | 33) COMPLIED. | | | | | | 34) COMPLIED. | | | | | | 35) COMPLIED. | | | | | | 36) COMPLIED. | | | | | | 37) COMPLIED. | | | | | | 38) COMPLIED. | | | | | | 39)COMPLIED. | | | | | | 40) NOT COMPLIED. PROVIDE A LIST OF THE ITEMS THAT WILL | | | BE DEFERRED ON THE PLANS. FBC 107.3.4.1 DEFERRED | | | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED | | | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN | | | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION | | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL | | | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING | | | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS | | | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE | | | BUILDING OFFICIAL. | | | | | | 41) W. P. B. 107.3.4.1 PRODUCT APPROVALS. THOSE | | | PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03 | | | SHALL BE REVIEWED AND APPROVED IN WRITING BY THE | | | DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR | | | JURISDICTIONAL APPROVAL. FL 61G1-23.015 (2) THE | | | ARCHITECT IS RESPONSIBLE FOR SUPERVISING AND REVIEWING | | | ALL PROJECT DATA, REPORTS, SHOP DRAWINGS ETC. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | | OFFICIAL. | | | | | | 42) PARTIAL COMPLIANCE. REVISE THE NOTE ON THE PLAN TO | | | INCLUDE ASTM E 492. SHOW COMPLIANCE WITH FBC 1207.2 FOR | | | AIR-BORNE SOUND TRANSMISSION AND FBC 1207.3 FOR | | | STRUCTURE BORNE SOUND INSULATION. | | | | | | 43) NEW COMMENT. ON SHEET A-107 THE UNIT H BALCONY | | | APPEARS TO SLOPE TOWARDS THE BUILDING. FBC 107.2.1 | | | | | | 44) NEW COMMENT. ON SHEET A-901, PARTITION TYPE P/8 HAS | | | 2 LAYERS OF 5/8" TYPE X GWB ON EACH SIDE OF THE 6" | | | METAL FRAME WALL. THIS WALL WILL HAVE A 2 HR FIRE | | | RATING AND THE DETAIL SPECIFIES IT AS 1 HR. FBC 107.2.1 | | | | | | FYI - THE NUMBERING OF THE ITEMS ON YOUR RESPONSE | | | LETTER ARE INCORRECT. THERE ARE TWO ITEM NUMBER 2S | | | WHICH CAUSED ALL COMMENTS AFTER NUMBER 2 TO BE | | | MISNUMBERED. | | | NOTE: ADDITIONAL COMMENTS MAY RESULT FROM THE RESPONSES | | | TO THESE COMMENTS. WHEN RESUBMITTING, IT IS HELPFUL TO | | | PROVIDE A RESPONSE LETTER ADDRESSING EACH ITEM ALONG | | | WITH THE CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE | | | INSERT CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-12-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-12-07 |
Time |
08:41 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-11-27 |
Time |
08:19 |
Sent To |
|
|
| Notes |
| 2018-11-15 17:45:15 | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | WPB PERMIT: 18081528 | | | ADD: 1515 S. FLAGLER DRIVE | | | CONT: | | | TEL: | | | EMAIL: | | | | | | 1) ART IN PUBLIC PLACES | | | THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES | | | ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR | | | NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT | | | APPLICATION WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL | | | PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | | $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE. | | | PER CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND | | | CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V, | | | ART IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION | | | 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL | | | PROJECT CONSTRUCTION COST. | | | PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE | | | V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND | | | NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO | | | THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE | | | PROJECTS. | | | SEC. 78-129. - PUBLIC ART ASSESSMENT FOR PRIVATE | | | DEVELOPMENT. | | | (A) APPLICABILITY. THE PROVISIONS OF THIS ARTICLE AND | | | THE PUBLIC ART ASSESSMENT SECTION SHALL APPLY TO ALL | | | PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW | | | CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN | | | EXISTING BUILDING, WHERE TOTAL CONSTRUCTION COSTS ARE | | | EQUAL TO OR GREATER THAN $750,000.00. ALL BUILDINGS | | | WITHIN NEW PLANNED DEVELOPMENTS SHALL BE ASSESSED | | | CUMULATIVELY TOWARDS THIS ART IN PUBLIC PLACES | | | REQUIREMENT, EVEN IF THE BUILDINGS ARE PERMITTED | | | SEPARATELY OR DEVELOPED IN PHASES. THE PROVISIONS OF | | | THIS SECTION APPLY TO NEW DEVELOPMENT OR NEW | | | CONSTRUCTION WITHIN EXISTING PLANNED DEVELOPMENTS. | | | FOR CONTACT INFORMATION PLEASE CONTACT: | | | MS. SYBILLE WELTER ART IN PUBLIC PLACES COORDINATOR | | | 822-1515 E-MAIL: [email protected] | | | | | | 2) 109.3 BUILDING PERMIT VALUATION. | | | IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE | | | CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE, | | | ELECTRICAL, GAS, MECHANICAL, OR PLUMBING SYSTEMS | | | APPEARS TO BE UNDER ESTIMATED ON THE APPLICATION, THE | | | PERMIT SHALL BE DENIED. FOR PERMITTING PURPOSES, | | | VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL | | | REPLACEMENT PURPOSES, VALUATION OF BUILDINGS AND | | | SYSTEMS SHALL BE THE TOTAL REPLACEMENT VALUE TO INCLUDE | | | STRUCTURAL, ELECTRICAL, PLUMBING, MECHANICAL, INTERIOR | | | FINISHES, NORMAL SITE WORK (EXCAVATION AND BACKFILL FOR | | | BUILDINGS), ARCHITECTURAL AND DESIGN FEES, MARKETING | | | COST, OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. | | | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED | | | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES | | | (MARSHALL-SWIFT, MEANS, ETC.) WITH REGIONAL ADJUSTMENTS | | | FOR LOCATION AS PUBLISHED BY THE INTERNATIONAL CODE | | | CONGRESS. | | | THIS MAIN BUILDING PERMIT WILL INCLUDE THE FEES FOR THE | | | MECHANICAL, ELECTRICAL, PLUMBING & ROOFING PERMITS. | | | WHEN THE GENERAL CONTRACTOR COMES IN FOR A BUILDING | | | PERMIT WITH THE SIGNED PERMIT APPLICATION FORM BY THE | | | QUALIFIER AND OWNER AND BRINGS IN THE LISTED | | | SUB-PERMITS M-E-P & ROOFING PERMITS SIGNED BY THE | | | QUALIFIER OF EACH COMPANY, THEIR INSURANCES AND | | | LICENSURE UP TO DATE, THE M-E-P AND ROOFING PERMITS ARE | | | FREE OF CHARGE. IF THE M-E-P & ROOFING PERMITS COME IN | | | LATER THERE WILL BE AN $80.00 ADMINISTRATIVE FEE FOR | | | EACH PERMIT. | | | ALL OTHER PERMITS FIRE SPRINKLER, FIRE ALARM, RACK | | | STORAGE, EXHAUST HOODS, ANSUL SYSTEMS OR ALTERNATIVE | | | AUTOMATIC FIRE-EXTINGUISHING SYSTEMS, WALK IN COOLERS & | | | FREEZERS, ALL LOW VOLTAGE PERMITS, GENERATORS & FUEL | | | TANKS, GAS PERMIT, POOL, JACUZZI AND ASSOCIATED | | | SUB-PERMITS, AWNING, SCREEN ENCLOSURES, CANOPY, FENCE, | | | LANDSCAPE, IRRIGATION, AUGER CAST PILE AND OR | | | FOUNDATION OR STRUCTURE ONLY PERMIT WILL BE SEPARATE | | | REVIEWS AND ASSOCIATED FEES WITH EACH PERMIT. | | | PLEASE PROVIDE AN ITEMIZED LIST AND SUBTRACT THESE LINE | | | ITEMS AND THEIR VALUE FROM THE OVERALL BUILDING VALUE | | | STATED ON THE PERMIT APPLICATION FOR THIS PROJECT. THE | | | REMAINING BALANCE WILL BE AFFECTIVELY THE VALUE OF THE | | | BUILDING YOU WILL BE PAYING FOR THIS PERMIT. THE | | | BUILDING DEPARTMENT DOES NOT WANT TO COLLECT TWICE FOR | | | THE VALUE OF THESE SUB-PERMITS NOT COVERED UNDER THE | | | PRIME OR MASTER PERMIT. | | | | | | 3) THIS PROJECT IS A THRESHOLD BUILDING / FL S. S. | | | 553.71(7) "THRESHOLD BUILDING" MEANING ANY BUILDING | | | WHICH IS GREATER THAN (3) STORIES OR 50 FT. IN HEIGHT, | | | OR WHICH HAS AN ASSEMBLY OCCUPANCY CLASSIFICATION AS | | | DENIED IN THE FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 | | | SQ. FT. IN AREA AND AN OCCUPANT CONTENT OF GREATER THAN | | | 500 PERSONS. | | | | | | A) FBC (CITY AMENDMENTS)110.8.1 THRESHOLD INSPECTION | | | PLAN. THE ENFORCING AGENCY SHALL REQUIRE A SPECIAL | | | INSPECTOR TO PERFORM STRUCTURAL INSPECTIONS ON A | | | THRESHOLD BUILDING PURSUANT TO A STRUCTURAL INSPECTION | | | PLAN PREPARED BY THE ENGINEER OF RECORD. THE STRUCTURAL | | | INSPECTION PLAN MUST BE SUBMITTED TO THE ENFORCING | | | AGENCY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR | | | THE CONSTRUCTION OF A THRESHOLD BUILDING. THE PURPOSE | | | OF THE STRUCTURAL INSPECTION PLAN IS TO PROVIDE | | | SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO THAT | | | THE BUILDING CAN BE ADEQUATELY INSPECTED FOR COMPLIANCE | | | WITH THE PERMITTED DOCUMENTS. THE SPECIAL INSPECTOR MAY | | | NOT SERVE AS A SURROGATE IN CARRYING OUT THE | | | RESPONSIBILITIES OF THE BUILDING OFFICIAL, THE | | | ARCHITECT OR THE ENGINEER OF RECORD. THE CONTRACTOR'S | | | CONTRACTUAL OR STATUTORY OBLIGATIONS ARE NOT RELIEVED | | | BY ANY ACTION OF THE SPECIAL INSPECTOR. | | | | | | B) THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B. | | | CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD | | | BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5) | | | FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY | | | THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED | | | TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED | | | AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED | | | BEFORE PERMIT ISSUANCE WILL TAKE PLACE. | | | | | | C) THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT | | | 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED | | | TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF | | | RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE | | | ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND | | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | | BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS | | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | | THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. | | | | | | D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME OF | | | INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE RESUME | | | MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED | | | HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE WILL | | | REVIEW THE RESUME. AFTER THE RESUME IS REVIEWED, AN | | | INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | | MEETING THE ABOVE CRITERIA. | | | | | | E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY | | | FOR THIS TYPE OF CONSTRUCTION. | | | | | | F) NOTE: FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, | | | PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING | | | ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE | | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | | COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR | | | THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE | | | IN BLACK & WHITE. | | | | | | G) 110.8.4.3 ALL SHORING AND RESHORING PROCEDURES, | | | PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT | | | AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING | | | INSTALLATION SHALL BE SUPERVISED, INSPECTED AND | | | CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING | | | DOCUMENTS BY THE CONTRACTOR. | | | | | | H) PLEASE CALL THE CITY OF WEST PALM BEACH'S AUTOMATED | | | TELEPHONE INSPECTIONS LINE (561) 805-6700 FOR ALL | | | BUILDING INSPECTIONS FOR AUDITING OF JOBSITE | | | INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6 | | | MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY. | | | | | | I) 110.8 THRESHOLD BUILDINGS, OPERATING GUIDELINES FOR | | | THRESHOLD INSPECTORS #25. ASSURE THAT THE DESIGNER HAS | | | REQUIRED ON THE PLANS OR SPECIFICATIONS ONE MATERIAL, | | | APPROVED FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND | | | CEILINGS. | | | | | | J) PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL | | | BE HAPPY TO SEND YOU A COPY OF THE OCTOBER 2018 | | | GUIDELINES AND POLICIES FOR PROJECTS CONCERNING | | | THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS. | | | | | | 4) THIS PROJECT ISLOCATED IN A SPECIAL FLOOD HAZARD | | | AREA (AE). SUBMIT A COPY OF THE LOMR FROM FEMA THAT IS | | | MENTIONED IN YOUR RESPONSE. RESIDENTIAL BUILDINGS | | | LOCATED IN A SPECIAL FLOOD HAZARD AREA ARE NOT ALLOWED | | | TO HAVE BASEMENTS BELOW THE BFE. THE PROPOSED STRUCTURE | | | IS LOCATED IN FLOOD ZONE AE WITH BASE FLOOD ELEVATIONS | | | 6 AND 7 NAVD 88. ACCORDING TO CITY ORDINANCE 4729-17 | | | SEC. 18-34 THE FINISH FLOOR ELEVATION NEEDS TO BE TWO | | | FEET (FREEBOARD) ABOVE THE BASE FLOOD ELEVATION. | | | BASEMENT FLOOR NEEDS TO BE RAISED. | | | NOTE: ELEVATION CERTIFICATES ARE REQUIRED. INCLUDING | | | CONSTRUCTION DRAWINGS, DURING CONSTRUCTION AND FINAL. | | | | | | 5) THE CURRENT FLOOD MAPS WERE ADOPTED BY THE CITY OF | | | WEST PALM BEACH ON OCTOBER 5, 2017. THE ELEVATIONS ON | | | THE ADOPTED MAPS ARE IN NAVD 88. TO AVOID CONFUSION | | | PLEASE SPECIFY ALL ELEVATIONS ON THE PLANS USING NAVD | | | 88. FBC 107.2.1 | | | | | | 6) CLARIFY THE FLOOD PANELS AT THE SERVICE WING THAT | | | ARE SHOWN ON SHEET A-803A. DRY FLOOD PROOFING IS NOT | | | ALLOWED BY FEMA FOR RESIDENTIAL OCCUPANCIES. | | | | | | 7) THE SITE PLANS ARE REQUIRED MARKED FOR REFERENCE | | | ONLY. ALL PLANS AND CONSTRUCTION DOCUMENTS THAT ARE | | | SUBMITTED FOR PERMIT ARE REQUIRED TO BE SIGNED AND | | | SEALED BY THE ENGINEER OR ARCHITECT THAT PREPARED THEM. | | | FS 471 & 481 | | | | | | 8)FBC 110.8.4.4 REQUIRES ALL PLANS FOR THRESHOLD | | | BUILDINGS WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY | | | THE ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT | | | THAT, TO THE BEST OF THE | | | ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND | | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | | BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS | | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | | THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. THE | | | STRUCTURAL PLANS STATE THIS IN THE TITLE BLOCK. I DID | | | NOT SEE IT ON THE ARCHITECTURAL PLANS. | | | | | | 9) COORDINATE THE DRAWING INDEX ON SHEET G-1 WITH THE | | | PLAN SHEETS THAT ARE BEING UPLOADED. STRIKE OUT THE | | | SHEETS THAT ARE NOT UPLOADED. FBC 107.2.1 SOME OF THE | | | SHEETS ARE MISSING AND OTHERS SUCH AS A-110 AND A-125 | | | ARE DUPLICATED. | | | | | | 10) SOME OF THE CODE SECTIONS THAT ARE SPECIFIED UNDER | | | CODE NOTES ON SHEET G-2 ARE INCORRECT. PLEASE REVIEW | | | AND CORRECT THEM. FBC 107.2.1 | | | | | | 11) CODE NOTE #26 ON SHEET G-2 SPECIFIES THE FLORIDA | | | ASSEMBLY CODE 2012. IS THIS MEANT TO BE THE FLORIDA | | | ACCESSIBILTY CODE? IF SO IT WILL BE THE 2017 EDITION. | | | | | | 12) PLEASE CLARIFY WHICH AREAS OF THIS BUILDING WILL BE | | | SUBJECT TO THE FLORIDA ACCESSIBILITY CODE AND WHAT | | | AREAS ARE REQUIRED TO COMPLY WITH THE FEDERAL FAIR | | | HOUSING ACT. FBC 107.2.1 | | | | | | 13) PLEASE PROVIDE ADDITIONAL ELEVATIONS FOR THE AREAS | | | AROUND THE AMENITY LEVEL POOL AND SHOW THE ACCESIBLE | | | ROUTES TO AND AROUND THE POOL. SHOW COMPLIANT RAMPS, | | | LIFTS, ETC. 2017 FBC ACCESSIBILITY 402 / FAIR HOUSING | | | GUIDELINES REQUIREMENT 2. | | | | | | 14) THE ENTRY LOBBY RAMP DETAILS 1A AND 1B ON SHEET | | | A-606 IS MISSING THE INFORMATION REQUIRED TO SHOW | | | COMPLIANCE WITH FBC 1012 OR FBC ACCESSIBILITY 405. | | | | | | 15) THE ENTRY LOBBY STAIR PLANS AND SECTIONS ON A-606 | | | ARE NOT CLEAR, ARE MISSING INFORMATION SUCH AS THE | | | NUMBER OF RISERS AND RISER HEIGHT. CLARIFY THE CURVED | | | HANDRAIL AND RADIUS. | | | | | | 16) SPECIFY THE LOCATION OF THE PENTHOUSE POOL | | | EQUIPMENT AND INDICATE HOW IT WILL BE ACCESSED. FBC | | | 107.2.1 | | | | | | 17) THE POOL EQUIPMENT ROOM 117, ON THE GROUND LEVEL IS | | | SPECIFIED WITH A 2 HOUR FIRE RATED WALL, HOWEVER, IT | | | DOES NOT HAVE AN ID TAG TIED TO A SPECIFIC WALL TYPE. | | | FBC 107.2.1 | | | | | | 18) THE DOOR TO POOL EQUIPMENT ROOM 117 IS LOCATED IN A | | | 2 HOUR FIRE RATED WALL AND IS REQUIRED TO HAVE A 90 | | | MINUTE FIRE RATING. THIS IS NOT SPECIFIED. FBC 716.5.3 | | | | | | 19) ON SHEET LS-1 THE FSA ELEVATOR LOBBY HAS A 1 HOUR | | | FIRE RATED WALL WITH A 60 MINUTE FIRE RATED DOUBLE DOOR | | | AND THE DOOR FROM THE LOBBY TO THE 2 HOUR FIRE RATED | | | EXIT ACCESS PASSAGE WAY DOES NOT HAVE A RATING | | | SPECIFIED. EITHER THIS DOOR HAS TO HAVE A 90 MINUTE | | | FIRE RATING OR THE DOUBLE DOOR HAS TO BE FIRE RATED FOR | | | 90 MIN. AND BE IN A TWO HOUR FIRE RATED WALL. FBC FBC | | | TABLE 716.5 | | | | | | 20) ON SHEET LS-1 THE FIRE RATING OF THE DOOR FROM THE | | | PARKING GARAGE TO THE 2 HOUR FIRE RATED PASSAGE WAY IS | | | NOT SPECIFIED. FBC 716.5.3 | | | | | | 21) ON SHEET LS-1 THE FIRE RATING OF THE DOORS FROM THE | | | PARKING GARAGE TO EXIT STAIR 3 ARE NOT SPECIFIED. FBC | | | 716.5.3 | | | | | | 22) ON SHEET LS-5 THE FIRE RATING OF THE DOOR TO THE | | | TRASH ROOM IS NOT SPECIFIED.FBC 716.5.3 | | | | | | 23) THE DOOR TO THE STAFF ROOM ON LEVEL 3 IS NOT TAGGED | | | OR IDENTIFIED ON THE LIFE SAFTEY OR ARCHITECTURAL PLAN | | | SHEETS. FBC 107.2.1 | | | | | | 24) SHEET 151. A-103 MULTIPURPOSE ROOM 327 HAS DOORS IN | | | THE 1 HOUR RATED CORRIDOR WALLS THAT ARE NOT IDENTIFIED | | | ON THE LIFE SAFTEY OR ARCHITECTURAL PLAN SHEETS. FBC | | | 107.2.1 | | | | | | 25) THE FIRE RATING OF THE DOORS TO THE STORAGE ROOM | | | AND THE TRASH ROOM IN THE 2 HOUR FIRE RATED WALLS ARE | | | NOT SPECIFIED. FBC 107.2.1 | | | | | | 26) DOORS 2503 AND 2504 ARE LOCATED IN 2 HOUR FIRE | | | RATED WALLS AND ARE SPECIFIED ON THE SCHEDULE AS 45 | | | MINUTE RATHER THAN 90 MINUTE FIRE RATED DOORS. FBC | | | 716.5.3 | | | | | | 27) DOOR 2504A IN THE 2 HOUR FIRE RATED WALL AND IS | | | REQUIRED TO BE 90 MINUTE FIRE RATES IS NOT LISTED IN | | | THE DOOR SCHEDULE. FBC 107.2.1 | | | | | | 28) ON SHEET LS-4 FOR LEVEL 3 THE IDENTIFICATION LINE | | | FOR THE 1 HOUR FIRE RATED WALL IS SHOWN CROSSING THE | | | OPENING TO THE LOUNGE/BAR AREA. IT APPEARS THAT A ONE | | | HOUR FIRE RATED WALL AND 45 MINUTE RATED DOOR IS | | | REQUIRED HERE. FBC TABLE 716.5 | | | | | | 29) THE CORRIDOR WALL TYPES ARE NOT IDENTIFIED WITH A | | | CORRESPONDING TAG ON THE PLANS. FBC 107.2.1 | | | | | | 30) THE 2 HOUR FIRE RATED WALL TYPE IS NOT IDENTIFIED | | | FOR THE WALLS AT THE FACE OF THE ELEVATORS. FBC 107.2.1 | | | | | | 31) THE 2 HOUR FIRE WALL IDENTIFICATION LINES ARE OUT | | | OF PLACE AT THE ELEVATOR LOBBY ON SHEET LS-9. FBC | | | 107.2.1 | | | | | | 32) ON SHEET LS-6 THE 1 HOUR WALL IDENTIFICATION LINE | | | IS MISTAKENLY INDICATED IN SIDE OF UNIT F. FBC 107.2.1 | | | | | | 33) ON SHEET A-901 DETAIL P/11 FOR THE 2 HOUR CMU WALL | | | IN ORDER TO ACHIEVE A 2 HOUR FIRE RATING CLASSIFICATION | | | D-2 CONCRETE BLOCK IS REQUIRED. FBC TABLE 721.1(2) | | | | | | 34) SHOW COMPLIANCE WITH FBC ACCESSIBILITY CODE 209.2.1 | | | PASSENGER LOADING ZONES.PASSENGER LOADING ZONES, EXCEPT | | | THOSE REQUIRED TO COMPLY WITH 209.2.2 AND 209.2.3, | | | SHALL PROVIDE AT LEAST ONE PASSENGER LOADING ZONE | | | COMPLYING WITH 503 IN EVERY CONTINUOUS 100 LINEAR FEET | | | (30 M) OF LOADING ZONE SPACE, OR FRACTION THEREOF. | | | | | | 35) SHOW COMPLIANCE WITH FBC ACCESSIBILITY CODE 209.4 | | | VALET PARKING.PARKING FACILITIES THAT PROVIDE VALET | | | PARKING SERVICES SHALL PROVIDE AT LEAST ONE PASSENGER | | | LOADING ZONE COMPLYING WITH 503. | | | | | | 36) THE GRAB BAR REINFORCING AT THE BACK OF THE TOILET | | | IS REQUIRED TO BE A MINIMUM OF 12" (1 FOOT) ON EACH | | | SIDE OF THE TOILET CENTER LINE PER FAIR HOUSING | | | GUIDELINES REQUIREMENT 6. PLEASE REVISE THE DETAIL ON | | | SHEET G-5. | | | | | | 37) IDENTIFY THE TWO REQUIRED FIRE SERVICE ACCESS | | | ELEVATORS ON THE PLANS AND SHOW THAT THEY COMPLY WITH | | | THE REQUIREMENTS OF FBC 403.6.1 AND 3007.1. | | | | | | 38) SHOW COMPLIANCE WITH FBC 3007.3 WATER PROTECTION. | | | AN APPROVED METHOD TO PREVENT WATER FROM INFILTRATING | | | INTO THE HOISTWAY ENCLOSURE FROM THE OPERATION OF THE | | | AUTOMATIC SPRINKLER SYSTEM OUTSIDE THE ENCLOSED FIRE | | | SERVICE ACCESS ELEVATOR LOBBY SHALL BE PROVIDED. | | | | | | 39) IDENTIFY THE REQUIRED ELEVATOR CAR TO ACCOMMODATE | | | AMBULANCE STRETCHER AND SHOW THAT IT COMPLIES WITH FBC | | | 3002.4. ANY BUILDING THAT IS MORE THAN THREE STORIES | | | HIGH OR IN WHICH THE VERTICAL DISTANCE BETWEEN THE | | | BOTTOM TERMINAL LANDING AND THE TOP TERMINAL LANDING | | | EXCEEDS 25 FEET (7620 MM), MUST BE CONSTRUCTED TO | | | CONTAIN AT LEAST ONE PASSENGER ELEVATOR THAT IS | | | OPERATIONAL FOR BUILDING OCCUPANTS AND FIRE DEPARTMENT | | | EMERGENCY ACCESS TO ALL FLOORS. THE ELEVATOR CAR SHALL | | | BE OF SUCH A SIZE AND ARRANGEMENT TO ACCOMMODATE AN | | | AMBULANCE STRETCHER 24 INCHES BY 76 INCHES (610 MM BY | | | 1950 MM) WITH NOT LESS THAN 5-INCH (127 MM) RADIUS | | | CORNERS, IN THE HORIZONTAL, OPEN POSITION AND SHALL BE | | | IDENTIFIED BY THE INTERNATIONAL SYMBOL FOR EMERGENCY | | | MEDICAL SERVICES (STAR OF LIFE). THE SYMBOL SHALL BE | | | NOT LESS THAN 3 INCHES (76 MM) IN HEIGHT AND SHALL BE | | | PLACED INSIDE ON BOTH SIDES OF THE HOISTWAY DOOR FRAME. | | | | | | 40) FBC 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES | | | OF THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS | | | THOSE PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT | | | THE TIME OF THE APPLICATION AND THAT ARE TO BE | | | SUBMITTED TO THE BUILDING OFFICIAL WITHIN A SPECIFIED | | | PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE | | | PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED | | | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST | | | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS | | | FOR REVIEW BY THE BUILDING OFFICIAL. | | | | | | 41) W. P. B. 107.3.4.1 PRODUCT APPROVALS. THOSE | | | PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03 | | | SHALL BE REVIEWED AND APPROVED IN WRITING BY THE | | | DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR | | | JURISDICTIONAL APPROVAL. FL 61G1-23.015 (2) THE | | | ARCHITECT IS RESPONSIBLE FOR SUPERVISING AND REVIEWING | | | ALL PROJECT DATA, REPORTS, SHOP DRAWINGS ETC.. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | | OFFICIAL. | | | | | | 42) SHOW COMPLIANCE WITH FBC 1207.2 FOR AIR-BORNE SOUND | | | TRANSMISSION AND FBC 1207.3 FOR STRUCTURE BORNE SOUND | | | INSULATION. | | | | | | NOTE: ADDITIONAL COMMENTS MAY RESULT FROM THE RESPONSES | | | TO THESE COMMENTS. WHEN RESUBMITTING, IT IS HELPFUL TO | | | PROVIDE A RESPONSE LETTER ADDRESSING EACH ITEM ALONG | | | WITH THE CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE | | | INSERT CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS. | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2019-08-19 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-08-19 |
Time |
15:30 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-08-16 |
Time |
13:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
F |
Date |
2019-06-10 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-06-10 |
Time |
15:30 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-06-04 |
Time |
13:28 |
Sent To |
|
|
| Notes |
| 2019-06-05 10:05:25 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | ELECTRICAL REVIEW STATUS: 3RD REVIEW, DENIED, SEE | | | COMMENTS BELOW. | | | | | | BE ADVISED THAT THERE IS SO MUCH CONFLICTING AND | | | INCOMPLETE INFORMATION ON THIS SUBMISSION THAT A FULL | | | REVIEW WILL BE REQUIRED FOR THE NEXT REVIEW, LIKELY | | | RESULTING IN FURTHER COMMENTS. | | | | | | PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED | | | SATISFACTORILY HAVE BEEN REMOVED. PREVIOUS COMMENTS | | | THAT HAVE NOT BEEN ADDRESSED SATISFACTORILY HAVE | | | ADDITIONAL COMMENTS IN PARENTHESES. ANY NEW COMMENTS | | | WILL BE LISTED AFTER PREVIOUS COMMENTS. | | | | | | | | | 14. SHEET E-102B, CIRCUIT AL-17 IS SHOWN FEEDING THE | | | TRATAM ROOM. WHAT IS THIS ROOM USED FOR, IS GFCI | | | PROTECTION REQUIRED. PROVIDE CLARIFICATION AND/OR | | | CORRECTION. NEC 210.8; WPB FBC 107.2.1 (RESPONSE | | | RECEIVED STATES THAT GFCI PROTECTION IS NOT REQUIRED. I | | | DISAGREE, SEE CODE SECTION STATED AT THE END OF THIS | | | COMMENT. LOCKER ROOMS REQUIRE GFCI PROTECTION. PROVIDE | | | CORRECTION. NEC 210.8(B)(7) ) | | | 84. LIGHTING SHEETS (ALL) DO NOT SHOW THE AUTOMATIC | | | CONTROL REQUIRED. PROVIDE THE ADDITIONAL AUTOMATIC | | | LIGHTING CONTROLS STIPULATED IN THE FBC ENERGY CODE. | | | FBC EC C405.2 (RESPONSE LETTER STATES THIS IS PROVIDED, | | | BUT IT HAS NOT BEEN PROVIDED. NONE OF THE INTERIOR | | | SPACES I CHECHED SHOW THE AUTOMATIC CONTROL REQUIRED. | | | PROVIDE CORRECTION.) | | | 85. PROVIDE GRAPH/CALCULATION OF EXTERIOR LIGHTING | | | POWER ALLOWANCES PER THE FBC ENERGY CONSERVATION IN | | | RELATION TO THE CONNECTED EXTERIOR LIGHTING PROPOSED TO | | | COMPLY WITH CODE. FBC EC C405.5.1 (NOT SURE WHICH CODE | | | BOOK YOU ARE LOOKING IN, BUT C405.6.2 AS MENTIONED IN | | | YOUR RESPONSE IS NOT THE SECTION FROM THE CURRENT CODE | | | THAT REQUIRES EXTERIOR LIGHTING COMPLIANCE. PROVIDE AS | | | PREVIOUSLY REQUESTED.) | | | 97. ON RISER DIAGRAM PANEL EQEH IS SHOWN AS A 1200 AMP | | | PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS | | | SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 (STILL NOT CORRECTED. E-502 AND E-602 SHOW EQEH | | | AS AN 800 AMP PANEL. LOAD CALCULATION ON E-601A STATES | | | THIS IS A 1200 AMP PANEL WITH A LOAD OF 963 AMPS. | | | PROVIDE CORRECTION.) | | | 102. AS ADJUSTMENTS ARE MADE TO DISCREPANCIES IN PLAN, | | | PROVIDE UPDATED LOAD CALCULATION FOR EACH PANEL AND | | | SERVICE. NEC 220 (LOAD CALCULATION STILL NOT CORRECT OR | | | COMPLETE, SEE NEW COMMENTS BELOW.) | | | 103. SHEET E-601A, LOADS LISTED FOR LOAD CALCULATION | | | SHOWN ARE MUCH DIFFERENT THAN THE LOADS SHOWN IN THE | | | CORRESPONDING PANEL SCHEDULES. PROVIDE CLARIFICATION | | | AND CORRECTION. WPB FBC 107.2.1; NEC 220 (THIS COMMENT | | | NOT ADDRESSED SATISFACTORILY, SEE NEW COMMENTS.) | | | 107. LOAD FOR PANEL H SHOWN IN PANEL SCHEDULE FOR PANEL | | | MDP1 IS MUCH DIFFERENT THAN THE LOAD SHOWN IN THE PANEL | | | SCHEDULE FOR PANEL H. PROVIDE CORRECTION. WPB FBC | | | 107.2.1; NEC 220 (NOT CORRECTED, SEE NEW COMMENTS FOR | | | FURTHER EXPLANATION.) | | | 111. PROVIDE PANEL SCHEDULE FOR ALL PANELS. SOME ARE | | | MISSING, SUCH AS RDEH AND RH. WPB FBC 107.2.1; NEC | | | 408.4 (NOT ALL PANEL SCHEDULES PROVIDED.) | | | | | | NEW COMMENTS: | | | | | | 114. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD FOR | | | EQEH IS SHOWN IN ON E-601A AS 963 AMPS. PANEL SCHEDULE | | | FOR EM ON SHEET E-602 SHOWS THIS IS BEING FED FROM AN | | | 800 AMP BREAKER WITH THREE SETS OF 400 KCMIL AL WIRE, | | | WHICH IS RATED FOR 810 AMPS. PROVIDE CORRECTION. NEC | | | 215.2, 408.30, 408.36 | | | 115. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD | | | CALCULATION ON SHEET E-601A SHOWS A LOAD OF 1451 AMPS | | | FOR PANEL EM. SHEET E-602 SHOWS A LOAD OF 557 AMPS FOR | | | THE SAME PANEL. CORRECT DISCREPANCY, UPDATE LOAD | | | CALCULATION AS NEEDED. WPB FBC 107.2.1; NEC 220, 215.2, | | | 215.5, 408.30, 408.36 | | | 116. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD | | | CALCULATION ON SHEET E-601A SHOWS A 3RD LOAD ON THE 480 | | | VOLT SERVICE FOR RETAILS. THIS IS NOT SHOWN ON RISER | | | DIAGRAM OR ANY OTHER LOCATION. PROVIDE DETAILS. WPB FBC | | | 107.2.1 | | | 117. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD | | | CALCULATION ON SHEET E-601A SHOWS A LOAD OF 596 AMPS | | | FOR MDP1. ON SHEET E-605, THIS PANEL SHOWS A LOAD OF | | | 1101 AMPS. CORRECT DISCREPANCY, UPDATE LOAD CALCULATION | | | AS NEEDED. NEC 220; WPB FBC 107.2.1 | | | 118. SHEET E-601A SHOWS MDP1 AS AN 800 AMP PANEL. | | | SHEETS E-502 AND E-605 SHOW IT AS 1200 AMP. CORRECT | | | DISCREPANCY, UPDATE LOAD CALCULATION AS NEEDED. WPB FBC | | | 107.2.1; NEC 220, 215.2, 215.5, 408.30, 408.36 | | | 119. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD | | | CALCULATION ON SHEET E-601A SHOWS A LOAD OF 481 AMPS IN | | | PANEL SCHEDULE FOR MDP1. SHEET E-605 SHOWS A LOAD OF | | | 872 AMPS FOR THIS PANEL. WPB FBC 107.2.1; NEC 220, | | | 215.2, 215.5, 408.30, 408.36 | | | 120. SHEET E-601A SHOWS PANEL H FED FROM MDP1 ON A 700 | | | AMP BREAKER, AND THE FEEDERS AS THREE SETS OF 350 AL | | | KCMIL, WHICH IS RATED FOR 750 AMPS. CORRECT CONDUCTOR | | | AND BREAKER SIZE TO MATCH RESULTS FROM COMMENT 119. NEC | | | 220, 215.2, 215.5, 310.15(B)(16), 408.30, 408.36 | | | 121. PANEL SCHEDULE FOR PANEL GMP SHOWS A LOAD NAMED TE | | | THAT IS 408 KVA. PROVIDE DETAILS AND PANEL SCHEDULE, | | | UPDATE LOAD CALCULATION AS NEEDED. SHEET E-601A SHOWS A | | | LOAD OF 360 KVA FOR EDPH, A LOAD OF 800 KVA FOR EQEH, | | | AND A LOAD OF 45 KVA FOR EOPH. WHEN THIS IS ADDED TO | | | THE LOAD OF 408 KVA FOR TE, THE GENERATOR WOULD BE | | | OVERLOADED. PROVIDE CLAIFICATIONS AND CORRECTIONS AS | | | NEEDED. WPB FBC 107.2.1; NEC 220, 215.2, 215.5, 408.30, | | | 408.36 | | | 122. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD | | | CALCULATION ON SHEET E-601A SHOWS A LOAD OF 433.5 AMPS | | | FOR PANEL EDPH. SHEET E-602 SHOWS A LOAD OF 179 AMPS. | | | CORRECT DISCREPANCY, UPDATE LOAD CALCULATION AS NEEDED. | | | WPB FBC 107.2.1; NEC 220, 215.2, 215.5, 408.30, 408.36 | | | 123. PROVIDE VOLTAGE DROP CALCULATIONS TO COMPLY WITH | | | CODE FOR ENTIRE SYSTEM. CURRENTLY, THE ONLY VOLTAGE | | | DROP PROVIDED IS FOR THE LOADS ON SHEET E-601. NONE OF | | | THE LOADS ON SHEET E-601A SHOW THE VOLTAGE DROP | | | CALCULATIONS. PROVIDE CORRECTION. FBC EC C405.6.3 | | | 124. PROVIDE BLOCK NOTE INDICATING COMPLIANCE: WITHIN | | | 30 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD | | | DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDE TO | | | THE BUILDING OWNER, INCLUDING: 1. A SINGLE LINE DIAGRAM | | | OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM AND 2. | | | FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR ALL | | | DISTRIBUTION. FBC EC C405.6.4.1 | | | 125. NO LOAD CALCULATION FOR GUEST SUITES IS PROVIDED | | | OR INCLUDED IN THE LOAD CALCULATION ON SHEET E-601 FOR | | | METER CENTER 1 / PANEL L. PROVIDE CORRECTION. WPB FBC | | | 107.2.1; NEC 220, 215.2, 215.5, 408.30, 408.36 | | | 126. SHEET E-501 AND E-502 ARE NAMED RESIDENTIAL POWER | | | RISER DIAGRAM. ONLY ONE OF THEM IS THE RESIDENTIAL | | | PORTION, THE OTHER IS NOT. PROVIDE DISTINCT NAME FOR | | | PLAN SHEET FOR CLARITY. WPB FBC 107.2.1 | | | 127. SHEET E-229 SHOWS A 125 AMP PANEL FOR PH-D. LOAD | | | CALCULATION PROVIDED SHOWS A LOAD FOR THIS UNIT OF 272 | | | AMPS. PROVIDE CORRECTION. PROVIDE WIRE AND CONDUIT | | | SIZES FOR FEEDS TO UNIT PANEL. PROVIDE ACCURATE | | | LOCATION OF ELECTRICAL PANEL. ALL PANEL SCHEDULES FOR | | | THE UNITS STATE THAT THE PANEL IS IN THE UTILITY ROOM, | | | BUT THIS IS NOT THE CASE. EDIT LOCATIONS IN PANEL | | | SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM CODE | | | COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS | | | REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC | | | 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30, | | | 408.36 | | | 128. SHEET E-227 AND E-228 SHOWS A 125 AMP PANEL FOR | | | PH-B AND PH-C. LOAD CALCULATION PROVIDED SHOWS A LOAD | | | FOR THIS UNIT OF 202 AND 200 AMPS, RESPCTIVELY. PROVIDE | | | CORRECTION. PROVIDE WIRE AND CONDUIT SIZES FOR FEEDS TO | | | UNIT PANEL. PROVIDE ACCURATE LOCATION OF ELECTRICAL | | | PANEL. ALL PANEL SCHEDULES FOR THE UNITS STATE THAT THE | | | PANEL IS IN THE UTILITY ROOM, BUT THIS IS NOT THE CASE. | | | EDIT LOCATIONS IN PANEL SCHEDULES AND SHOW LOCATION ON | | | PLAN TO CONFIRM CODE COMPLIANCE. REMOVE OR EDIT CLOUDS | | | FROM PREVIOUS REVISIONS THAT BLOCK OTHER INFORMATION ON | | | PLAN. WPB FBC 107.2.1; NEC 220, 215.2, 215.5, | | | 310.15(B)(16), 408.30, 408.36 | | | 129. SHEET E-226 SHOWS A 125 AMP PANEL FOR PH-A. LOAD | | | CALCULATION PROVIDED SHOWS A LOAD FOR THIS UNIT OF 190 | | | AMPS. PROVIDE CORRECTION. PROVIDE WIRE AND CONDUIT | | | SIZES FOR FEEDS TO UNIT PANEL. PROVIDE ACCURATE | | | LOCATION OF ELECTRICAL PANEL. ALL PANEL SCHEDULES FOR | | | THE UNITS STATE THAT THE PANEL IS IN THE UTILITY ROOM, | | | BUT THIS IS NOT THE CASE. EDIT LOCATIONS IN PANEL | | | SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM CODE | | | COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS | | | REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC | | | 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30, | | | 408.36 | | | 130. SHEET E-225 SHOWS A 125 AMP PANEL FOR UNIT F. LOAD | | | CALCULATION PROVIDED SHOWS A LOAD FOR THIS UNIT OF 154 | | | AMPS. PROVIDE CORRECTION. PROVIDE WIRE AND CONDUIT | | | SIZES FOR FEEDS TO UNIT PANEL. PROVIDE ACCURATE | | | LOCATION OF ELECTRICAL PANEL. ALL PANEL SCHEDULES FOR | | | THE UNITS STATE THAT THE PANEL IS IN THE UTILITY ROOM, | | | BUT THIS IS NOT THE CASE. EDIT LOCATIONS IN PANEL | | | SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM CODE | | | COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS | | | REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC | | | 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30, | | | 408.36 | | | 131. SHEET E-224 SHOWS A 125 AMP PANEL FOR UNIT E. LOAD | | | CALCULATION PROVIDED SHOWS A LOAD FOR THIS UNIT OF 157 | | | AMPS. PROVIDE CORRECTION. PROVIDE WIRE AND CONDUIT | | | SIZES FOR FEEDS TO UNIT PANEL. PROVIDE ACCURATE | | | LOCATION OF ELECTRICAL PANEL. ALL PANEL SCHEDULES FOR | | | THE UNITS STATE THAT THE PANEL IS IN THE UTILITY ROOM, | | | BUT THIS IS NOT THE CASE. EDIT LOCATIONS IN PANEL | | | SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM CODE | | | COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS | | | REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC | | | 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30, | | | 408.36 | | | 132. SHEET E-223 SHOWS A 125 AMP PANEL FOR UNIT D. | | | PROVIDE WIRE AND CONDUIT SIZES FOR FEEDS TO UNIT PANEL. | | | PROVIDE ACCURATE LOCATION OF ELECTRICAL PANEL. ALL | | | PANEL SCHEDULES FOR THE UNITS STATE THAT THE PANEL IS | | | IN THE UTILITY ROOM, BUT THIS IS NOT THE CASE. EDIT | | | LOCATIONS IN PANEL SCHEDULES AND SHOW LOCATION ON PLAN | | | TO CONFIRM CODE COMPLIANCE. REMOVE OR EDIT CLOUDS FROM | | | PREVIOUS REVISIONS THAT BLOCK OTHER INFORMATION ON | | | PLAN. WPB FBC 107.2.1; NEC 220, 215.2, 215.5, | | | 310.15(B)(16), 408.30, 408.36 | | | 133. SHEET E-222 SHOWS A 125 AMP PANEL FOR UNIT C. | | | PROVIDE WIRE AND CONDUIT SIZES FOR FEEDS TO UNIT PANEL. | | | PROVIDE ACCURATE LOCATION OF ELECTRICAL PANEL. ALL | | | PANEL SCHEDULES FOR THE UNITS STATE THAT THE PANEL IS | | | IN THE UTILITY ROOM, BUT THIS IS NOT THE CASE. EDIT | | | LOCATIONS IN PANEL SCHEDULES AND SHOW LOCATION ON PLAN | | | TO CONFIRM CODE COMPLIANCE. REMOVE OR EDIT CLOUDS FROM | | | PREVIOUS REVISIONS THAT BLOCK OTHER INFORMATION ON | | | PLAN. WPB FBC 107.2.1; NEC 220, 215.2, 215.5, | | | 310.15(B)(16), 408.30, 408.36 | | | 134. SHEET E-221 SHOWS A 125 AMP PANEL FOR UNIT B. LOAD | | | CALCULATION PROVIDED SHOWS A LOAD FOR THIS UNIT OF 126 | | | AMPS. PROVIDE CORRECTION. PROVIDE WIRE AND CONDUIT | | | SIZES FOR FEEDS TO UNIT PANEL. PROVIDE ACCURATE | | | LOCATION OF ELECTRICAL PANEL. ALL PANEL SCHEDULES FOR | | | THE UNITS STATE THAT THE PANEL IS IN THE UTILITY ROOM, | | | BUT THIS IS NOT THE CASE. EDIT LOCATIONS IN PANEL | | | SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM CODE | | | COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS | | | REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC | | | 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30, | | | 408.36 | | | 135. SHEET E-220 SHOWS A 125 AMP PANEL FOR UNIT A. | | | PROVIDE WIRE AND CONDUIT SIZES FOR FEEDS TO UNIT PANEL. | | | PROVIDE ACCURATE LOCATION OF ELECTRICAL PANEL. ALL | | | PANEL SCHEDULES FOR THE UNITS STATE THAT THE PANEL IS | | | IN THE UTILITY ROOM, BUT THIS IS NOT THE CASE. EDIT | | | LOCATIONS IN PANEL SCHEDULES AND SHOW LOCATION ON PLAN | | | TO CONFIRM CODE COMPLIANCE. REMOVE OR EDIT CLOUDS FROM | | | PREVIOUS REVISIONS THAT BLOCK OTHER INFORMATION ON | | | PLAN. WPB FBC 107.2.1; NEC 220, 215.2, 215.5, | | | 310.15(B)(16), 408.30, 408.36 | | | 136. SHEET E-230 SHOWS A 125 AMP PANEL FOR GUEST | | | SUITES. PROVIDE LOAD CALCULATION FOR PANEL. PROVIDE | | | WIRE AND CONDUIT SIZES FOR FEEDS TO UNIT PANEL. PROVIDE | | | ACCURATE LOCATION OF ELECTRICAL PANEL. ALL PANEL | | | SCHEDULES FOR THE UNITS STATE THAT THE PANEL IS IN THE | | | UTILITY ROOM, BUT THIS IS NOT THE CASE. EDIT LOCATIONS | | | IN PANEL SCHEDULES AND SHOW LOCATION ON PLAN TO CONFIRM | | | CODE COMPLIANCE. REMOVE OR EDIT CLOUDS FROM PREVIOUS | | | REVISIONS THAT BLOCK OTHER INFORMATION ON PLAN. WPB FBC | | | 107.2.1; NEC 220, 215.2, 215.5, 310.15(B)(16), 408.30, | | | 408.36 | | | 137. IN REFERENCE TO PREVIOUS COMMENT 103, LOAD | | | CALCULATION ON SHEET E-601A SHOWS A LOAD OF 54.2 AMPS | | | FOR PANEL EOPH. SHEET E-602 SHOWS A LOAD OF 96 AMPS. | | | CORRECT DISCREPANCY, UPDATE LOAD CALCULATION AS NEEDED. | | | WPB FBC 107.2.1; NEC 220, 215.2, 215.5, 408.30, 408.36 | | | 138. DIAGRAM ON SHEET E-501 SHOWS TWO PANELS IN EVERY | | | UNIT WITH A TRANSFER SWITCH. THIS DETAIL IS NOT | | | REFLECTED ANYWHERE ELSE IN PLAN. ENLARGED UNIT PLANS | | | SHOULD SHOW CONTAIN THIS INFORMATION, INCLUDING WHAT | | | LOADS ARE ON MAIN PANEL AND WHICH ARE ON EMERGENCY | | | PANEL. SHOW LOCATION OF PANELS IN THE UNITS. PROVIDE | | | DETAILS. WPB FBC 107.2.1; NEC 215.5, 220 | | | 139. SHEET E-502 SHOWS A 1000 KW GENERATOR. LOAD | | | CALCULATION PROVIDED ON SHEET E-601A SHOWS A LOAD OF | | | 1205 KVA ON EMERGENCY SYSTEM, AND A LOAD OF 200 KVA FOR | | | FIRE PUMP, FOR A TOTAL OF 1405 KVA. THE LEGALLY | | | REQUIRED GENERATOR MUST BE SIZED TO HANDLE ALL OF THIS | | | LOAD. PROVIDE CORRECTION. NEC 695.3(D)(1), 701.4 | | | 140. SHEET E-701, DETAILS 3, 4, AND 5 DO NOT IDENTIFY | | | THE EQUIPMENT IN THE ELECTRICAL ROOMS. PROVIDE | | | CORRECTION. WPB FBC 107.2.1 | | | 141. PROVIDE LIGHT FIXTURE LEGEND AND SCHEDULE TO | | | CORRESPOND WITH DRAWINGS. LIGHTING IN BATHTUB OR SHOWER | | | AREAS SHALL BE SUITABLE FOR DAMP LOCATIONS. LIGHTING | | | WITH OPEN OR PARTIALLY ENCLOSED LAMPS AND PENDANT | | | LUMINAIRES OR LAMPHOLDERS SHALL NOT BE PERMITTED IN | | | CLOTHES CLOSETS. NONE OF THESE ARE CLEAR ON PLAN, | | | PROVIDE CORRECTION. NEC 410.10(D), 410.16. | | | 142. PROVIDE COMPLIANCE WITH FBC C402.5.8: RECESSED | | | LUMINAIRES INSTALLED IN THE BUILDING THERMAL ENVELOPE | | | SHALL BE ALL OF THE FOLLOWING: | | | 1.IC-RATED. | | | 2.LABELED AS HAVING AN AIR LEAKAGE RATE OF NOT MORE | | | 2.0 CFM (0.944 L/S) WHEN TESTED IN ACCORDANCE WITH ASTM | | | E283 AT A 1.57 PSF (75 PA) PRESSURE DIFFERENTIAL. | | | 3.SEALED WITH A GASKET OR CAULK BETWEEN THE HOUSING | | | AND INTERIOR WALL OR CEILING COVERING. | | | 143. PLEASE BE ADVISED THAT SOME OF THESE COMMENTS HAVE | | | NOT BEEN ADDRESSED FOR TWO REVIEWS. IF UPON THE NEXT | | | REVIEW, IF IT IS NECESSARY TO REJECT THE SUBMITTED PLAN | | | AGAIN FOR THE SAME REASONS, AN ADDITIONAL PLAN REVIEW | | | IS REQUIRED. FLORIDA STATUTES STATE: WITH RESPECT TO | | | EVALUATION OF DESIGN PROFESSIONALS DOCUMENTS, IF A | | | LOCAL GOVERNMENT FINDS IT NECESSARY, IN ORDER TO | | | ENFORCE COMPLIANCE WITH THE FLORIDA BUILDING CODE AND | | | ISSUE A PERMIT, TO REJECT DESIGN DOCUMENTS REQUIRED BY | | | THE CODE THREE OR MORE TIMES FOR FAILURE TO CORRECT A | | | CODE VIOLATION SPECIFICALLY AND CONTINUOUSLY NOTED IN | | | EACH REJECTION, INCLUDING, BUT NOT LIMITED TO, EGRESS, | | | FIRE PROTECTION, STRUCTURAL STABILITY, ENERGY, | | | ACCESSIBILITY, LIGHTING, VENTILATION, ELECTRICAL, | | | MECHANICAL, PLUMBING, AND GAS SYSTEMS, OR OTHER | | | REQUIREMENTS IDENTIFIED BY RULE OF THE FLORIDA BUILDING | | | COMMISSION ADOPTED PURSUANT TO CHAPTER 120, THE LOCAL | | | GOVERNMENT SHALL IMPOSE, EACH TIME AFTER THE THIRD SUCH | | | REVIEW THE PLANS ARE REJECTED FOR THAT CODE VIOLATION, | | | A FEE OF FOUR TIMES THE AMOUNT OF THE PROPORTION OF THE | | | PERMIT FEE ATTRIBUTED TO PLANS REVIEW. FS 553.80(2)(B) | | | THE ADDITIONAL FEE FOR THIS PROJECT WOULD BE | | | $735,550.00 | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY | | | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED | | | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD | | | SHEETS. | | | | | | SINCERELY, | | | | | | JOHN PEARSON | | | ELECTRICAL PLANS EXAMINER | | | 561-805-6746 | | | [email protected] | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2019-02-12 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-02-12 |
Time |
15:45 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-02-08 |
Time |
11:22 |
Sent To |
|
|
| Notes |
| 2019-02-12 09:17:38 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED | | | SATISFACTORILY HAVE BEEN REMOVED. PREVIOUS COMMENTS | | | THAT HAVE NOT BEEN ADDRESSED SATISFACTORILY HAVE | | | ADDITIONAL COMMENTS IN PARENTHESES. ANY NEW COMMENTS | | | WILL BE LISTED AFTER PREVIOUS COMMENTS. | | | | | | | | | 14. SHEET E-102B, CIRCUIT AL-17 IS SHOWN FEEDING THE | | | TRATAM ROOM. WHAT IS THIS ROOM USED FOR, IS GFCI | | | PROTECTION REQUIRED. PROVIDE CLARIFICATION AND/OR | | | CORRECTION. NEC 210.8; WPB FBC 107.2.1 (BASED ON | | | DESCRIPTION PROVIDED, GFCI PROTECTION IS REQUIRED. | | | PROVIDE CORRECTION. NEC 210.8(B)(7) ) | | | 15. SHEET E-102B, CIRCUIT AL-1, 3, 5 IS SHOWN FEEDING | | | HP-2L-2, BUT THE PANEL SCHEDULE SHOWS CIRCUIT 1 AND 3 | | | FEEDING POOL RECEPTACLES. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED | | | SHEET, THIS INFORMATION IS STILL SHOWN.) | | | 16. SHEET E-103, ALL RECEPTACLE OUTLETS IN CATERING | | | KITCHEN AND PERFORMANCE KITCHEN REQUIRE GFCI | | | PROTECTION. PROVIDE CORRECTION. NEC 210.8(B)(2) (IT | | | SEEMS WE DID NOT RECEIVE THE CORRECTED SHEET, THIS | | | INFORMATION IS STILL SHOWN.) | | | 84. LIGHTING SHEETS (ALL) DO NOT SHOW THE AUTOMATIC | | | CONTROL REQUIRED. PROVIDE THE ADDITIONAL AUTOMATIC | | | LIGHTING CONTROLS STIPULATED IN THE FBC ENERGY CODE. | | | FBC EC C405.2 (NOT PROVIDED, THIS IS FOR INTERIOR | | | SPACES NOT PART OF A DWELLING UNIT.) | | | 85. PROVIDE GRAPH/CALCULATION OF EXTERIOR LIGHTING | | | POWER ALLOWANCES PER THE FBC ENERGY CONSERVATION IN | | | RELATION TO THE CONNECTED EXTERIOR LIGHTING PROPOSED TO | | | COMPLY WITH CODE. FBC EC C405.5.1 (NOT PROVIDED.) | | | 87. SHEET E-501, LABEL ALL FEEDERS TO SHOW WIRE AND | | | CONDUIT SIZE. WPB FBC 107.2.1; NEC 310.15 (FROM FPL | | | VAULT TO MAINS NOT SHOWN.) | | | 91. SHEET E-502, LABEL ALL FEEDERS TO SHOW WIRE AND | | | CONDUIT SIZE. WPB FBC 107.2.1; NEC 310.15 (FROM FPL | | | VAULT TO MAINS NOT SHOWN. TRANSFORMER SCHEDULE PASTED | | | OVER RISER AND IS DIFFICULT TO READ.) | | | 94. PROVIDE DETAILS OF ARC FLASH MITIGATION FOR ALL | | | MAINS PER CODE. NEC 240.87 (ARC FAULT MITIGATION IS NOT | | | RELIANT ON THE AIC CALCULATION. SEE CODE SECTION FOR | | | METHODS OF COMPLIANCE.) | | | 95. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR | | | EACH PANEL INCLUDING INFORMATION FROM THE POWER COMPANY | | | STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR | | | THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE | | | SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE. | | | NEC 110.9, 110.10 (NOT PROVIDED, NOTED THAT THE | | | APPLICANT IS WAITING ON FPL. THIS CAN BE A DEFERRED | | | SUBMITTAL IF YOU CHOOSE. BE AWARE THAT APPLICANT WOULD | | | BE PROCEEDING AT YOUR OWN RISK UNTIL THIS INFORMATION | | | IS OBTAINED. IF SO DESIRED, PROVIDE NOTE ON PLAN TO | | | THAT EFFECT.) | | | 96. ON RISER DIAGRAM PANEL EQPH IS SHOWN AS A 100 AMP | | | PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS | | | SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED | | | PANEL SCHEDULE SHEET, THIS INFORMATION IS STILL SHOWN.) | | | 97. ON RISER DIAGRAM PANEL EQEH IS SHOWN AS A 1200 AMP | | | PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS | | | SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED | | | PANEL SCHEDULE SHEET, THIS INFORMATION IS STILL SHOWN.) | | | 98. ON RISER DIAGRAM PANEL EDPH IS SHOWN AS A 600 AMP | | | PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS | | | SHOWN AS AN 1200 AMP PANEL. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED | | | PANEL SCHEDULE SHEET, THIS INFORMATION IS STILL SHOWN.) | | | 102. AS ADJUSTMENTS ARE MADE TO DISCREPANCIES IN PLAN, | | | PROVIDE UPDATED LOAD CALCULATION FOR EACH PANEL AND | | | SERVICE. NEC 220 (IT SEEMS WE DID NOT RECEIVE THE | | | CORRECTED SHEET, THIS INFORMATION IS STILL SHOWN.) | | | 103. SHEET E-601A, LOADS LISTED FOR LOAD CALCULATION | | | SHOWN ARE MUCH DIFFERENT THAN THE LOADS SHOWN IN THE | | | CORRESPONDING PANEL SCHEDULES. PROVIDE CLARIFICATION | | | AND CORRECTION. WPB FBC 107.2.1; NEC 220 (IT SEEMS WE | | | DID NOT RECEIVE THE CORRECTED SHEET, THIS INFORMATION | | | IS STILL SHOWN.) | | | 104. WHERE ARE ELEVATORS FED FROM? I COULD NOT FIND | | | THIS LOAD INCLUDED IN THE LOAD CALCULATION OR IN ANY | | | PANEL SCHEDULES. PROVIDE CORRECTION. WPB FBC 107.2.1; | | | NEC 220 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED | | | SHEET, THIS INFORMATION IS STILL SHOWN.) | | | 105. MANY OF THE PANEL SCHEDULES PROVIDED ARE | | | INCOMPLETE. HOW CAN AN ACCURATE LOAD CALCULATION BE | | | PROVIDED WITH THIS MUCH MISSING INFORMATION. PROVIDE | | | CORRECTION. WPB FBC 107.2.1; NEC 220 (IT SEEMS WE DID | | | NOT RECEIVE THE CORRECTED SHEET, THIS INFORMATION IS | | | STILL SHOWN.) | | | 106. RISER DIAGRAM STATES THAT MDP1 IS ONE OF THE | | | MAINS. THE PANEL SCHEDULE FOR THIS PANEL DOES NOT SHOW | | | A MAIN. PROVIDE CORRECTION. WPB FBC 107.2.1; NEC 230.2 | | | (IT SEEMS WE DID NOT RECEIVE THE CORRECTED SHEET, THIS | | | INFORMATION IS STILL SHOWN.) | | | 107. LOAD FOR PANEL H SHOWN IN PANEL SCHEDULE FOR PANEL | | | MDP1 IS MUCH DIFFERENT THAN THE LOAD SHOWN IN THE PANEL | | | SCHEDULE FOR PANEL H. PROVIDE CORRECTION. WPB FBC | | | 107.2.1; NEC 220 (IT SEEMS WE DID NOT RECEIVE THE | | | CORRECTED SHEET, THIS INFORMATION IS STILL SHOWN.) | | | 108. RISER DIAGRAM STATES THAT THE EMERGENCY MAINS ARE | | | MAINS 2 AND 3. THE PANEL SCHEDULE FOR THESE PANELS DOES | | | NOT SHOW A MAIN. PROVIDE CORRECTION. WPB FBC 107.2.1; | | | NEC 230.2 (IT SEEMS WE DID NOT RECEIVE THE CORRECTED | | | SHEET, THIS INFORMATION IS STILL SHOWN.) | | | | | | NEW COMMENTS: | | | | | | 109. PROVIDE LEGIBLE SHEET FOR E-502. THERE ARE | | | GENERATOR SPECS PASTED OVER THE DRAWING KEYNOTES, | | | MAKING PART OF THIS SHEET ILLEGIBLE. WPB FBC 107.2.1 | | | 110. CORRECT DISCREPANCY FOR 75KVA TRANSFORMER FEEDING | | | PANEL RL. RISER SHOWS IT BEING FED FROM PANEL RH. PANEL | | | SCHEDULE SHOWS IT BEING FED FROM PANEL RDH. WPB FBC | | | 107.2.1 | | | 111. PROVIDE PANEL SCHEDULE FOR ALL PANELS. SOME ARE | | | MISSING, SUCH AS RDEH AND RH. WPB FBC 107.2.1; NEC | | | 408.4 | | | 112. SHEET E-701, GENERATOR AND EMERGENCY ROOM ? | | | ENLARGED PLAN, IT APPEARS THERE IS A WALL BUILT IN | | | FRONT OF PANELS EOPH, EOL, EQEH, EQH, EQL, AND THE TWO | | | TRANSFORMERS ON THAT WALL. PROVIDE CLARIFICATION AND/OR | | | CORRECTION. NEC 110.26; WPB FBC 107.2.1 | | | 113. BE ADVISED THAT FIRE ALARM, LOW VOLTAGE SYSTEMS, | | | DAS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL HOOD | | | SYSTEMS, WALK IN COOLERS, SIGNS, SITE LIGHTING, AND | | | SWIMMING POOLS (WHERE APPLICABLE) ARE NOT INCLUDED IN | | | THE SCOPE OF THIS PLAN REVIEW. PROVIDE A BLOCK NOTE | | | INDICATING THE REQUIRED SEPARATE PERMITS AND PLAN | | | SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. WPB FBC | | | 105.1, 107.2.1 | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY | | | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED | | | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD | | | SHEETS. | | | | | | SINCERELY, | | | | | | JOHN PEARSON | | | ELECTRICAL PLANS EXAMINER | | | 561-805-6746 | | | [email protected] | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2018-10-19 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2018-10-19 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2018-10-17 |
Time |
12:21 |
Sent To |
|
|
| Notes |
| 2018-10-18 08:58:07 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | BE ADVISED THAT THERE IS SO MUCH CONFLICTING AND | | | INCOMPLETE INFORMATION ON THIS SUBMISSION THAT A FULL | | | REVIEW WILL BE REQUIRED FOR THE SECOND REVIEW, LIKELY | | | RESULTING IN FURTHER COMMENTS. | | | | | | 1. SHEET E-001, PLAN STATES THAT IT IS NOT FOR | | | CONSTRUCTION OR PERMIT PURPOSES. REMOVE STATEMENT AND | | | PROVIDE COMPLETED PERMIT SET FOR REVIEW. WPB FBC | | | 107.2.1 | | | 2. SHEET E-001, NOTE 4, THE NEC AND FBC SPECIFIED FOR | | | DESIGN IS NOT THE CURRENT CODE. PROVIDE CORRECTION. FBC | | | PREFACE (ALSO SEE CURRENT CODES ABOVE) | | | 3. SHEET E-001, NOTE 63, AFCI PROTECTION SHOWN IN NOT | | | CODE COMPLIANT. ALL BRANCH CIRCUITS THAT SUPPLY | | | 120-VOLT, SINGLE-PHASE, 15- AND 20-AMPERE OUTLETS | | | INSTALLED IN KITCHENS, FAMILY ROOMS, DINING ROOMS, | | | LIVING ROOMS, PARLORS, LIBRARIES, DENS, BEDROOMS, | | | SUN-ROOMS, RECREATIONS ROOMS, CLOSETS, HALLWAYS, | | | LAUNDRY AREAS AND SIMILAR ROOMS OR AREAS SHALL BE AFCI | | | PROTECTED. THIS INCLUDES LIGHTING AND POWER OUTLETS AND | | | RECEPTACLES. SOME AREAS REQUIRE BOTH AFCI AND GFCI | | | PROTECTION. PROVIDE CORRECTION. NEC 210.8, 210.12 | | | 4. SHEET E-001, NOTE 68, STATES THAT RECEPTACLES SHALL | | | BE TAMPER RESISTANT PER NEC 406.11. THIS CODE SECTION | | | DOES NOT APPLY TO TAMPER RESISTANT RECEPTACLES. PROVIDE | | | CORRECTION. NEC 406.12 | | | 5. SHEET E-001, NOTE 79, REFERS TO THE 2010 FBC FOR | | | STAIRS. PROVIDE CLARIFICATION FOR PERTINENCE TO | | | ELECTRICAL REVIEW. PROVIDE CORRECT CODE FOR DESIGN. WPB | | | FBC 107.2.1; FBC PREFACE (ALSO SEE CURRENT CODES ABOVE) | | | 6. SHEET E-001, NOTE 80, THE NEC AND FBC SPECIFIED FOR | | | DESIGN IS NOT THE CURRENT CODE. PROVIDE CORRECTION. FBC | | | PREFACE (ALSO SEE CURRENT CODES ABOVE) | | | 7. SHEET E-101, PROVIDE GFCI PROTECTION FOR ALL | | | RECEPTACLE OUTLETS IN GARAGE. NEC 210.8(B)(8) | | | 8. SHEET E-101, DETAILS ARE SPECIFIED TO BE ON SHEET | | | E-701WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE | | | CORRECTION. WPB FBC 107.2.1 | | | 9. SHEET E-101, DETAILS ARE SPECIFIED TO BE ON SHEET | | | E-702 WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE | | | CORRECTION. WPB FBC 107.2.1 | | | 10. SHEET E-101, DETAIL 1 FOR MAIN ELECTRICAL ROOM IS | | | MISSING. PROVIDE CORRECTION. WPB FBC 107.2.1 | | | 11. SHEET E-101A, PROVIDE GFCI PROTECTED RECEPTACLE | | | OUTLET FOR SERVICING OF A/C EQUIPMENT WITHIN 25 FEET OF | | | THE EQUIPMENT PER CODE. NEC 210.63 | | | 12. SHEET E-101A, PROVIDE THE REQUIRED SERVICE AREA | | | RECEPTACLE PER CODE. NEC 210.64 | | | 13. SHEET E-101B, PROVIDE GFCI PROTECTION FOR ALL | | | RECEPTACLE OUTLETS IN GARAGE. NEC 210.8(B)(8) | | | 14. SHEET E-102B, CIRCUIT AL-17 IS SHOWN FEEDING THE | | | TRATAM ROOM. WHAT IS THIS ROOM USED FOR, IS GFCI | | | PROTECTION REQUIRED. PROVIDE CLARIFICATION AND/OR | | | CORRECTION. NEC 210.8; WPB FBC 107.2.1 | | | 15. SHEET E-102B, CIRCUIT AL-1, 3, 5 IS SHOWN FEEDING | | | HP-2L-2, BUT THE PANEL SCHEDULE SHOWS CIRCUIT 1 AND 3 | | | FEEDING POOL RECEPTACLES. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 16. SHEET E-103, ALL RECEPTACLE OUTLETS IN CATERING | | | KITCHEN AND PERFORMANCE KITCHEN REQUIRE GFCI | | | PROTECTION. PROVIDE CORRECTION. NEC 210.8(B)(2) | | | 17. SHEET E-104, DETAIL 3 IS SPECIFIED TO BE ON SHEET | | | E-701WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE | | | CORRECTION. WPB FBC 107.2.1 | | | 18. SHEET E-104, CORRIDOR RECEPTACLE OUTLETS ARE MARKED | | | AS EITHER ?CC? OR ?CC1?. WHAT DOES THIS DESIGNATION | | | MEAN? PROVIDE CLARIFICATION. WPB FBC 107.2.1 | | | 19. SHEET E-106, DETAIL 5 IS SPECIFIED TO BE ON SHEET | | | E-701WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE | | | CORRECTION. WPB FBC 107.2.1 | | | 20. SHEET E-106, CORRIDOR RECEPTACLE OUTLETS ARE MARKED | | | AS EITHER ?CC? OR ?CC1?. WHAT DOES THIS DESIGNATION | | | MEAN? PROVIDE CLARIFICATION. WPB FBC 107.2.1 | | | 21. SHEET E-107, DETAIL 4 IS SPECIFIED TO BE ON SHEET | | | E-701WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE | | | CORRECTION. WPB FBC 107.2.1 | | | 22. SHEET E-108, DETAIL 1 IS SPECIFIED TO BE ON SHEET | | | E-702 WHICH WAS NOT PROVIDED IN SUBMISSION. PROVIDE | | | CORRECTION. WPB FBC 107.2.1 | | | 23. SHEET E-220, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 24. SHEET E-220, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 25. SHEET E-220, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 26. SHEET E-220, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 27. SHEET E-220, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 28. SHEET E-220, PROVIDE GFCI RECEPTACLE ON EACH | | | BALCONY ACCESSIBLE FROM UNIT. NEC 210.52(E)(3) | | | 29. SHEET E-221, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 30. SHEET E-221, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 31. SHEET E-221, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 32. SHEET E-221, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 33. SHEET E-221, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 34. SHEET E-221, A GFCI PROTECTED RECEPTACLE OUTLET ON | | | A 20 AMP CIRCUIT IS REQUIRED WITHIN 3 FEET OF EACH | | | BASIN. PROVIDE CORRECTION. NEC 210.11(C)(3), 210.52(D) | | | 35. SHEET E-222, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 36. SHEET E-222, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 37. SHEET E-222, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 38. SHEET E-222, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 39. SHEET E-222, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 40. SHEET E-223, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 41. SHEET E-223, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 42. SHEET E-223, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 43. SHEET E-223, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 44. SHEET E-224, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 45. SHEET E-223, PROVIDE GFCI RECEPTACLE ON EACH | | | BALCONY ACCESSIBLE FROM UNIT. NEC 210.52(E)(3) | | | 46. SHEET E-224, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 47. SHEET E-224, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 48. SHEET E-224, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 49. SHEET E-224, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 50. SHEET E-224, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 51. SHEET E-225, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 52. SHEET E-225, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 53. SHEET E-225, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 54. SHEET E-225, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 55. SHEET E-225, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 56. SHEET E-225, COMPLETE PLAN FOR UNIT F IS NOT ON | | | PLAN SHEET, IT APPEARS TO HAVE BEEN CUT OFF. PROVIDE | | | COMPLETE FLOOR PLAN FOR UNIT F ON PLAN SHEET. WPB FBC | | | 107.2.1 | | | 57. SHEET E-226, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 58. SHEET E-226, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 59. SHEET E-226, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 60. SHEET E-226, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 61. SHEET E-226, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 62. SHEET E-227, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 63. SHEET E-227, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 64. SHEET E-227, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 65. SHEET E-227, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 66. SHEET E-227, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 67. SHEET E-227, RECEPTACLE OUTLETS INSTALLED IN | | | LAUNDRY AREAS SHALL HAVE GFCI PROTECTION. PROVIDE | | | CORRECTION. NEC 210.8(A)(9) | | | 68. SHEET E-228, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 69. SHEET E-228, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 70. SHEET E-228, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 71. SHEET E-228, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 72. SHEET E-228, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 73. SHEET E-229, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 74. SHEET E-229, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 75. SHEET E-229, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 76. SHEET E-229, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 77. SHEET E-229, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 78. SHEET E-229, A GFCI PROTECTED RECEPTACLE OUTLET ON | | | A 20 AMP CIRCUIT IS REQUIRED WITHIN 3 FEET OF EACH | | | BASIN. PROVIDE CORRECTION. NEC 210.11(C)(3), 210.52(D) | | | 79. SHEET E-230, KEYNOTE 1 SPECIFIES THE 2008 NEC AS | | | BASIS FOR DESIGN. PROVIDE CORRECTION. FBC PREFACE | | | 80. SHEET E-230, PANEL SCHEDULE PROVIDED DOES NOT SHOW | | | AFCI PROTECTION PER CODE. SEE COMMENT NUMBER 3. PROVIDE | | | CORRECTION. NEC 210.12 | | | 81. SHEET E-230, PROVIDE GFCI PROTECTION FOR | | | DISHWASHER. NEC 210.8(D) | | | 82. SHEET E-230, LABEL ROOMS TO FACILITATE CODE | | | COMPLIANCE. WPB FBC 107.2.1 | | | 83. SHEET E-230, PANEL IS SHOWN AS 120/240 VOLT SINGLE | | | PHASE. ACCORDING TO THE RISER DIAGRAM, PANELS WILL BE | | | 120/208 VOLT SINGLE PHASE. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 84. LIGHTING SHEETS (ALL) DO NOT SHOW THE AUTOMATIC | | | CONTROL REQUIRED. PROVIDE THE ADDITIONAL AUTOMATIC | | | LIGHTING CONTROLS STIPULATED IN THE FBC ENERGY CODE. | | | FBC EC C405.2 | | | 85. PROVIDE GRAPH/CALCULATION OF EXTERIOR LIGHTING | | | POWER ALLOWANCES PER THE FBC ENERGY CONSERVATION IN | | | RELATION TO THE CONNECTED EXTERIOR LIGHTING PROPOSED TO | | | COMPLY WITH CODE. FBC EC C405.5.1 | | | 86. SHEET E-501, NOTE 4 SPECS A 2500 KW GENERATOR. | | | SHEET E-502, THE RISER DIAGRAM SHOWS A 1000 KW | | | GENERATOR. PROVIDE CLARIFICATION AND CORRECTION. WPB | | | FBC 107.2.1 | | | 87. SHEET E-501, LABEL ALL FEEDERS TO SHOW WIRE AND | | | CONDUIT SIZE. WPB FBC 107.2.1; NEC 310.15 | | | 88. SHEET E-502, PLAN STATES THAT IT IS NOT FOR | | | CONSTRUCTION OR PERMIT PURPOSES. REMOVE STATEMENT AND | | | PROVIDE COMPLETED PERMIT SET FOR REVIEW. WPB FBC | | | 107.2.1 | | | 89. SHEET E-502 IS LABELED AS THE RESIDENTIAL RISER | | | DIAGRAM, WHICH IS ALSO WHAT E-501 IS LABELED. PROVIDE | | | CORRECTION. WPB FBC 107.2.1 | | | 90. SHEET E-502 STATES THAT THERE WILL BE A 125 | | | HORSEPOWER FIRE PUMP. SHEET E-601A STATES THAT THE FIRE | | | PUMP WILL BE 200 HORSEPOWER. CORRECT DISCREPANCY. | | | CORRECT LOAD CALCULATION AND WIRE SIZE AS NEEDED FOR | | | FIRE PUMP FEED. NEC 695.6; WPB FBC 107.2.1 | | | 91. SHEET E-502, LABEL ALL FEEDERS TO SHOW WIRE AND | | | CONDUIT SIZE. WPB FBC 107.2.1; NEC 310.15 | | | 92. SHEET E-502, THE SIZE OF THE MAINS IS NOT SHOWN ON | | | PLAN. PROVIDE CORRECTION. WPB FBC 107.2.1 | | | 93. PROVIDE GROUND FAULT PROTECTION FOR MAINS AS PER | | | CODE. NEC 230.95 | | | 94. PROVIDE DETAILS OF ARC FLASH MITIGATION FOR ALL | | | MAINS PER CODE. NEC 240.87 | | | 95. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR | | | EACH PANEL INCLUDING INFORMATION FROM THE POWER COMPANY | | | STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR | | | THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE | | | SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE. | | | NEC 110.9, 110.10 | | | 96. ON RISER DIAGRAM PANEL EQPH IS SHOWN AS A 100 AMP | | | PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS | | | SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 97. ON RISER DIAGRAM PANEL EQEH IS SHOWN AS A 1200 AMP | | | PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS | | | SHOWN AS AN 800 AMP PANEL. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 98. ON RISER DIAGRAM PANEL EDPH IS SHOWN AS A 600 AMP | | | PANEL. IN THE PANEL SCHEDULE FOR THIS PANEL, IT IS | | | SHOWN AS AN 1200 AMP PANEL. PROVIDE CORRECTION. WPB FBC | | | 107.2.1 | | | 99. IN REFERENCE TO COMMENTS 96, 97, AND 98, CORRECT | | | THE SIZING OF TRANSFER SWITCHES 1, 2, AND 3 TO | | | CORRESPOND TO THE PANELS THAT THEY FEED. WPB FBC | | | 107.2.1 | | | 100. GENERATOR SHOWN ON RISER DIAGRAM APPEARS TO FEED | | | SOME SORT OF PANEL AND THEN BRANCHES OUT TO THE | | | TRANSFER SWITCHES. PROVIDE CLARIFICATION. PROVIDE PANEL | | | SCHEDULE IS THIS IS A PANEL. WPB FBC 107.2.1; NEC | | | 408.4, 408.30, 408.36 | | | 101. SHEET E-602, PANEL EM AND PANEL GMP ARE SHOWN | | | FEEDING THE SAME LOADS. PROVIDE CLARIFICATION AND | | | CORRECTION. WPB FBC 107.2.1 | | | 102. AS ADJUSTMENTS ARE MADE TO DISCREPANCIES IN PLAN, | | | PROVIDE UPDATED LOAD CALCULATION FOR EACH PANEL AND | | | SERVICE. NEC 220 | | | 103. SHEET E-601A, LOADS LISTED FOR LOAD CALCULATION | | | SHOWN ARE MUCH DIFFERENT THAN THE LOADS SHOWN IN THE | | | CORRESPONDING PANEL SCHEDULES. PROVIDE CLARIFICATION | | | AND CORRECTION. WPB FBC 107.2.1; NEC 220 | | | 104. WHERE ARE ELEVATORS FED FROM? I COULD NOT FIND | | | THIS LOAD INCLUDED IN THE LOAD CALCULATION OR IN ANY | | | PANEL SCHEDULES. PROVIDE CORRECTION. WPB FBC 107.2.1; | | | NEC 220 | | | 105. MANY OF THE PANEL SCHEDULES PROVIDED ARE | | | INCOMPLETE. HOW CAN AN ACCURATE LOAD CALCULATION BE | | | PROVIDED WITH THIS MUCH MISSING INFORMATION. PROVIDE | | | CORRECTION. WPB FBC 107.2.1; NEC 220 | | | 106. RISER DIAGRAM STATES THAT MDP1 IS ONE OF THE | | | MAINS. THE PANEL SCHEDULE FOR THIS PANEL DOES NOT SHOW | | | A MAIN. PROVIDE CORRECTION. WPB FBC 107.2.1; NEC 230.2 | | | 107. LOAD FOR PANEL H SHOWN IN PANEL SCHEDULE FOR PANEL | | | MDP1 IS MUCH DIFFERENT THAN THE LOAD SHOWN IN THE PANEL | | | SCHEDULE FOR PANEL H. PROVIDE CORRECTION. WPB FBC | | | 107.2.1; NEC 220 | | | 108. RISER DIAGRAM STATES THAT THE EMERGENCY MAINS ARE | | | MAINS 2 AND 3. THE PANEL SCHEDULE FOR THESE PANELS DOES | | | NOT SHOW A MAIN. PROVIDE CORRECTION. WPB FBC 107.2.1; | | | NEC 230.2 | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY | | | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED | | | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD | | | SHEETS. | | | | | | SINCERELY, | | | | | | JOHN PEARSON | | | ELECTRICAL PLANS EXAMINER | | | 561-805-6746 | | | [email protected] | | | | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
4 |
Status |
P |
Date |
2019-09-12 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2019-09-12 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2019-09-12 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-09-12 11:52:22 | UNDER FORMAL ENGINEERING REVIEW (E18020047 -1515 S | | | FLAGLER DR). |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
F |
Date |
2019-07-08 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-07-08 |
Time |
07:02 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-07-08 |
Time |
07:02 |
Sent To |
|
|
| Notes |
| 2019-07-08 07:02:52 | CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT | | | APPLICATION IF REQUIRED | | | HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS | | | /FORMS,-PERMITS-APPLICATIONS | | | | | | ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE | | | | | | MAIN PHONE: (561) 822-1200 | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2019-02-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-02-21 |
Time |
14:34 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-02-21 |
Time |
14:34 |
Sent To |
|
|
| Notes |
| 2019-02-21 14:34:49 | CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT | | | APPLICATION IF REQUIRED | | | HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS | | | /FORMS,-PERMITS-APPLICATIONS | | | | | | ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE | | | | | | MAIN PHONE: (561) 822-1200 | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2018-12-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-12-20 |
Time |
17:36 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-12-20 |
Time |
17:35 |
Sent To |
|
|
| Notes |
| 2018-12-20 17:36:36 | CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT | | | APPLICATION IF REQUIRED | | | HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS | | | /FORMS,-PERMITS-APPLICATIONS | | | | | | ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE | | | | | | MAIN PHONE: (561) 822-1200 | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
2019-08-12 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-08-12 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-07-31 |
Time |
16:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2019-05-30 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-05-30 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-05-24 |
Time |
14:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2019-01-16 |
|
|
Cont ID |
|
| Sent By |
scaldero |
Date |
2019-01-16 |
Time |
12:06 |
Rev Time |
0.00 |
| Received By |
scaldero |
Date |
2019-01-16 |
Time |
10:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2018-10-31 |
|
|
Cont ID |
|
| Sent By |
scaldero |
Date |
2018-10-31 |
Time |
12:16 |
Rev Time |
0.00 |
| Received By |
scaldero |
Date |
2018-10-17 |
Time |
13:45 |
Sent To |
|
|
| Notes |
| 2018-10-30 16:12:50 | PERMIT # 18081528 | | | REVIEW COMMENTS - FIRE DEPARTMENT | | | | | | FAILED COMMENTS: | | | | | | 1) ENGINEERED FIRE ALARM AND FIRE SPRINKLER | | | CONSTRUCTION DOCUMENTS ARE REQUIRED FOR A GENERAL | | | BUILDING PERMIT. AFTER THE BUILDING PERMIT HAS BEEN | | | ISSUED, THE SUBCONTRACTORS CAN THEN SUBMIT SHOP | | | DRAWINGS (CONFORMING TO THE ENGINEERED CONSTRUCTION | | | DOCUMENTS) FOR A SUB-PERMIT. | | | PLEASE REVIEW THE REQUIREMENTS UNDER FSS 61-G TO ENSURE | | | THAT ALL RELEVANT DETAILS FOR BOTH THE FIRE ALARM AND | | | FIRE SPRINKLER DRAWINGS ARE PROVIDED. | | | | | | A) THERE ARE NO ENGINEERED DOCUMENTS PROVIDED FOR THE | | | FIRE ALARM SYSTEM. | | | | | | B) IT APPEARS THAT SOME OF THE REQUIRED FIRE SPRINKLER | | | DETAILS ARE MISSING. SPECIFICALLY: PER FLORIDA | | | ADMINISTRATIVE CODE SECTION 61G15-32.004, FIRE | | | PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE | | | POINT OF SERVICE FOR THE WATER SUPPLY AND WATER SUPPLY | | | DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA). | | | | | | | | | | | | REVIEW NOTES: | | | | | | 2) PER NFPA 241 SECTION 8.7.2.3, WHERE UNDERGROUND | | | WATER MAINS AND HYDRANTS ARE TO BE PROVIDED, THEY SHALL | | | BE INSTALLED, COMPLETED, AND IN SERVICE PRIOR TO | | | CONSTRUCTION WORK. | | | | | | 3) SEPARATE PLANS AND PERMITS ARE REQUIRED FOR THE | | | INSTALLATION OR MODIFICATION OF THE FIRE SPRINKLER | | | SYSTEM AND/OR FIRE ALARM SYSTEM. | | | | | | 4) SEPARATE PLANS AND PERMITS NEEDED FOR PRIVATE | | | UNDERGROUND FIRE LINE AND FIRE HYDRANTS. | | | | | | 5) EVERY ASSEMBLY OCCUPANCY ROOM NOT HAVING FIXED SEATS | | | SHALL HAVE THE OCCUPANT LOAD OF THE ROOM POSTED IN A | | | CONSPICUOUS PLACE NEAR THE MAIN EXIT FROM THE ROOM. | | | SIGNS SHALL BE DURABLE AND INDICATE THE NUMBER OF | | | OCCUPANTS PERMITTED FOR EACH ROOM. | | | | | | | | | SUE ELLEN CALDERON | | | ASSISTANT FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
4 |
Status |
P |
Date |
2019-08-28 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-08-28 |
Time |
16:09 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2019-08-28 |
Time |
16:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
3 |
Status |
F |
Date |
2019-06-05 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-06-05 |
Time |
11:06 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2019-05-20 |
Time |
08:44 |
Sent To |
|
|
| Notes |
| 2019-06-05 11:07:01 | 3RD REVIEW: 18081528 | | | 2017 FLORIDA BUILDING CODE 6TH EDITION | | | 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH | | | EDITION | | | | | | GAS COMMENTS: SPECIFICATIONS SHALL BE SUBMITTED BEFORE | | | A GAS PERMIT WILL BE ISSUED | | | | | | 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017 | | | FBC-FUEL GAS CODE SEC.304.1, 614.6 | | | OR 2017 FBC-RES. SEC.G 2407.1 AND G2439.4 . NEED | | | CALCULATIONS FOR RANGES IN CATERING KITCHEN | | | APPLICANT?S RESPONSE: CATERING KITCHEN RANGE HAS BEEN | | | REMOVED FROM PROJECT. PLEASE REFER TO SHEET | | | P-241. RANGE IS STILL SHOWN ON PLAN | | | | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2019-02-13 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-02-13 |
Time |
09:59 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2019-02-13 |
Time |
09:59 |
Sent To |
|
|
| Notes |
| 2019-02-13 11:10:54 | | | | 2ND REVIEW: | | | 2017 FLORIDA BUILDING CODE 6TH EDITION | | | 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH | | | EDITION | | | | | | GAS COMMENTS: PREVIOUS COMMENTS | | | 1. COMPLIED | | | 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017 | | | FBC-FUEL GAS CODE SEC.304.1, 614.6 (CLOTHES DRYERS) OR | | | 2017 FBC-RES. SEC.G 2407.1 AND G2439.4 (CLOTHES | | | DRYERS). NEED CALCULATIONS FOR RANGES IN CATERING | | | KITCHEN | | | 3. SUBMIT TWO COPIES OF A DETAIL SHOWING THE TYPE OF | | | VENT, LOCATION, SIZE, TERMINATION POINT, HEIGHT ABOVE | | | THE ROOF AND ANCHORING DETAILS OF THE GAS VENT(S) PER | | | 2017 FBC-FUEL GAS SECS. 502 THRU 505 OR 2017 FBC-RES. | | | SEC.G2426 THROUGH G2439.WHAT WAS SUBMITTED IS UNCLEAR | | | IN HOW AND WHERE THE VENTS AND INTAKES ARE RUNNING | | | PLEASE PROVIDE ELEVATION DRAWING SHOWING INTAKES AND | | | EXHAUST LOCATION THE OPENINGS ALSO DRAWING SHOWING THE | | | LENGTH AND SIZE AND LEVEL ABOVE GROUND FLOOR. ALL SHALL | | | COMPLY WITH MANUFACTURE INSTILLATION GUIDES. | | | | | | 4. SUBMIT TWO COPIES OF THE MANUFACTURER?S | | | SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS | | | EQUIPMENT AND REGULATORS TO VERIFY COMPLIANCE WITH | | | STANDARDS NFPA 54, NFPA 58, AND FBC-2017 FUEL GAS CODE | | | SEC. 402.2, AND 301.3 OR 2017 FBC-RES. SEC. G2404.3. | | | GAS APPLIANCES SHALL BE LISTED AND LABELED. THE | | | INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT | | | SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC | | | SEC.305.1, FBC-RES. SEC.G2408.1. SPECIFICATIONS SHALL | | | BE SUBMITTED BEFORE A GAS PERMIT WILL BE ISSUED. THEY | | | CAN BE DIFFERED FOR THE MASTER BUILDING PERMIT ISSUE IF | | | REQUESTED. | | | | | | NEW COMMENTS | | | 1. LABEL GAS PIPING ON FLOOR PLANS. PER WPB AMEND TO | | | FBC 107.2.1 | | | 2. PROVIDE AN ENLARGE FLOOR PLAN FOR ALL BOILER AND | | | PUMP ROOMS ON THE 1ST AND 23RD FLOORS | | | 3. SHT P-505 THE SECTION OF PIPING BETWEEN THE THE .5LB | | | REGULATOR AND THE FIRST HVAC BOILER SHALL BE A MIN OF | | | 3" ALSO THE SECTION BETWEEN THE TWO POOL HEATERS SHALL | | | BE 11/4" | | | | | | | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2018-12-06 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2018-12-06 |
Time |
11:23 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2018-12-06 |
Time |
11:23 |
Sent To |
|
|
| Notes |
| 2018-12-06 11:24:25 | | | | 1ST REVIEW: | | | 2017 FLORIDA BUILDING CODE 6TH EDITION | | | 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH | | | EDITION | | | | | | GAS COMMENTS: | | | 1. PLEASE PROVIDE SIZING TABLE FOR .5 LB. SYSTEM WITH | | | LONGEST LENGTH FROM FURTHEST APPLIANCE. 2017 FBC-FUEL | | | GAS SEC.402.4.1, 402.4.2 | | | 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017 | | | FBC-FUEL GAS CODE SEC.304.1, 614.6 (CLOTHES DRYERS) OR | | | 2017 FBC-RES. SEC.G 2407.1 AND G2439.4 (CLOTHES | | | DRYERS). | | | 3. SUBMIT TWO COPIES OF A DETAIL SHOWING THE TYPE OF | | | VENT, LOCATION, SIZE, TERMINATION POINT, HEIGHT ABOVE | | | THE ROOF AND ANCHORING DETAILS OF THE GAS VENT(S) PER | | | 2017 FBC-FUEL GAS SECS. 502 THRU 505 OR 2017 FBC-RES. | | | SEC.G2426 THROUGH G2439. | | | | | | 4. SUBMIT TWO COPIES OF THE MANUFACTURER?S | | | SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS | | | EQUIPMENT AND REGULATORS TO VERIFY COMPLIANCE WITH | | | STANDARDS NFPA 54, NFPA 58, AND FBC-2017 FUEL GAS CODE | | | SEC. 402.2, AND 301.3 OR 2017 FBC-RES. SEC. G2404.3. | | | GAS APPLIANCES SHALL BE LISTED AND LABELED. THE | | | INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT | | | SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC | | | SEC.305.1, FBC-RES. SEC.G2408.1. | | | | | | | | | | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2019-09-13 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-09-13 |
Time |
05:43 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-07-26 |
Time |
08:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-07-08 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-07-08 |
Time |
07:02 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-05-08 |
Time |
07:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-03-14 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2019-03-14 |
Time |
08:27 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2019-01-14 |
Time |
07:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-12-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-12-20 |
Time |
17:36 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-09-17 |
Time |
17:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
3 |
Status |
P |
Date |
2019-05-30 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-05-30 |
Time |
12:40 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-05-30 |
Time |
12:39 |
Sent To |
|
|
| Notes |
| 2019-05-30 12:40:40 | PASSED UNDER FOUNDATION PERMIT 18040645 | | | NO FEES DUE (PREVIOUS BUILDING WHICH WAS LARGER WAS | | | DEMOLISHED) | | | |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
F |
Date |
2019-02-19 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-02-19 |
Time |
11:42 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-02-19 |
Time |
11:41 |
Sent To |
|
|
| Notes |
| 2019-02-19 11:43:27 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON | | | APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO | | | YOUR PROJECT OR EMAIL IT TO [email protected] . |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2018-11-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-11-15 |
Time |
07:12 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-11-15 |
Time |
07:12 |
Sent To |
|
|
| Notes |
| 2018-11-15 07:14:28 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON | | | APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO | | | YOUR PROJECT OR EMAIL IT TO [email protected] . |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
P |
Date |
2019-08-15 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-08-15 |
Time |
06:22 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2019-08-15 |
Time |
06:22 |
Sent To |
|
|
| Notes |
| 2019-08-15 06:25:33 | MECHANICAL REVIEW | | | | | | APPROVED PER CHRIS COLE (REMOTELY) | | | | | | NOTE: OK TO ISSUE; PLEASE NOTIFY [email protected] |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2019-06-18 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2019-06-18 |
Time |
11:45 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2019-06-11 |
Time |
07:18 |
Sent To |
|
|
| Notes |
| 2019-06-18 11:47:32 | 3RD REVIEW FBC-2017 MECHANICAL | | | PERMIT #18081528 | | | 1515 S FLAGLER DR. | | | 6/19/19 | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | BASED ON THE REVISED PLANS AND COMMENT RESPONSES FROM | | | MANAGED LAND ENTITLEMENTS, PLEASE ADDRESS THESE | | | REMAINING ISSUES. | | | | | | 1) PARKING GARAGES- SHEETS M100, M101A, M101B, M503: | | | A) THE SEQUENCE OF OPERATION FOR THE GARAGE EXHAUST | | | SYSTEM SHALL INDICATE THAT AUTOMATIC OPERATION OF THE | | | SYSTEM SHALL NOT REDUCE THE VENTILATION AIRFLOW RATE | | | BELOW 0.05 CFM PER SQUARE FOOT OF THE FLOOR AREA. THE | | | CURRENT NOTES INDICATE THE FANS WILL OPERATE ONLY BY | | | ACTUATION OF THE SENSORS. CONTINUOUS OPERATION AT THE | | | MINIMUM RATE IS REQUIRED. THE EXHAUST SYSTEMS SHALL | | | ALSO BE IN COMPLIANCE WITH SECTION C403.2.6.2 FBC EC | | | WHICH IS COPIED BELOW: | | | C403.2.6.2 ENCLOSED PARKING GARAGE VENTILATION | | | CONTROLS. ENCLOSED PARKING GARAGES USED FOR STORING OR | | | HANDLING AUTOMOBILES OPERATING UNDER THEIR OWN POWER | | | SHALL EMPLOY CONTAMINATION-SENSING DEVICES AND | | | AUTOMATIC CONTROLS CONFIGURED TO STAGE FANS OR MODULATE | | | FAN AVERAGE AIRFLOW RATES TO 50 PERCENT OR LESS OF | | | DESIGN CAPACITY, OR INTERMITTENTLY OPERATE FANS LESS | | | THAN 20 PERCENT OF THE OCCUPIED TIME OR AS REQUIRED TO | | | MAINTAIN ACCEPTABLE CONTAMINANT LEVELS IN ACCORDANCE | | | WITH FLORIDA BUILDING CODE, MECHANICAL PROVISIONS. | | | FAILURE OF CONTAMINATION SENSING DEVICES SHALL CAUSE | | | THE EXHAUST FANS TO OPERATE CONTINUOUSLY AT DESIGN | | | AIRFLOW. | | | B) INDICATE HOW THE CIRCULATION FANS WILL BE PROTECTED | | | FROM DAMAGE- PROVIDE DETAILS- OR RAISE THE FANS TO THE | | | MINIMUM REQUIRED HEIGHT OF 8?0? FROM F.F. TO BOTTOM OF | | | FAN- SECTION 304.6 FBC M. | | | C) COMMENT #13 FROM THE SECOND REVIEW STILL EXISTS. | | | IMPACT PROTECTION FOR THE GARAGE EXHAUST FANS SHOWN ON | | | M101B & M706 NOT PROVIDED. | | | | | | 2) GENERATOR- SHEETS M101A, P242, & P708: | | | A) AS PREVIOUSLY REQUESTED SHOW THE CLEARANCE DISTANCE | | | MEASUREMENTS FROM THE GENERATOR RADIATOR EXHAUST AND | | | ENGINE EXHAUST OUTLET TO THE ROOM AIR INTAKE LOUVER, | | | AND ANY OTHER OPENINGS OR AIR INTAKES INTO THE | | | BUILDING. | | | B) PROVIDE THE DETAILS AND SPECIFICATIONS FOR THE FUEL | | | TANK AND FUEL PIPING THAT ARE INDICATED ON SHEETS P242 | | | AND P708 ON THE MECHANICAL PLANS, OR NOTE THESE PLAN | | | SHEETS ON M101A TO HELP EXPEDITE THE CONSTRUCTION AND | | | INSPECTION PROCESS. (THE GENERATOR AND THE FUEL SYSTEM | | | ARE MECHANICAL INSPECTIONS). | | | | | | 3) POOL EQUIPMENT ROOM- SHEETS M101A, M603: | | | A) PROVIDE A SEQUENCE OF OPERATION FOR THE EXHAUST | | | SYSTEM. WILL PEEF-2 RUN CONTINUOUSLY? WILL ANY POOL | | | TREATMENT CHEMICALS BE STORED IN THE ROOM? PLEASE | | | REVIEW SECTIONS 510.1, 510.2, 510.7.1, AND 510.7.3 FBC | | | M AND INDICATE COMPLIANCE. | | | B) THE EXHAUST FAN SCHEDULE DOES NOT PROVIDE ANY | | | INFORMATION ABOUT THE FANS IN THE ?REMARKS? COLUMN THAT | | | WOULD INDICATE THE FANS HAVE BEEN TESTED AND RATED FOR | | | GAS BOILER EXHAUST SYSTEMS- SECTION 305.1 FBC FG. | | | C) PROVIDE A UL TESTED AND APPROVED FIRESTOPPING | | | ASSEMBLY FOR THE BOILER VENT FLUE PENETRATIONS THROUGH | | | THE FIRE RATED WALL- SECTION 714 FBC B. | | | D) SHEET 101A INDICATES AN EXHAUST LOUVER TERMINATION | | | FOR THE POOL VENT FLUES- M706 INDICATES A LOCHINVAR | | | TERMINATION KIT FOR AIR INTAKE AND EXHAUST FLUE. | | | | | | 4) KITCHEN: THE COMMENT RESPONSE NARRATIVE INDICATES AN | | | EQUIPMENT SCHEDULE ON SHEET G10 WHICH HAS NOT BEEN | | | PROVIDED- SECTION 107.2.1 WPB. | | | | | | 5) SHEET M102B: THE REQUESTED VENTILATION FOR THE TRASH | | | ROOM NOT PROVIDED- SECTION 502.1 FBC M. | | | | | | 6) SHEETS M106, M107, & M108: AS PREVIOUSLY REQUESTED | | | INDICATE HOW THE TRASHROOMS AND CORRIDORS BY THE | | | STAIRWAYS WILL BE VENTILATED- | | | | | | 7) SHEETS M103, M502: THE SMOKE ANALYSIS DOES NOT | | | SPECIFICALLY CALL OUT SMOKE DETECTORS IN THE STAIRWAY | | | PRESSURIZATION DUCTS ON PAGE 28 OF THE ANALYSIS. SMOKE | | | DETECTORS ARE REQUIRED IN THE ELEVATOR HOISTWAY | | | PRESSURIZATION FAN SYSTEMS- SECTION 909.21.4.2 FBC B, | | | HOWEVER THERE IS NO CORRELATING REQUIREMENT IN THE CODE | | | FOR PRESSURIZED STAIRWAYS, EXCEPT THE REQUIREMENT UNDER | | | SECTION 606.2.1. AS PREVIOUSLY REQUESTED PROVIDE A | | | SEQUENCE OF OPERATION AND CLARIFY HOW WILL THESE | | | DETECTORS WILL INTERACT WITH THE SMOKE CONTROL | | | SEQUENCING PROCEDURES IN THE EVENT OF AN EMERGENCY | | | ALARM. | | | | | | | | | THE FOLLOWING INFORMATION COPIED FOR REFERENCE: | | | | | | 1) COMMISSIONING OF THE MECHANICAL SYSTEMS, SERVICE | | | WATER HEATING SYSTEMS, AND ELECTRICAL POWER AND | | | LIGHTING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC-17 | | | ENERGY CONSERVATION. | | | PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW. | | | | | | C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING | | | SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS. | | | PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS, | | | THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, | | | MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE | | | EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND | | | COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS | | | SECTION. | | | CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE | | | PROVISIONS FOR COMMISSIONING AND COMPLETION | | | REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE | | | PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER | | | REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE | | | GIVEN TO THE OWNER OR OWNER'S AUTHORIZED AGENT AND MADE | | | AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN | | | ACCORDANCE WITH SECTIONS | | | C408.2.4 AND C408.2.5. | | | | | | C408.2.1. COMMISSIONING PLAN. | | | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED | | | DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL | | | ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE | | | FOLLOWING ITEMS: | | | | | | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL | | | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, | | | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF | | | THE ACTIVITIES. | | | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR | | | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO | | | BE PERFORMED. | | | 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED | | | TO, CALIBRATIONS AND ECONOMIZER CONTROLS. | | | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. | | | TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN | | | CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. | | | 5. MEASURABLE CRITERIA FOR PERFORMANCE' | | | | | | 2) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS | | | REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN | | | THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES | | | 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE | | | TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A | | | REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN | | | FIRE PROTECTION ENGINEERING AND/OR MECHANICAL | | | ENGINEERING. | | | PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM, | | | DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED | | | TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR | | | AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED | | | TO BE REVIEWED BY THE WPB BUILDING AND FIRE | | | DEPARTMENTS. | | | PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE | | | PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED | | | BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT | | | SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE | | | DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED | | | IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER) | | | IN THE BUILDING. | | | | | | 3) SEPARATE PERMITS ARE REQUIRED FOR KITCHEN EXHAUST | | | HOODS AND FIRE SUPPRESSION SYSTEMS, WALK-IN COOLERS AND | | | FREEZERS. | | | | | | 4) REQUIRED SUBMITTALS: | | | | | | A) COMMISSION PLAN AND FINAL REPORT. | | | B) SMOKE CONTROL TESTING AND FINAL REPORTS. | | | C) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS. | | | D) MOTORIZED AND BAROMETRIC DAMPERS | | | E) DUCT SMOKE DETECTORS | | | F) EXHAUST AND OUTSIDE AIR LOUVERS INCLUDING | | | MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS | | | AND/OR MIAMI-DADE NOA'S | | | G) C02 AND N02 SENSORS | | | H) COOLING TOWERS | | | I) GENERATOR | | | J) ACCESS PANELS | | | K) DUCT FIRE WRAPPING | | | L) FIRESTOPPING AND FIRE CAULKING | | | M) CONDENSER WATER PIPING AND PIPE INSULATION. | | | N) BOILERS AND WATER HEATERS, PIPING AND INSULATION | | | O) WIND LOAD ENGINEERING FOR THE COOLING TOWER, ROOFTOP | | | FANS AND CURBS, CONDENSERS AND STANDS, INCLUDING FL. | | | PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE | | | STANDS. | | | P) FLAMEBAR DUCTWORK AND INSTALLATION DETAILS. | | | PLEASE NOTE : ALL SUBMITTALS AND SHOP DRAWINGS SHALL | | | BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN | | | PROFESSIONAL OF RECORD. | | | | | | DEFERRED SUBMITTAL: 107.3.4.1 WPB DEFERRED SUBMITTALS. | | | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS | | | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE | | | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT | | | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A | | | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL | | | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE | | | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE | | | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | | OFFICIAL. | | | PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED | | | BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN | | | WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL | | | FOR JURISDICTIONAL APPROVAL. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2019-02-13 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2019-02-13 |
Time |
12:54 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2019-02-06 |
Time |
10:29 |
Sent To |
|
|
| Notes |
| 2019-02-13 12:56:20 | 2ND REVIEW FBC-2017 MECHANICAL | | | PERMIT #18081528 | | | 1515 S FLAGLER DR. | | | 2/12/19 | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) THE REVISED ENERGYGAUGE COMPLIANCE FORM IS STILL | | | MISSING COMPLIANCE DATA FOR THE VERTICAL HEAT PUMPS | | | WITH THE EXCEPTION OF HP-3L-2. | | | | | | 2) SHEET M001: THE REVISED VENTILATION CALCULATIONS ARE | | | NOT IN COMPLIANCE WITH TABLE 403.3.1.1. FBC M, OR | | | ASHRAE 62.1- 2013. | | | A) LOBBY AND RECEPTION ROOMS AND AREAS ARE CALCULATED | | | AT 30 PERSONS PER 1000 SF. | | | B) MEETING & MULTI-PURPOSE- 120 PERSONS PER 1000 SF. | | | C) FITNESS- 40 PERSONS PER 1000 SF. | | | D) LOUNGE- 150 PERSONS PER 1000 SF. | | | PLEASE REFER TO SECTION 403.3.1.1 OUTDOOR AIRFLOW RATE | | | FBC M: | | | VENTILATION SYSTEMS SHALL BE DESIGNED TO HAVE THE | | | CAPACITY TO SUPPLY THE MINIMUM OUTDOOR AIRFLOW RATE, | | | DETERMINED IN ACCORDANCE WITH THIS SECTION. IN EACH | | | OCCUPIABLE SPACE, THE VENTILATION SYSTEM SHALL BE | | | DESIGNED TO DELIVER THE REQUIRED RATE OF OUTDOOR | | | AIRFLOW TO THE BREATHING ZONE. THE OCCUPANT LOAD | | | UTILIZED FOR DESIGN OF THE VENTILATION SYSTEM SHALL BE | | | NOT LESS THAN THE NUMBER DETERMINED FROM THE ESTIMATED | | | MAXIMUM OCCUPANT LOAD RATE INDICATED IN TABLE | | | 403.3.1.1. VENTILATION RATES FOR OCCUPANCIES NOT | | | REPRESENTED IN TABLE 403.3.1.1 SHALL BE THOSE FOR A | | | LISTED OCCUPANCY CLASSIFICATION THAT IS MOST SIMILAR IN | | | TERMS OF OCCUPANT DENSITY, ACTIVITIES AND BUILDING | | | CONSTRUCTION; OR SHALL BE DETERMINED BY AN APPROVED | | | ENGINEERING ANALYSIS. THE VENTILATION SYSTEM SHALL BE | | | DESIGNED TO SUPPLY THE REQUIRED RATE OF VENTILATION AIR | | | CONTINUOUSLY DURING THE PERIOD THE BUILDING IS | | | OCCUPIED, EXCEPT AS OTHERWISE STATED IN OTHER | | | PROVISIONS OF THE CODE. | | | WITH THE EXCEPTION OF SMOKING LOUNGES, THE VENTILATION | | | RATES IN TABLE 403.3.1.1 ARE BASED ON THE ABSENCE OF | | | SMOKING IN OCCUPIABLE SPACES. WHERE SMOKING IS | | | ANTICIPATED IN A SPACE OTHER THAN A SMOKING LOUNGE, THE | | | VENTILATION SYSTEM SERVING THE SPACE SHALL BE DESIGNED | | | TO PROVIDE VENTILATION OVER AND ABOVE THAT REQUIRED BY | | | TABLE 403.3.1.1 IN ACCORDANCE WITH ACCEPTED ENGINEERING | | | PRACTICE. | | | EXCEPTION: THE OCCUPANT LOAD IS NOT REQUIRED TO BE | | | DETERMINED BASED ON THE ESTIMATED MAXIMUM OCCUPANT LOAD | | | RATE INDICATED IN TABLE 403.3.1.1 WHERE APPROVED | | | STATISTICAL DATA DOCUMENT THE ACCURACY OF AN ALTERNATE | | | ANTICIPATED OCCUPANT DENSITY. | | | | | | 4) SHEET M100, M101A & M101B: COMMENT #10 FROM THE 1ST | | | REVIEW CONCERNING MECHANICAL EQUIPMENT INSTALLED BELOW | | | FLOOD ELEVATION WILL STAND UNTIL EVIDENCE OF COMPLIANCE | | | IS PROVIDED BY SUBMITTAL OF THE ELEVATION CERTIFICATE. | | | | | | 5) M100, M101A & B: COMMENT #13B FROM THE 1ST REVIEW IS | | | STILL NOT RESOLVED. REQUIRED EXHAUST VENTILATION FOR | | | BASEMENT AND GROUND FLOOR GARAGES- (32407 + 41182 = | | | 73589 CFMS). TOTAL EXHAUST CAPACITY OF EXHAUST FANS- | | | (70,800 CFMS). PLEASE NOTE THAT SHEET M101B INDICATES | | | THE REQUIRED EXHAUST VENTILATION FOR THE BASEMENT | | | GARAGE TO BE (36258 CFMS), AS OPPOSED TO (32407 CFMS) | | | SHOWN ON SHEET M100. | | | | | | 6) M100, M101A & B: AS NOTED IN 1ST REVIEW COMMENT | | | #13C, THE LOCATIONS OF THE EXHAUST INLETS FOR THE | | | GARAGE EXHAUST DO NOT APPEAR TO BE IN THE AREAS OF THE | | | HEAVIEST CONCENTRATIONS OF CONTAMINANTS BECAUSE THEY | | | ARE LOCATED ONLY ON THE EAST SIDE OF THE GARAGES. IT IS | | | ACKNOWLEDGED THAT THE NEW CIRCULATION FANS MAY HELP TO | | | MOVE THE CONTAMINATED AIR FROM THE WEST END TO THE | | | EAST, HOWEVER THIS WILL HAVE TO BE CONFIRMED BY FIELD | | | TESTING WHICH WILL BE REQUIRED FOR FINAL APPROVAL. | | | | | | 7) M100: PLEASE CLARIFY THE RESPONSE TO COMMENT #13F | | | CONCERNING THE FD'S IN THE AIR SHAFT. THE NARRATIVE | | | STATES THERE IS "NO SEQUENCE OF OPERATIONS". PLEASE | | | EXPLAIN WHAT WILL CAUSE THE DAMPERS TO CLOSE- FUSIBLE | | | LINK? | | | | | | 8) M100 & M101A: THE LOCATION OF THE BASEMENT AIR SHAFT | | | OPENING DOES NOT APPEAR TO HAVE A MINIMUM 10' CLEARANCE | | | FOR THE GARAGE DRIVEWAY AREA- SEE SECTION 401.4 (2) FBC | | | M. | | | | | | 9) M100, M101A & B: THE GARAGE CIRCULATION FANS SHALL | | | BE INSTALLED A MINIMUM OF 8' ABOVE THE FINISHED FLOOR | | | OF THE GARAGE. THE NOTE ON THE PLAN INDICATES 7'0" | | | HIGH. | | | | | | 10) M101A: ADDITIONAL INFORMATION AND SPECIFICATIONS | | | FOR THE GENERATOR ARE REQUIRED. | | | A) SEE TABLE 4.1(A) AND 4.2 NFPA 110-2013 AND INDICATE | | | THE"CLASSIFICATION" OF THE EMERGENCY GENERATOR (EPSS). | | | B) SEE TABLE 4.1(B) AND SECTION 4.3 AND INDICATE THE | | | "TYPE" OF EPSS. | | | C) SEE SECTION 4.4 AND INDICATE WHICH "LEVEL" EPSS | | | SYSTEM IS TO BE INSTALLED- LEVEL 1 OR LEVEL 2. | | | D) VERIFY COMPLIANCE WITH SECTION 7.7.1 WHICH REQUIRES | | | THE VENTILATION AIRFLOW FOR THE EPS ROOM TO BE CAPABLE | | | OF LIMITING THE MAXIMUM AIR TEMPERATURE AIR TEMPERATURE | | | IN THE ROOM PER MANUFACTURER'S RECOMMENDATIONS. | | | E) INDICATE THE EPSS STANDBY LOADS AND EMERGENCY LOADS | | | AS OUTLINED IN SECTIONS 403.4.8.3 AND 403.4.8.4 FBC B. | | | F) INDICATE WHICH STANDARD WAS USED TO CALCULATE THE | | | AIR CHANGES IN THE EPSS ROOM. | | | G) VERIFY THERE WILL BE A MINIMUM 10' CLEARANCE | | | PROVIDED FROM THE RADIATOR DISCHARGE TO THE AIR INTAKE | | | LOUVER. | | | H) VERIFY MINIMUM 10' CLEARANCE FROM THE ENGINE EXHAUST | | | PIPE TERMINATION TO ANY AIR INTAKES INTO THE BUILDING. | | | I) FUEL OIL TANK: SHOW THE TYPE AND SIZE OF TANK VENT | | | PIPE, SHOW THE PIPE RUN AND TERMINATION LOCATION. | | | J) FUEL OIL FILL PIPING: SHOW THE TYPE AND SIZE OF FILL | | | PIPING, EXTERIOR FILL PIPE LOCATION, AND PIPING RUN TO | | | THE TANK. | | | | | | 11) M101A, POOL EQUIPMENT ROOM: | | | A) PROVIDE EQUIPMENT SCHEDULES FOR THE POOL BOILERS. | | | THE BOILERS ARE ASSUMED TO BE GAS-FIRED BASED ON THE 6" | | | FLUES. AS PREVIOUSLY NOTED A VESTIBULE IS REQUIRED | | | BETWEEN THE EQUIPMENT ROOM AND THE GARAGE. | | | 305.3.2 PARKING GARAGES. CONNECTION OF A PARKING GARAGE | | | WITH ANY ROOM IN WHICH THERE IS A FUEL-FIRED APPLIANCE | | | SHALL BE BY MEANS OF A VESTIBULE PROVIDING A | | | TWO-DOORWAY SEPARATION, EXCEPT THAT A SINGLE DOOR IS | | | PERMITTED WHERE THE SOURCES OF IGNITION IN THE | | | APPLIANCE ARE ELEVATED IN ACCORDANCE WITH SECTION | | | 305.3. EXCEPTION: THIS SECTION SHALL NOT APPLY TO | | | APPLIANCE INSTALLATIONS COMPLYING WITH SECTION 305.4. | | | B) IT APPEARS THAT COMBUSTION AIR FOR THE BOILERS IS | | | BEING TAKEN FROM THE ENCLOSED GARAGE WHICH IS | | | PROHIBITED- SECTION 304.9 FBC FG AND TABLE 403.3.1.1 | | | FBC M. | | | C) THERE APPEARS TO BE A LOUVERED OPENING IN THE EAST | | | SIDE OF THE EQUIPMENT ROOM WHICH WOULD REQUIRE A FIRE | | | DAMPER, HOWEVER THIS OPENING IS NOT PERMITTED TO | | | PROVIDE MAKEUP AIR FROM THE ENCLOSED GARAGE FOR PEEF-2, | | | OR COMBUSTION AIR FOR THE BOILERS BECAUSE EACH MUST BE | | | TAKEN FROM THE OUTDOORS AS PREVIOUSLY NOTED ABOVE. | | | D) PLEASE INDICATE WHICH STANDARD OR METHOD WAS USED | | | FOR THE POOL EQUIPMENT ROOM EXHAUST VENTILATION | | | CALCULATION. | | | E) INDICATE THE TYPE OF VENT FLUE PIPING AND EXHAUST | | | DUCT TO BE INSTALLED. | | | F) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE POOL | | | HEATERS AND FLUE PIPING. (MAY BE DEFERRED SUBMITTALS | | | | | | 12) M101A, M101B B, M-708: COMMENTS #19A, 22, 23 & 24 | | | FROM THE 1ST REVIEW ARE STILL NOT RESOLVED. FIRE | | | DAMPERS ARE NOT SHOWN FOR THE EF-IL-4 & 5 EXHAUST DUCTS | | | PENETRATING THE 2HR FIRE-RATED EXTERIOR WALLS OF THE | | | WATER PUMP ROOM. PROVIDE EXHAUST VENTILATION | | | CALCULATIONS AND THE SEQUENCES OF OPERATIONS FOR | | | EF-1L-2, 3, 4 & 5. | | | | | | 13) M-101B, & M-706: IMPACT PROTECTION FOR THE GARAGE | | | EXHAUST FANS NOT PROVIDED- 9N-3 FAC. | | | | | | 14) M102A: IT IS NOT CLEAR WHERE THE POOL EXHAUST DUCT | | | AND BOILER VENT FLUES ARE TERMINATING. PLEASE PROVIDE | | | NOTES AND DETAILS TO CLARIFY. A) INDICATE HOW THE DUCT | | | AND FLUE WILL BE SUPPORTED AND ANCHORED TO RESIST WIND | | | PRESSURES- SECTION 301.15 FBC M. | | | | | | 15) M102A: COMMENT #26 FROM THE 1ST REVIEW NOT | | | RESOLVED- IDENTIFY THE ROOM TO THE WEST OF CHNG RM | | | 1134. | | | | | | 16) M102A, M102B: COMMENT #27 FROM THE 1ST REVIEW NOT | | | RESOLVED- VENTILATION FOR THE TRASH ROOM NOT PROVIDED. | | | | | | 17) M102B: THE NARRATIVE RESPONSE TO COMMENT #30 | | | INDICATES A NEW UPDATED PLAN SHEET WAS UPLOADED, | | | HOWEVER THIS SHEET WAS NOT PROVIDED. | | | | | | 18) M103: COMMENT #33 FROM THE 1ST REVIEW NOT RESOLVED. | | | THE NARRATIVE STATES ALL "TO BE PROVIDED BY THE | | | ARCHITECT", HOWEVER, I AM NOT SEEING ANY ARCHITECTURAL | | | PLANS FOR THE KITCHEN, EQUIPMENT SCHEDULE, OR THE | | | REQUESTED AIR BALANCE CALCULATION. | | | | | | 19) M103: COMMENTS #33 & 34 WILL STAND UNTIL FURTHER | | | INFORMATION ABOUT THE KITCHEN IS PROVIDED. | | | | | | 20) M104, 106, 107, & 108: COMMENTS #36 & 37 FROM THE | | | 1ST REVIEW STILL NOT RESOLVED- THE PLAN SHEETS HAVE NOT | | | BEEN UPDATED. | | | | | | 21) M104: COMMENT #38 NOT RESOLVED. FD'S MISSING FOR | | | O/A DUCTS PENETRATING FIRE-RATED CORRIDOR WALLS AT | | | FOYER 643 AND ELECT RM 403. | | | | | | 22) M107 & M701: COMMENT #39 FROM THE 1ST REVIEW NOT | | | RESOLVED. PLEASE PROVIDE AN ENLARGED PLAN FOR THE | | | BOILER ROOM SHOWING THE LOCATIONS OF ALL EQUIPMENT AND | | | WORKING CLEARANCES. INCLUDE AN EQUIPMENT SCHEDULE AND | | | SUBMIT SPECS FOR ALL EQUIPMENT. A) PROVIDE VENTILATION | | | FOR THE ROOM. | | | | | | 23) M707 & M103: COMMENT #40 FROM THE 1ST REVIEW NOT | | | RESOLVED. PROVIDE DETAILS SHOWING HOW THE | | | PRESSURIZATION DUCTS WILL CONNECT INTO THE INTERIOR | | | EXIT STAIRWAYS AND HOISTWAYS. WILL FSD'S BE INSTALLED | | | AT THESE LOCATIONS? WILL FLAMEBAR BE USED OR DUCTS | | | ENCLOSED WITH 2HR FIRE-RATED DUCTWRAP? | | | | | | 24) M103: THE SMOKE DETECTORS SHOWN IN THE | | | PRESSURIZATION DUCTS ARE NOT INCLUDED IN THE SLS SMOKE | | | CONTROL REPORT. PLEASE CONSULT WITH THE SMOKE CONTROL | | | ENGINEER AND HAVE THE REPORT REVISED, AND PROVIDE NOTES | | | ON THE PLAN TO CLARIFY THEIR SEQUENCE OF OPERATION. | | | | | | 25) M109: COMMENT #41 FROM THE 1ST REVIEW NOT RESOLVED. | | | DS DETECTORS REQUIRED IN THE SUPPLY SYSTEMS OF THE | | | 5-TON HP'S. | | | | | | 26) M110: COMMENT #42- IT IS ACKNOWLEDGED THAT WIND | | | LOAD ENGINEERING WILL BE DEFERRED. | | | | | | 27) M110: THE SMOKE DETECTORS SHOWN IN THE | | | PRESSURIZATION DUCTS ARE NOT INCLUDED IN THE SLS SMOKE | | | CONTROL REPORT. PLEASE CONSULT WITH THE SMOKE CONTROL | | | ENGINEER AND HAVE THE REPORT REVISED, AND PROVIDE NOTES | | | ON THE PLAN TO CLARIFY THEIR SEQUENCE OF OPERATION. | | | PLEASE NOTE ACCORDING TO THE REPORT, SMOKE DETECTORS | | | ARE REQUIRED AT THE TOP OF THE HOISTWAY ENCLOSURES. | | | | | | 28) M220-229 A: COMMENT #44 NOTE RESOLVED. A) EVIDENCE | | | OF UL LISTING AND LABELING FOR THE MIELE ELECTRIC | | | COOKING APPLIANCES AND RANGE HOOD NOT PROVIDED- SECTION | | | 917.1 AND 505.1 EXCEPTION 1 FBC M. B) EVIDENCE OF ANSI | | | TESTING APPROVAL FOR THE GAS-FIRED COOKING APPLIANCES | | | NOT PROVIDED- SECTION 623.1 FBC FG. C) EVIDENCE OF UL | | | LISTING AND LABELING FOR THE VENTLESS DRYERS NOT | | | PROVIDED, AND INSTALLATION INSTRUCTIONS ARE REQUIRED- | | | SECTION 504.21 EXCEPTION FBC M. PLEASE CLARIFY WHY | | | SPECS FOR VENTLESS DRYERS HAVE BE SUBMITTED BUT THE | | | PLANS SHOW DYER EXHAUST DUCT RUNS | | | | | | 29) M222: COMMENT #45B NOT RESOLVED. PROVIDE RETURN AIR | | | FROM BEDROOM #2. | | | | | | 30) M224: COMMENT #45D NOT RESOLVED. THE TRANSFER | | | GRILLS ARE STILL UNDERSIZED- SEE SECTION 601.6 | | | EXCEPTIONS 2 & 3. PLEASE NOTE THE KITCHEN EXHAUST FAN | | | IS MISSING- SEE TABLE 403.3.1.1 FBC M. | | | | | | 31) M227: COMMENT #45G NOT RESOLVED. THE MASTER BEDROOM | | | TRANSFER GRILL IS UNDERSIZED- SEE SECTION 601.6 | | | EXCEPTIONS 2 & 3. | | | | | | 32) M229: COMMENT 45H-3, 4, & 5 NOT RESOLVED- PLEASE | | | COMPLY. 3) PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY | | | SYSTEM OF HP-H. 4) LABEL ALL THE HP'S IN THE SPACE. 5) | | | BEDROOM #2 & 3 TRANSFER DUCTS ARE UNDERSIZED. | | | | | | 33) M502: COMMENTS #55 & 56 PRINTED BELOW NOT RESOLVED- | | | THE UPDATED PLANS WAS NOT SUBMITTED. | | | | | | 54) M502: THE DUCTWORK CONNECTING THE PRESSURIZATION | | | FANS TO THE SHAFTS SHALL BE FIRE-RATED PER SECTION- | | | 909.21.3 FBC B. | | | | | | 55) M502: THE HOISTWAY SHAFT VENTS SHALL BE PROVIDED | | | WITH CLASS I MOTORIZED DAMPERS WITH A MAXIMUM LEAKAGE | | | RATE OF 4 CFM/FT2 AT 1.0 INCH WATER GAUGE (W.G.) (249 | | | PA) WHEN TESTED IN ACCORDANCE WITH AMCA 500D- SECTION | | | C403.2.4.3 FBC M. | | | | | | COMMENTS LISTED BELOW FROM THE 1ST REVIEW ARE COPIED | | | FOR REFERENCE. | | | PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL | | | CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE | | | PROJECT WILL BE REQUIRED TO ATTEND A MEETING AT THE WPB | | | BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL | | | INSPECTOR , PLANS EXAMINER, AND OTHERS- TO DISCUSS | | | TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE | | | DEFERRED SUBMITTAL PROCESS. | | | | | | 1) COMMISSIONING OF THE MECHANICAL SYSTEMS, SERVICE | | | WATER HEATING SYSTEMS, AND ELECTRICAL POWER AND | | | LIGHTING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC-17 | | | ENERGY CONSERVATION. | | | PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW. | | | C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING | | | SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS. | | | PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS, | | | THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, | | | MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE | | | EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND | | | COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS | | | SECTION. | | | CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE | | | PROVISIONS FOR COMMISSIONING AND COMPLETION | | | REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE | | | PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER | | | REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE | | | GIVEN TO THE OWNER OR OWNER'S AUTHORIZED AGENT AND MADE | | | AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN | | | ACCORDANCE WITH SECTIONS | | | C408.2.4 AND C408.2.5. | | | | | | C408.2.1. COMMISSIONING PLAN. | | | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED | | | DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL | | | ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE | | | FOLLOWING ITEMS: | | | | | | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL | | | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, | | | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF | | | THE ACTIVITIES. | | | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR | | | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO | | | BE PERFORMED. | | | 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED | | | TO, CALIBRATIONS AND ECONOMIZER CONTROLS. | | | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. | | | TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN | | | CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. | | | 5. MEASURABLE CRITERIA FOR PERFORMANCE' | | | | | | 2) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS | | | REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN | | | THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES | | | 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE | | | TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A | | | REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN | | | FIRE PROTECTION ENGINEERING AND/OR MECHANICAL | | | ENGINEERING. | | | PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM, | | | DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED | | | TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR | | | AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED | | | TO BE REVIEWED BY THE WPB BUILDING AND FIRE | | | DEPARTMENTS. | | | PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE | | | PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED | | | BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT | | | SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE | | | DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED | | | IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER) | | | IN THE BUILDING. | | | | | | 3) SEPARATE PERMITS ARE REQUIRED FOR KITCHEN EXHAUST | | | HOODS AND FIRE SUPPRESSION SYSTEMS, WALK-IN COOLERS AND | | | FREEZERS. | | | | | | 4) REQUIRED SUBMITTALS: | | | | | | A) COMMISSION PLAN AND FINAL REPORT. | | | B) SMOKE CONTROL TESTING AND FINAL REPORTS. | | | C) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS. | | | D) MOTORIZED AND BAROMETRIC DAMPERS | | | E) DUCT SMOKE DETECTORS | | | F) EXHAUST AND OUTSIDE AIR LOUVERS INCLUDING | | | MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS | | | AND/OR MIAMI-DADE NOA'S | | | G) C02 AND N02 SENSORS | | | H) COOLING TOWERS | | | I) GENERATOR | | | J) ACCESS PANELS | | | K) DUCT FIRE WRAPPING | | | L) FIRESTOPPING AND FIRE CAULKING | | | M) CONDENSER WATER PIPING AND PIPE INSULATION. | | | N) BOILERS AND WATER HEATERS, PIPING AND INSULATION | | | O) WIND LOAD ENGINEERING FOR THE COOLING TOWER, ROOFTOP | | | FANS AND CURBS, CONDENSERS AND STANDS, INCLUDING FL. | | | PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE | | | STANDS. | | | P) FLAMEBAR DUCTWORK AND INSTALLATION DETAILS. | | | PLEASE NOTE : ALL SUBMITTALS AND SHOP DRAWINGS SHALL | | | BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN | | | PROFESSIONAL OF RECORD. | | | | | | DEFERRED SUBMITTAL: 107.3.4.1 WPB DEFERRED SUBMITTALS. | | | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS | | | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE | | | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT | | | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A | | | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL | | | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE | | | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE | | | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | | OFFICIAL. | | | PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED | | | BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN | | | WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL | | | FOR JURISDICTIONAL APPROVAL | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | | | | | | | | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2018-11-01 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-11-01 |
Time |
10:27 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-10-31 |
Time |
10:27 |
Sent To |
|
|
| Notes |
| 2018-11-01 10:47:34 | | | | 1ST REVIEW FBC-2017 MECHANICAL | | | PERMIT #18081528 | | | 1515 S FLAGLER DR. | | | 10/31/18 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES | | | THAT ARE LISTED BELOW. | | | COMMENTS #1-4 ADDRESS APPROVED SUBMITTALS THAT WILL BE | | | REQUIRED IN ORDER TO RECEIVE A FINAL MECHANICAL | | | INSPECTION APPROVAL AND CO FOR THE PROJECT. | | | PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL | | | CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE | | | PROJECT WILL BE REQUIRED TO ATTEND A MEETING AT THE WPB | | | BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL | | | INSPECTOR , PLANS EXAMINER, AND OTHERS- TO DISCUSS | | | TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE | | | DEFERRED SUBMITTAL PROCESS. | | | | | | 1) COMMISSIONING OF THE MECHANICAL SYSTEMS, SERVICE | | | WATER HEATING SYSTEMS, AND ELECTRICAL POWER AND | | | LIGHTING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC-17 | | | ENERGY CONSERVATION. | | | PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW. | | | | | | C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING | | | SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS. | | | PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS, | | | THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, | | | MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE | | | EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND | | | COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS | | | SECTION. | | | CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE | | | PROVISIONS FOR COMMISSIONING AND COMPLETION | | | REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE | | | PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER | | | REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE | | | GIVEN TO THE OWNER OR OWNER'S AUTHORIZED AGENT AND MADE | | | AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN | | | ACCORDANCE WITH SECTIONS | | | C408.2.4 AND C408.2.5. | | | | | | C408.2.1. COMMISSIONING PLAN. | | | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED | | | DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL | | | ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE | | | FOLLOWING ITEMS: | | | | | | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL | | | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, | | | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF | | | THE ACTIVITIES. | | | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR | | | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO | | | BE PERFORMED. | | | 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED | | | TO, CALIBRATIONS AND ECONOMIZER CONTROLS. | | | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. | | | TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN | | | CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. | | | 5. MEASURABLE CRITERIA FOR PERFORMANCE' | | | | | | 2) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS | | | REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN | | | THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES | | | 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE | | | TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A | | | REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN | | | FIRE PROTECTION ENGINEERING AND/OR MECHANICAL | | | ENGINEERING. | | | PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM, | | | DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED | | | TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR | | | AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED | | | TO BE REVIEWED BY THE WPB BUILDING AND FIRE | | | DEPARTMENTS. | | | PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE | | | PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED | | | BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT | | | SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE | | | DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED | | | IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER) | | | IN THE BUILDING. | | | | | | 3) SEPARATE PERMITS ARE REQUIRED FOR KITCHEN EXHAUST | | | HOODS AND FIRE SUPPRESSION SYSTEMS, WALK-IN COOLERS AND | | | FREEZERS. | | | | | | 4) REQUIRED SUBMITTALS: | | | | | | A) COMMISSION PLAN AND FINAL REPORT. | | | B) SMOKE CONTROL TESTING AND FINAL REPORTS. | | | C) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS. | | | D) MOTORIZED AND BAROMETRIC DAMPERS | | | E) DUCT SMOKE DETECTORS | | | F) EXHAUST AND OUTSIDE AIR LOUVERS INCLUDING | | | MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS | | | AND/OR MIAMI-DADE NOA'S | | | G) C02 AND N02 SENSORS | | | H) COOLING TOWERS | | | I) GENERATOR | | | J) ACCESS PANELS | | | K) DUCT FIRE WRAPPING | | | L) FIRESTOPPING AND FIRE CAULKING | | | M) CONDENSER WATER PIPING AND PIPE INSULATION. | | | N) BOILERS AND WATER HEATERS, PIPING AND INSULATION | | | O) WIND LOAD ENGINEERING FOR THE COOLING TOWER, ROOFTOP | | | FANS AND CURBS, CONDENSERS AND STANDS, INCLUDING FL. | | | PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE | | | STANDS. | | | P) FLAMEBAR DUCTWORK AND INSTALLATION DETAILS. | | | PLEASE NOTE : ALL SUBMITTALS AND SHOP DRAWINGS SHALL | | | BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN | | | PROFESSIONAL OF RECORD. | | | | | | DEFERRED SUBMITTAL: 107.3.4.1 WPB DEFERRED SUBMITTALS. | | | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS | | | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE | | | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT | | | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A | | | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL | | | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE | | | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE | | | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | | OFFICIAL. | | | PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED | | | BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN | | | WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL | | | FOR JURISDICTIONAL APPROVAL. | | | | | | 5) ENERGYGAUGE COMPLIANCE FORM SUBMITTAL: PLEASE REVIEW | | | THE FORM AND COMPARE WITH THE AC SCHEDULES ON SHEETS | | | M601 & M602. IN ADDITION TO THE SYSTEMS' | | | IDENTIFICATIONS (ID'S) LISTED IN THE FORM NOT MATCHING | | | THE ID'S LISTED IN THE SCHEDULES, THERE ARE NUMEROUS | | | INCONSISTENCIES AND SYSTEM OMISSIONS. | | | | | | A) THE OAU IS LISTED AS AN RTU AND HAS INCORRECT | | | COMPLIANCE DATA-CAPACITY AND DESIGN EFFICIENCY. | | | B) NO COMPLIANCE DATA IS LISTED FOR THE BOILERS AND | | | PIPING. | | | C) NO COMPLIANCE DATA FOR HP-H. | | | D) NO COMPLIANCE DATA FOR THE HORIZONTAL HP'S, AND THE | | | VERTICAL 8, 18, & 25 TON HP'S- SEE SHEET M602. | | | E) COOLING TOWER EFFICIENCY IS NOT CONSISTENT WITH THE | | | PROCEDURE DESCRIBED IN TABLE C403.2.3(8). | | | | | | 6) SHEET M001 THERE ARE NO VENTILATION RATES OR OUTDOOR | | | CFM VALUES LISTED IN THE ASHRAE VENTILATION TABLE- | | | PLEASE SEE TABLE 403.3.1.1 FBC M. | | | | | | 7) THE OAU THAT IS LOCATED ON THE 3RD FLOOR IS | | | MISLABELED AS AN ENERGY RECOVERY RTU IN THE SCHEDULE, | | | HOWEVER IS NOT AN RTU AND DOES NOT APPEAR TO BE | | | EQUIPPED WITH ENERGY RECOVERY. | | | | | | 8) M602: IN THE HP SCHEDULES PLEASE PROVIDE A SYSTEM ID | | | IN THE TAG COLUMN LINES. | | | | | | 9) M602: A MANUFACTURER'S SUBMITTAL AND WIND LOAD | | | ENGINEERING FOR THE COOLING TOWERS IS REQUIRED IN | | | ACCORDANCE WITH SECTIONS 908.1 AND 301.15 FBC M. PLEASE | | | NOTE THE SPECS FOR THE TOWERS SHALL INDICATE THE UNITS | | | ARE LISTED IN ACCORDANCE WITH UL 1995. THE ENGINEERING | | | FOR THE SUPPORT STRUCTURE AND INSTALLATION OF THE | | | TOWERS MAY BE DEFERRED IF REQUESTED- SEE COMMENT #3 | | | ABOVE. | | | | | | 10) M100, M101A & M101B: REFER TO SECTION 301.16 FBC M | | | COPIED BELOW AND PROVIDE COMPLIANCE INFORMATION: | | | 301.16. FLOOD HAZARD. | | | FOR STRUCTURES LOCATED IN FLOOD HAZARD AREAS, | | | MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES SHALL BE | | | LOCATED AT OR ABOVE THE ELEVATION REQUIRED BY SECTION | | | 1612 OF THE FLORIDA BUILDING CODE, BUILDING FOR | | | UTILITIES AND ATTENDANT EQUIPMENT. | | | EXCEPTION: MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES | | | ARE PERMITTED TO BE LOCATED BELOW THE ELEVATION | | | REQUIRED BY SECTION 1612 OF THE OF THE FLORIDA BUILDING | | | CODE, BUILDING FOR UTILITIES AND ATTENDANT EQUIPMENT | | | PROVIDED THAT THEY ARE DESIGNED AND INSTALLED TO | | | PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE | | | COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC | | | LOADS AND STRESSES, INCLUDING THE EFFECTS OF BUOYANCY, | | | DURING THE OCCURRENCE OF FLOODING UP TO SUCH ELEVATION. | | | 301.16.1COASTAL HIGH-HAZARD AREAS AND COASTAL A ZONES. | | | IN COASTAL HIGH-HAZARD AREAS AND COASTAL A ZONES | | | MECHANICAL SYSTEMS AND EQUIPMENT SHALL NOT BE MOUNTED. | | | | | | 11) M100: REPLACE KEYNOTES 7 & 8 WITH 1 & 2 TO MATCH | | | THE PLANS. | | | | | | 12) M100: PROVIDE OUTDOOR AIR (O/A) IN THE ELEVATOR | | | LOBBY AND OTHER OCCUPIED STORAGE ROOMS- SEE SECTION | | | 404.3 AND TABLE 403.3.1.1 FBC M. | | | | | | 13) M100, M101A, M101B, M503, M601- PARKING GARAGES: | | | A) LOCATIONS OF THE BASEMENT EXHAUST FANS NOT SHOWN. | | | B) CALCULATIONS INDICATE INADEQUATE VENTILATION WITH | | | ALL 1ST AND 2ND FLOOR FANS OPERATING AT FULL CAPACITY- | | | SEE CALCULATIONS ON M100, M101A & M101B AND SCHEDULE ON | | | M601. | | | C) THE LOCATIONS OF THE GROUND FLOOR EXHAUST FANS DO | | | NOT MEET COMPLIANCE WITH SECTION 502.1.1 FOR HAVING | | | EXHAUST INLETS AT AREAS OF HEAVIEST CONCENTRATIONS OF | | | CONTAMINANTS. | | | D) PROVIDE SUBMITTALS FOR THE CO AND NO2 SENSORS AND | | | CONTROLLER- SEE COMMENT #4 ABOVE. | | | E) PROVIDE CALCULATIONS FOR THE AIR INTAKE LOUVERS AT | | | THE SHAFT AND SUBMITTALS FOR THE LOUVERS AND THE FIRE | | | DAMPERS. | | | F) PROVIDE A SEQUENCE OF OPERATION FOR THE FIRE DAMPERS | | | AT THE SHAFT. | | | G) CLARIFY OR SHOW HOW THE AIR SHAFT IS CONNECTING WITH | | | THE EXTERIOR OF THE BUILDING. | | | E) INDICATE THE HEIGHT FROM THE FINISHED GARAGE FLOORR | | | TO THE BOTTOM SIDES OF THE CIRCULATION FANS- SECTION | | | 304.6. | | | | | | 14) M101A- GENERATOR: | | | A) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | | GENERATOR, EXHAUST PIPE, MUFFLER, THIMBLE, SILENCER- | | | SEE COMMENT #4 ABOVE. | | | B) SUBMIT THE UL 2200 CERTIFICATE OF COMPLIANCE. | | | C) PROVIDE EXHAUST VENTILATION CALCULATIONS AND A | | | SEQUENCE OF OPERATION FOR EF-1L-1. | | | D) PLEASE REVIEW SECTION 7.7.1 NFPA 110. AN AC SYSTEM | | | MAY BE REQUIRED FOR THE GENERATOR ROOM IN ORDER TO | | | LIMIT THE MAXIMUM AIR TEMPERATURE IN THE ROOM TO THE | | | MAXIMUM AMBIENT AIR TEMPERATURE AS REQUIRED BY THE | | | GENERATOR MANUFACTURER. | | | | | | 15) M101A: INDICATE HOW THE POOL EQUIPMENT ROOM WILL BE | | | VENTILATED. PLEASE NOTE THAT IF A FUEL FIRED POOL | | | HEATER IS TO BE INSTALLED IN THE ROOM, COMBUSTION AIR | | | PER SECTION 304 FBC FG IS REQUIRED, AND A VESTIBULE | | | WITH A TWO-WAY DOOR SEPARATION SHALL BE PROVIDED- SEE | | | SECTION 305.3.2 FBC FG AND EXCEPTION. | | | | | | 16) M101A: KEYNOTES #7 & 8 SHOWN AT THE BOTTOM OF THE | | | PLAN SHEET DO NOT APPEAR ON THE ACTUAL PLAN. | | | | | | 17) M101A: NOTE #1 BY HP-1L-1 HAS NO CORRESPONDING TEXT | | | ON THE PLAN SHEET, ALTHOUGH IT APPEARS TO BE | | | IDENTIFYING A REQUIRED O/A INTAKE DAMPER. | | | | | | 18) M101A: PROVIDE VENTILATION FOR THE DOCKMASTER, | | | TRASH HOLDING, AND FIRE COMMAND ROOMS. | | | | | | 19) M101A & M101B: FIRE DAMPERS MISSING AT TRASH ROOM | | | EXHAUST DUCT PENETRATIONS OF THE FIRE-RATED ELEVATOR | | | LOBBY AND PUMP ROOM WALLS- SECTION 607.5.2 FBC M. A) | | | PROVIDE EXHAUST VENTILATION CALCULATIONS AND A SEQUENCE | | | OF OPERATION FOR THE EF-1L-5. B) IT APPEARS THAT THE | | | TRASH EXHAUST DOES NOT TERMINATE TO THE OUTDOORS. | | | | | | 20) M101A & M101B: PROVIDE WIND LOAD ENGINEERING FOR | | | INSTALLATION OF THE EXTERIOR CU'S- SEE COMMENT #4 AND | | | SECTION 301.15 FBC M. | | | | | | 21) M101A & M101B: PROVIDE AN ELEVATION VIEW, AND | | | INSTALLATION DETAILS FOR THE GARAGE EXHAUST FANS ON THE | | | EXTERIOR WALL. | | | | | | 22) M101B: FIRE DAMPER MISSING AT O/A DUCT PENETRATION | | | OF WATER PUMP FIRE RATED WALL- SECTION 607.5.2 FBC M. | | | | | | 23) M101B: PROVIDE AN ENLARGED DRAWING OF THE WATER | | | PUMP ROOM SHOWING ALL REQUIRED WORKING CLEARANCES | | | AROUND THE EQUIPMENT, AND SUBMIT MANUFACTURER?S | | | SPECIFICATIONS FOR THE BOILERS, HEAT EXHANGERS AND THE | | | PUMPS. IT APPEARS NOTE #4 AT THE BOILER SHOULD BE | | | CHANGED TO NOTE #6. | | | | | | 24) M101B: PROVIDE EXHAUST VENTILATION CALCULATIONS FOR | | | THE WATER PUMP ROOM AND A SEQUENCE OF OPERATION FOR | | | EF-1L-4. | | | | | | 25) M100, M101A & M101B: REFER TO SECTIONS 401.4 AND | | | 501.3.1 AND PROVIDE CLEARANCE DISTANCE MEASUREMENTS FOR | | | THE O/A INLETS AND EXHAUST OUTLETS. SUBMIT | | | MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT APPROVALS | | | FOR THE LOUVERS. | | | | | | 26) M102A: PLEASE IDENTIFY ALL ROOMS AND SPACES SHOWN | | | ON THE PLAN. | | | | | | 27) M102A: PROVIDE VENTILATION FOR THE STORAGE, TRASH | | | AND PACKING RMS- TABLE 403.3.1.1 FBC M. | | | | | | 28) M102A: PROVIDE RETURN DUCT SIZES AT HP-2L-1. | | | | | | 29) M102A: PROVIDE EXHAUST VENTILATION CALCULATIONS AND | | | A SEQUENCE OF OPERATION FOR THE EF'S IN THE ROOMS | | | ADJACENT TO THE MECHANICAL ROOM. | | | | | | 30) M102B: IDENTIFY ALL ROOMS AND SPACES ON THE PLANS | | | AND PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE | | | EF'S AND A SEQUENCE OF OPERATION FOR THE FANS. | | | | | | 31) M103: FD MISSING AT 70X26" DUCT PENETRATING | | | FIRE-RATED MECH ROOM (OAU-1) SECTION 607.5.2 FBC M. | | | | | | 32) M103: FD?S MISSING AT 30X20" AND 24X20" RETURN | | | DUCTS PENETRATING FIRE-RATED MECH ROOM WALL (HP-3L-2 | | | AND 3L-3)- SECTION 607.5.2. | | | | | | 33) M103: PROVIDE ENLARGED MECHANICAL PLANS FOR THE | | | PRIVATE DINING/PERFORMANCE KITCHEN AREA- SECTION | | | 107.2.1 WPB, AND SUBMIT MANUFACTURER'S SPECIFICATIONS | | | FOR ALL COOKING APPLIANCES. PLEASE NOTE THAT SEPARATE | | | PERMITS ARE REQUIRED FOR KITCHEN EXHAUST HOODS, HOWEVER | | | AN AIR BALANCE CALCULATION IS REQUIRED ON THE MAIN MECH | | | PLANS- PLEASE PROVIDE. | | | | | | 33) M103: THE PLAN INDICATES THAT AIR FROM THE KITCHEN | | | WILL BE RECIRCULATED TO OTHER ROOMS AND SPACES OUTSIDE | | | OF THE KITCHEN WHICH IS PROHIBITED PER TABLE 403.3.1.1 | | | FBC M FOOTNOTE B | | | | | | 34) M103: EXHAUST VENTILATION AT A RATE OF 0.7 CFMS PER | | | SF. IS REQUIRED FOR THE KITCHEN- TABLE 403.3.1.1 FBC M. | | | | | | 35) M103: SHOW HOW O/A IS BEING PROVIDED TO GUEST | | | SUITES 1 & 2- TABLE 403.3.1.1. | | | | | | 36) M104, 106, 107, 108: VENTILATION REQUIRED FOR THE | | | TRASH ROOMS AND CORRIDORS BY STAIRWELL. | | | | | | 37) M104, 106, 107, 108, 109, 110: THE FSD'S AT THE | | | SHAFTS MUST BE MOTORIZED IN ORDER TO OPERATE IN | | | SEQUENCE WITH THE SMOKE CONTROL SYSTEM- PLEASE PLACE A | | | SYMBOL AT EACH LOCATION. | | | | | | 38) M104: IT APPEARS THAT SOME O/A DUCTS SUPPLYING THE | | | APARTMENT HAVE FD'S AT THE CORRIDOR WALL PENETRATIONS | | | AND OTHERS DO NOT- PLEASE CLARIFY. | | | | | | 39) M-107: PLEASE PROVIDE AN ENLARGED PLAN FOR THE | | | BOILER ROOM SHOWING THE LOCATIONS OF ALL EQUIPMENT AND | | | WORKING CLEARANCES. INCLUDE AN EQUIPMENT SCHEDULE AND | | | SUBMIT SPECS FOR ALL EQUIPMENT. A) PROVIDE VENTILATION | | | FOR THE ROOM. | | | | | | 40) M109: SUBMIT MANUFACTURER'S SPECIFICATIONS AND | | | INSTALLATION INSTRUCTIONS FOR THE FLAMEBAR DUCTWORK, | | | INCLUDING A DETAIL FOR INSTALLATION OF THE FIRE DAMPER | | | IN THE DUCT- SEE COMMENT #4 ABOVE. | | | | | | 41) M109: THE PLAN SHOWS 5-TON AC SYSTEMS WHICH REQUIRE | | | DUCT SMOKE DETECTORS TO BE INSTALLED AT EACH MAIN | | | SUPPLY TRUNK. IN ADDITION THE PLAN APPEARS TO INDICATE | | | A SHARED PLENUM WHICH WILL REQUIRE DUCT SMOKE DETECTORS | | | AT ALL AIR HANDLER LOCATIONS- SECTIONS 606.2.1 & | | | 606.2.2 FBC M. | | | | | | 42) M110: PROVIDE WIND LOAD ENGINEERING DRAWINGS FOR | | | THE ROOFTOP FANS AND CURBS, CONDENSERS AND STANDS, AND | | | ALL REQUIRED DUCT SUPPORTS AND BRACKETS. PLEASE INCLUDE | | | FL. PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE | | | STANDS. SHOW HOW THE FANS AND DUCTS WILL CONNECT TO THE | | | SHAFTS. | | | | | | 43) M110: PROVIDE A SEQUENCE OF OPERATION FOR THE SMOKE | | | DETECTORS IN THE PRESSURIZATION FANS. CLARIFY HOW WILL | | | THESE DETECTORS WILL INTERACT WITH THE SMOKE CONTROL | | | SEQUENCING PROCEDURES. | | | | | | 44) M220, 221, 222, 223, 224, 225, 226, 227, 228, 229: | | | A) SUBMIT SPECS FOR THE CLOTHES DRYERS, RECIRCULATION | | | EXHAUST HOODS, COOKING APPLIANCES AND THE X-VENTS. | | | B) CLARIFY HOW MAKEUP AIR IS BEING PROVIDED FOR THE | | | DRYERS- SECTION 504.6 FBC M. | | | C) VERIFY THAT THE DRYER EXHAUST DUCT IS NOT IN A | | | RETURN AIR PLENUM- SECTION 504.4 | | | D) PROVIDE THE TOTAL LENGTH OF THE DRYER EXHAUST DUCT | | | RUNS- SECTION 504.8.4. | | | E) VERIFY NO COMBUSTIBLES IN AC CLOSETS INCLUDING THE | | | CLOSET DOORS. | | | F) PROVIDE SMOKE DETECTORS IN RETURN AIR PLENUM-RATED | | | AC CLOSETS | | | | | | 45) SHEETS M221, 222, 223, 224, 225, 226, 227, 229, | | | 230: | | | LISTED BELOW ARE DEFICIENCIES IN THE RETURN AIR SYSTEMS | | | OF THE APARTMENTS AND SOME OTHE MISSING INFORMATION | | | REFER TO SECTION 601.6 FBC M ITEMS 1-3 AND CORRECT. | | | | | | A) M221: PROVIDE RETURN AIR FROM THE MASTER BEDROOM. | | | | | | B) M222: PROVIDE RETURN AIR FROM THE BEDROOM 2. | | | | | | C) M223: IDENTIFY ALL ROOMS ON THE PLAN- SECTION | | | 107.2.1 | | | | | | D) M224: 1) IDENTIFY ALL ROOMS ON THE PLAN. 2) THE | | | RETURN TRANSFERS FROM THE BEDROOMS ARE UNDERSIZED. | | | | | | E) M225: MASTER BEDROOM AND BEDROOM #2 TRANSFER DUCTS | | | ARE UNDERSIZED. | | | | | | F) M226: 1) THE PLAN IS CUT-OFF AT THE NORTHEAST. 2) | | | PROVIDE RETURN AIR FROM BEDROOMS 2 & 3. | | | | | | G) M227: A) IDENTIFY ALL ROOMS. B) THE 20X6 TRANSFER | | | GRILL IS UNDERSIZED. | | | | | | H) M229: 1) PROVIDE COMPLETE ROOM IDENTIFICATIONS. 2) | | | PROVIDE RETURN AIR FROM THE YOGA ROOM. 3) PROVIDE A | | | DUCT SMOKE DETECTOR IN THE SUPPLY SYSTEM OF HP-H. 4) | | | LABEL ALL THE HP'S IN THE SPACE. 5) BEDROOM #2 & 3 | | | TRANSFER DUCTS ARE UNDERSIZED. 6) DUCT SMOKE DETECTORS | | | ARE REQUIRED IN THE SUPPLY SYSTEMS OF EACH 5-TON HP- | | | SECTION 606.2.1, AND ALSO IN THE AC CLOSETS IF SHARING | | | THE PLENUM. | | | | | | 53) M230: THE 18X10" AND 16X10" RETURN DUCTS ARE | | | UNDERSIZED. | | | | | | 54) M502: THE DUCTWORK CONNECTING THE PRESSURIZATION | | | FANS TO THE SHALFTS SHALL BE FIRE-RATED PER SECTION- | | | 909.21.3 FBC B. | | | | | | 55) M502: THE HOISTWAY SHAFT VENTS SHALL BE PROVIDED | | | WITH CLASS I MOTORIZED DAMPERS WITH A MAXIMUM LEAKAGE | | | RATE OF 4 CFM/FT2 AT 1.0 INCH WATER GAUGE (W.G.) (249 | | | PA) WHEN TESTED IN ACCORDANCE WITH AMCA 500D- SECTION | | | C403.2.4.3 FBC M. | | | | | | 56) M-701: SOME OF THE REQUESTED WIND LOAD ENGINEERING | | | HAS BEEN PROVIDED HOWEVER THE DETAILS ARE INCOMPLETE | | | AND NO WIND DESIGN CRITERIA HAS BEEN PROVIDED. | | | | | | 57) POST FIRE SMOKE REMOVAL SYSTEM: PROVIDE | | | CALCULATIONS TO VERIFY FAN SIZING IN ACCORDANCE WITH | | | THE SMOKE CONTROL SYSTEM REQUIREMENTS LISTED ON PAGE 29 | | | OF THE REPORT. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
1 |
Status |
P |
Date |
2019-09-06 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-09-06 |
Time |
07:09 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-09-06 |
Time |
07:09 |
Sent To |
|
|
| Notes |
| 2019-09-06 07:09:49 | LETTER OF MAP REVISION BASED ON FILL (LOMR-F) DATED | | | JANURARY 10, 2019, CASE NUMBER 19-04-1248A. PROPERTY | | | AROUND BUILDING WAS REMOVED FROM THE SFHA AND CHANGED | | | TO FLOOD ZONE X. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2019-08-28 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-08-28 |
Time |
15:45 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2019-08-26 |
Time |
17:29 |
Sent To |
|
|
| Notes |
| 2019-08-28 15:49:34 | PROVISO: 18081528 | | | | | | | | | PLEASE COMPLY WITH THE FOLLOWING COMMENTS BEFORE 2ND | | | ROUGH INSPECTION. | | | | | | 1. PLEASE REVISE SHEETS A103 P-103, 241 THEY DO NOT | | | MATCH THE REDESIGN OF THE MEN AND WOMEN BATHROOMS SHOWN | | | ON SHEET A-245 ON SHEET P241 REVISE THE FLOOR PLAN AND | | | ISOMETRIC DRAWING AND ADD THE URINAL ON THE | | | ISOMETRIC.PER WPB AMEND TO FBC 107.2.1 | | | | | | 2. THE REAR GRAB BAR FOR THE COMMON AREA TOILETS SHALL | | | BE 12" AND 24" FROM THE CENTER OF THE TOILET SHT P-245 | | | DETAIL # 11+7 DO NOT COMPLY | | | | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2019-06-05 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-06-05 |
Time |
09:28 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2019-05-20 |
Time |
08:45 |
Sent To |
|
|
| Notes |
| 2019-06-05 09:28:28 | | | | 3RD REVIEW: 18011528 | | | 2017 FLORIDA BUILDING CODE 6TH EDITION | | | 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH | | | EDITION | | | | | | PLUMBING COMMENTS: PREVIOUS COMMENTS. | | | | | | 1. SHT. A-772 DETAIL #12 TYPE 10 BATHROOM, THE CLEAR | | | FLOOR SPACE FOR THE SHOWER SHALL RUN PARALLEL TO THE | | | FIXTURE AND THE END LINE UP WITH THE CONTROL WALL. PER | | | FHA DESIGN MANUAL REQUIREMENT #7 PG. 7.5 | | | | | | 14. SHT. P-502 LABEL ALL WATER PIPING WITH HOT , COLD, | | | RETURN . PER WPB AMEND TO FBC 107.2.1 | | | | | | NEW COMMENTS: | | | | | | 1. SHOWERS IN SPA SHALL COMPLY WITH ANSI 117.1 1986 | | | SEC. 4.21 SHOW COMPLIANCE ON PLAN CONTROLS, GRAB BARS | | | AND CLEAR FLOOR SPACE. | | | | | | 2. THE MEN AND WOMENS BATHROOM ON LEVEL 3 SHALL HAVE A | | | LAVATORY OUT SIDE THE ACCESSIBLE STALL AND IN THE SAME | | | ROOM AS THE REQUIRED WATER CLOSET.PER FBC PL 405.3.2 | | | | | | 3.COMMON AREA BATHROOMS SHOW THE DISTANCE OF THE SIDE | | | WALL GRAB BAR FROM THE REAR WALL OF THE TOILET. ANZI | | | 117.1 1986 SEC 416.4 | | | | | | 4. COMMON AREA BATHROOMS SHOW HEIGHT OF TOILET PER ANZI | | | 117.1 1986 SEC 416.3 | | | | | | 5. COMMON AREA BATHROOMS SHOW DIMENSIONS OF REAR GRAB | | | BARS IN REFERENCE TO CENTER OF TOILET. ANZI 117.1 1968 | | | SEC 416.4 | | | | | | 6. COMMON AREA BATHROOMS SHOW HEIGHT OF TOILET PAPER | | | DISPENSER. ANZI 117.1 1968 SEC 416.6 | | | | | | 7. COMMON AREA BATHROOMS SHOW CENTER OF TOILET OFF SIDE | | | WALL ANZI 117.1 1968 SEC 416.2 | | | | | | 8. SHT. P-502B COMPLY WITH THE FOLLOWING:REQUIRED TO | | | DETERMINE CODE COMPLIANCE. PER WPB AMEND TO FBC 107.2.1 | | | A) EXPAND THE ISOMETRIC DRAWING. | | | B) SHOW FLOOR LEVELS ON ISOMETRIC DRAWING. | | | C) THERE ARE PIPES THAT END WITH NO LABEL OR LOCATION | | | TAG PLEASE LABEL ALL PIPING TERMINATION POINTS SOME | | | EXAMPLES ARE BRANCHES OFF THE FOLLOWING STACKS S/1, | | | S/20, S/4, S/6, S13, S/13, S/12, S/11 | | | D) SHOW THE REQUIRED CLEAN OUTS AT THE BASE OF THE | | | STACKS. | | | | | | 9. SHT. P-502A COMPLY WITH THE FOLLOWING:REQUIRED TO | | | DETERMINE CODE COMPLIANCE. PER WPB AMEND TO FBC 107.2.1 | | | A) PLEASE ORIENTATE THE ISOMETRIC SO THAT THE BOTTOM OF | | | THE DRAWING IS LINED UP WITH THE BOTTOM OF THE PLAN | | | PAGE. | | | B) THERE ARE PIPES THAT END WITH NO LABEL OR LOCATION | | | TAG PLEASE LABEL ALL PIPING TERMINATION POINTS. | | | C) SHOW FLOOR LEVELS ON THE SOILSTACKS NOT JUST VENTS. | | | D) SHOW ALL BRANCHES ON THE SANITARY STACKS FOR EACH | | | FLOOR. | | | E) ARE THE TOP OF THE SOIL STACKS CONNECTING TO THE | | | VENT STACKS IF SO PLEASE SHOW ON THE DRAWING. | | | F) THE TOP OF S/14 SHWS A FLOOR DRAIN THAT IS NOT | | | CONNECTED TO PIPING PLEASE CLARIFY. | | | | | | 10. P-501 PLEASE ORIENTATE ISOMETRIC SO THAT THE BOTTOM | | | OF THE DRAWING IS LINED UP WITH THE BOTTOM OF THE PLAN | | | PAGE. | | | | | | 11. SHT A-774 COMPLY WITH THE FOLLOWING:REQUIRED TO | | | DETERMINE CODE COMPLIANCE. PER WPB AMEND TO FBC 107.2.1 | | | A) DETAIL #4 THE TOILET SHALL BE 18" OFF THE SIDE WALL | | | OR GRAB BAR SIDE FHA REQ. #6 | | | B) DETAIL #4 THE CLEAR FLOOR SPACE PARALLEL TO THE | | | SHOWER AND LINED UP WITH THE CONTROL WALL FHA REQ 7 PG | | | 7.56 | | | C)DETAIL #7 THE TOILET SHALL BE 18" OFF THE SIDE WALL | | | OR GRAB BAR SIDE FHA REQ. #6 | | | D) DETAIL #7 THE CLEAR FLOOR SPACE PARALLEL TO THE | | | SHOWER AND LINED UP WITH THE CONTROL WALL FHA REQ 7 PG | | | 7.56 | | | E) DETAIL #10 THE CLEAR FLOOR SPACE PARALLEL TO THE | | | SHOWER AND LINED UP WITH THE CONTROL WALL FHA REQ 7 PG | | | 7.56 | | | F) DETAIL #10 THE TOILET SHALL BE 18" OFF THE SIDE WALL | | | OR GRAB BAR SIDE FHA REQ. #6 | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2019-02-13 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-02-13 |
Time |
09:58 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2019-02-06 |
Time |
17:08 |
Sent To |
|
|
| Notes |
| 2019-02-13 09:58:43 | | | | 2ND REVIEW: 18011528 | | | 2017 FLORIDA BUILDING CODE 6TH EDITION | | | 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH | | | EDITION | | | | | | PLUMBING COMMENTS: PREVIOUS COMMENTS. | | | 1. COMPLIED | | | 2. COMPLIED | | | A) COMPLIED | | | A) COMPLIED | | | B) LABEL ALL CLEAR FLOOR SPACE WITH DIMENSIONS PER ANSI | | | A117.1-1986 4.17.3 AND4.19.2.2 AND FHA REQUIREMENT #7 | | | ON ALL ENLARGED BATHROOM FLOOR PLANS PLEASE EITHER NOTE | | | NEXT TO OR ON, PLACE THE DIMENSIONS ON THE CLEAR FLOOR | | | SPACE. | | | C) COMPLIED | | | 3. COMPLIED | | | 4. COMPLIED | | | 5. COMPLIED | | | 6. THE LINE FOR THE INTERIOR WALLS AND FIXTURES ARE | | | EXTREMELY LIGHT SOME PLUMBING FIXTURES ARE MISSING ON | | | THE FLOOR PLANS PLEASE DARKEN LINES AND INCLUDE FIXTURE | | | ON ALL FLOOR PLAN SHEETS. PER WPB AMEND TO FBC THE GRID | | | LINES ARE SO DARK AND THE LINES FOR THE WALLS ARE SO | | | LIGHT IT IS EXTREMELY DEFAULT TO READ THE PLAN PLEASE | | | CLARIFY. | | | 7. COMPLIED | | | 8. COMPLIED | | | 9.COMPLIED | | | 10. COMPLIED | | | 11. COMPLIED | | | 12. COMPLIED | | | 13. SHT A-790/ A-791/ A-792 THE DRAWING ARE EXTREMELY | | | LIGHT PLEASE DARKEN. PER WPB AMEND TO FBC 107.2.1 | | | 14. COMPLIED | | | 15. PROVIDE MANUFACTURE SPECIFICATION FOR RUBBERIZED | | | SHOWER PAN LINER TO COMPLY WITH FBC PL 417.5.2- | | | 417.5.2.6 | | | 16. PROVIDE DETAIL FOR EMERGENCY SCUPPER WITH | | | DIMENSIONS. PER WPB AMEND TO FBC 107.2.1SHT. A-809 | | | DETAIL #2 DID NOT GIVE THE WIDTH DIMENSIONS PLEASE | | | CLARIFY. | | | 17. COMPLIED | | | 18. COMPLIED | | | 19. COMPLIED | | | | | | NEW COMMENTS: | | | | | | 1. SHT. A-772 DETAIL #12 TYPE 10 BATHROOM, THE CLEAR | | | FLOOR SPACE FOR THE SHOWER SHALL RUN PARALLEL TO THE | | | FIXTURE AND THE END LINE UP WITH THE CONTROL WALL. PER | | | FHA DESIGN MANUAL REQUIREMENT #7 PG. 7.56 | | | 2. PLEASE SHOW THE CLEAR FLOOR SPACE WITH DIMENSIONS | | | FOR THE TOILETS IN THE FHA BATHROOMS ON THE UNIT | | | BATHROOM PLAN SHEETS. PER FHA DESIGN MANUAL REQ. #7 | | | PG.7.43 | | | 3.SHT A-774 THE GUEST SUITES SHALL COMPLY WITH FAIR | | | HOUSING PLEASE INDICATE DESIGN SPEC FOR THE BATHROOMS A | | | OR B PER FHA DESIGN MANUAL REQUIREMENT #7 | | | 4.SHT. A-221 SHOWS BATHROOM TYPE 2 AS THE FHA SPEC B | | | BATHROOM SHT A-771 SHOWS THE TYPE # AS THE FHA BATHROOM | | | AND SHT G-5 LIST TYPE 3 PLEASE CLARIFY. PER WPB AMEND | | | TO FBC 107.2.1 | | | 5. SHT. A-222 INDICATE ON THE PLAN WHICH IS THE FHA | | | BATHROOM. PER WPB AMEND TO FBC 107.2.1 | | | 6.SHT. A-222 UNIT C IF FHA SPEC A IS USED ALL THE | | | BATHROOMS SHALL COMPLY. PER FHA REQUIREMENT #7 PG. 7.34 | | | AND 7.35 | | | 7.SHT. A-222,223,224,225,226 INDICATE TYPE FHA BATHROOM | | | . PER FHA REQUIREMENT #7 | | | 8.SHT. A-229A INDICATE ON THE PLAN WHICH BATHROOM IS | | | THE FHA BATHROOM PER FHA REQUIREMENT #7 | | | 9. SHT. A-770, 771, 772,773, 774 PLEASE INDICATE ON THE | | | PLAN WHERE THE GRAB BAR BACKING IS REQUIRED ALL | | | BATHROOMS EXCEPT THE POWDER ROOM SHALL HAVE IT. PER FHA | | | DESIGN MANUAL REQ. #6 | | | 10.ANY WING WALL OR VANITY NEXT TO THE TOILET IN THE | | | FHA BATHROOMS SHALL NOT EXTEND OVER 24" FROM THE BACK | | | WALL. PER FHA DESIGN MANUAL REQ. #7 PG. 7.43 | | | 11.PLEASE PROVIDE A DETAIL FOR THE GREASE INTERCEPTOR | | | PIPING AND MOUNTING SYSTEM. PER WPB AMEND TO FBC | | | 107.2.1 | | | 12. PLEASE PROVIDE MANUFACTURE SPECIFICATIONS AND | | | INSTILLATION GUIDE FOR THE GREASE INTERCEPTOR. PER WPB | | | AMEND TO FBC 107.2.1 | | | 13. PROVIDE SIZING CALCULATION FROM THE MANUFACTURE FOR | | | THE GREASE INTERCEPTOR. PER WPB AMEND TO FBC 107.2.1 | | | AND FBC PL 1003.2 | | | 14. SHT. P-502 LABEL ALL WATER PIPING WITH HOT , COLD, | | | RETURN AND UNIT TYPE. PER WPB AMEND TO FBC 107.2.1 | | | 15. SHT P-502 THE SANITARY RISER DIAGRAM IS DO | | | DIFFICULT TO DETERMINE CODE COMPLIANCE PLEASE PROVIDE A | | | 3 DIMENSIONAL ISOMETRIC DRAWING FOR THE UNDERGROUND | | | COLLECTION PIPING AND SEPARATE SOIL STACK ISOMETRICS. | | | PER WPB AMEND TO FBC 107.2.1 | | | 16. FOR THE FUEL OIL SYSTEM PLEASE SUBMIT THE | | | FOLLOWING: | | | A)MANUFACTURES SPECIFICATION FOR ALL EQUIPMENT BEING | | | USED ON FUEL OIL SYSTEM INCLUDING TANK. | | | B) A FLOOR PLAN AND ISOMETRIC DRAWING OF THE PIPING AND | | | TANK. | | | PER WPB AMEND TO FBC 107.2.1 | | | THE FUEL OIL SYSTEM CAN BE SUBMITTED AS A SEPARATE | | | PERMIT IF THAT IS YOUR INTENT PLEASE REMOVE ANY DETAILS | | | OR DRAWING FROM THE MASTER SET. | | | 17. PROVIDE AN ENLARGED FLOOR PLAN FOR ALL BOILER AND | | | PUMP ROOMS ON THE 1ST AND 23RD FLOORS AND PIPING | | | DETAIL. PER WPB AMEND TO FBC 107.2.1 | | | | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-12-06 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2018-12-06 |
Time |
11:21 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2018-11-26 |
Time |
13:00 |
Sent To |
|
|
| Notes |
| 2018-12-06 11:22:10 | 1ST REVIEW: | | | 2017 FLORIDA BUILDING CODE 6TH EDITION | | | 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION | | | 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH | | | EDITION | | | 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH | | | EDITION | | | | | | PLUMBING COMMENTS: | | | 1. PLEASE STATE ON THE PLAN WHICH FHA DOCUMENT YOU ARE | | | USING TO DESIGN THIS PROJECT. PER WPB AMEND TO FBC | | | 107.2.1 | | | 2. ALL COMMON AREA BATHROOMS SHALL COMPLY WITH ANSI | | | A117.1-1986 PLEASE SHOW COMPLIANCE WITH THE FOLLOWING. | | | A) THE SIDE WALL GRAB BAR AT THE TOILET SHALL BE 42 | | | INCHES LONG MINIMUM, LOCATED 12 INCHES MAXIMUM FROM THE | | | REAR WALL AND EXTENDING 54 INCHES MINIMUM FROM THE REAR | | | WALL. PER ANSI A117.1-1986 4.17.6 | | | A) THE REAR WALL GRAB BAR SHALL BE 36 INCHES LONG | | | MINIMUM AND EXTEND FROM THE CENTERLINE OF THE WATER | | | CLOSET 12 INCHES MINIMUM ON ONE SIDE AND 24 INCHES | | | MINIMUM ON THE OTHER SIDE. PER ANSI A117.1-1986 4.17.6 | | | B) LABEL ALL CLEAR FLOOR SPACE WITH DIMENSIONS PER ANSI | | | A117.1-1986 4.17.3 AND4.19.2.2 | | | C) SHOWER STALLS SHALL COMPLY WITH ANSI A117.1-1986 | | | 4.21 | | | 3. PLEASE LABEL ALL COMMON AREA BATHROOMS MEN'S OR | | | WOMEN SEPARATE FACILITIES REQUIRED. PER FBC PL 403.2 | | | 4. PROVIDE PLUMBING FIXTURE COUNT BREAKDOWN PER AREA. | | | WPB AMEND TO FBC 107.2.1 | | | 5. SEPARATE FACILITIES REQUIRED FOR ROOMS 211 AND 213 | | | AND SURROUNDING AREA. PER FBC PL 403.2 | | | 6. THE LINE FOR THE INTERIOR WALLS AND FIXTURES ARE | | | EXTREMELY LIGHT SOME PLUMBING FIXTURES ARE MISSING ON | | | THE FLOOR PLANS PLEASE DARKEN LINES AND INCLUDE FIXTURE | | | ON ALL FLOOR PLAN SHEETS. PER WPB AMEND TO FBC | | | 7. PLEASE PROVIDE A SCHEDULE OF THE FHA BATHROOMS WITH | | | UNIT AND SPEC TYPE MARKED. PER WPB AMEND TO FBC 107.2.1 | | | 8. SHOW THE CLEAR FLOOR SPACE FOR ALL THE FHA | | | LAVATORY?S. PER FHA REQUIREMENT #7 | | | | | | 9. SHT A-771 AND A-772 DETAILS #12 + 17 THE CLEAR FLOOR | | | SPACE FOR THE LAVATORY SEEMS TO BE ENCROACHED BY THE | | | TOILET. PLEASE CLARIFY. PER FHA REQUIREMENT #7 | | | 10. IN THE SPEC B BATHROOMS THE CLEAR FLOOR SPACE FOR | | | THE SHOWERS SHALL LINE UP WITH THE CONTROL WALLS. PER | | | FHA REQUIREMENT #7 | | | 11. WHERE THE DOOR SWING IS INTO THE BATHROOM A 30"X48" | | | CLEAR FLOOR SPACE OUTSIDE OF THE DOOR SWING IS | | | REQUIRED. . PER FHA REQUIREMENT #7 | | | 12. PLEASE PROVIDE ELEVATION OF LAVATORY IN GUEST SUITE | | | BATHROOMS. . PER FHA REQUIREMENT #7 | | | 13. SHT A-790/ A-791/ A-792 THE DRAWING ARE EXTREMELY | | | LIGHT PLEASE DARKEN. PER WPB AMEND TO FBC 107.2.1 | | | 14. THE KITCHEN SINK IN THE PRIVATE DINING ROOM AND | | | CATERING AREA SHALL BE REQUIRED TO DISCHARGE THROUGH A | | | GREASE INTERCEPTOR. PER FBC PL 1003.3.1 | | | 15. PROVIDE MANUFACTURE SPECIFICATION FOR RUBBERIZED | | | SHOWER PAN LINER TO COMPLY WITH FBC PL 417.5.2- | | | 417.5.2.6 | | | 16. PROVIDE DETAIL FOR EMERGENCY SCUPPER WITH | | | DIMENSIONS. PER WPB AMEND TO FBC 107.2.1 | | | 17. PLEASE PROVIDE ISOMETRIC DRAWINGS FOR WATER | | | SANITARY AND STORM DRAINS. THE RISERS SHOWN ON THE PLAN | | | DO NOT PROVIDE SUFFICIENT DETAIL TO DETERMINE CODE | | | COMPLIANCE YOU CAN PROVIDE ENLARGE DETAIL ISOMETRICS | | | FOR INDIVIDUAL BATHROOM GROUPS AND COMMON AREAS. PER | | | WPB AMEND TO FBC 107.2.1 | | | 18. PLEASE SHOW THE TAGS FOR THE SS AND WATER STACKS ON | | | THE ENLARGED FLOOR PLANS. PER WPB AMEND TO FBC 107.2.1 | | | 19. PROVIDE DETAIL WITH DIMENSIONS FOR GRAB BAR BACKING | | | IN ALL BATHROOMS. FHA REQUIREMENT #6 | | | | | | | | | | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2018-11-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-11-30 |
Time |
18:31 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-11-30 |
Time |
18:30 |
Sent To |
|
|
| Notes |
| 2018-11-30 18:33:16 | DEFERRED SUBMITTALS - TPO ON ROOF, WATERPROOFING ON | | | BALCONIES AND DECKS. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2019-09-13 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-09-13 |
Time |
05:43 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-09-13 |
Time |
05:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2019-06-17 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-06-17 |
Time |
16:12 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-06-17 |
Time |
16:12 |
Sent To |
|
|
| Notes |
| 2019-06-17 16:28:53 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. CIVIL ENGINEER (MICHAEL SPRUCE, PE) HAS A DIGITAL | | | SIGNATURE THAT WAS SELF-SIGNED RATHER THAN ISSUED BY A | | | THIRD PARTY CERTIFICATE AUTHORITY, | | | FAC61G15-23.004(2)(B). THIS WAS DISCUSSED WITH | | | ENGINEER'S OFFICE AND WILL BE RESOLVED; PLEASE CONTACT | | | ME PRIOR TO RESUBMITTAL. | | | | | | 2. STRUCTURAL ENGINEER DIGITAL SIGNATURE OK. | | | | | | 3. FMEP ENGINEER (MATTHEW DONOLLI) DIGITAL SIGNATURE | | | WAS SELF-SIGNED (DOES NOT COMPLY) FOR SOME SHEETS (FOR | | | EXAMPLE, FP230); OTHERS (FOR EXAMPLE, P226) WERE SIGNED | | | WITH A DIGITAL SIGNATURE ISSUED BY IDENTRUST (OK). | | | | | | | | | | | | | | | | | | | | 2019-06-05 11:22:54 | ELECTRICAL SHEETS OK. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2019-03-11 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-03-11 |
Time |
09:28 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-03-11 |
Time |
09:27 |
Sent To |
|
|
| Notes |
| 2019-03-11 09:08:32 | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. ARCHITECTURAL PAGES LACK THE ARCHITECT BUSINESS | | | NUMBER (AA26000733) WHICH IS REQUIRED TO BE ON EVERY | | | PAGE PER FS481. PLEASE ADD TO ALL PAGES, BUT DO NOT | | | RESUBMIT THESE PAGES UNLESS THERE ARE OTHER CHANGES. | | | | | | ARCHITECT'S DIGITAL SIGNATURE OK (ANDREW WYLIE BURNETT, | | | AR98495) | | | | | | 2. CIVIL PAGES LACK THE CERTIFICATE OF AUTHORIZATION | | | NUMBER REQUIRED PER FS471. AS KIMLEY HORN HAS MORE THAN | | | ONE, IT IS NOT CLEAR THROUGH WHIH COMPANY THIS IS BEING | | | SIGNED AND SEALED. REVISE ALL PAGES TO INCLUDE, BUT | | | RESUBMIT ONLY ONE PAGE UNLESS THERE ARE CHANGES AS A | | | RESULT OF A PLAN REVIEW COMMENT. | | | | | | CIVIL ENGINEER'S DIGITAL SIGNATURE OK (MICHAEL DAVID | | | SPRUCE, PE52776) | | | | | | 3. STRUCTURAL PAGES OK (BRAD W. MALMSTEN, PE 71012, | | | THORNTON TOMASETTI, CA7519) | | | | | | 4. FIRE PROTECTION PAGES LACK THE CERTIFICATE OF | | | AUTHORIZATION NUMBER REQUIRED PER FS471 FOR STANTEC | | | CONSULTING SERVICES INC. (APPEARS TO BE CA27013 AS THE | | | OTHERS ARE NULL AND VOID OR CLOSED). REVISE ALL PAGES | | | TO INCLUDE, BUT RESUBMIT ONLY ONE PAGE UNLESS THERE ARE | | | CHANGES AS A RESULT OF A PLAN REVIEW COMMENT. | | | | | | FP PAGES DIGITAL SIGNATURE OK (MATTHEW DONOLLI, | | | PE56407) | | | | | | 5. PLUMBING, MECHANICAL, ELECTRICAL, FIRE ALARM PAGES | | | LACK THE CERTIFICATE OF AUTHORIZATION NUMBER REQUIRED | | | PER FS471 FOR STANTEC CONSULTING SERVICES INC. (APPEARS | | | TO BE CA27013 AS THE OTHERS ARE NULL AND VOID OR | | | CLOSED). REVISE ALL PAGES TO INCLUDE, BUT RESUBMIT ONLY | | | ONE PAGE UNLESS THERE ARE CHANGES AS A RESULT OF A PLAN | | | REVIEW COMMENT. | | | | | | ELECTRICAL, PLUMBING AND MECHANICAL PAGES UPLOADED | | | 8/31/18 DIGITAL SIGNATURE OK (MATTHEW DONOLLI, PE56407) | | | ALL FIRE ALARM PAGES DIGITAL SIGNATURE OK (MATTHEW | | | DONOLLI, PE56407) | | | | | | THE FOLLOWING PAGES HAVE AN INVALID SIGNATURE: | | | P100, P101A, P101B, 102B, OTHERS | | | IT APPEARS THAT THE PAGES UPLOADED ON 1/12, 1/14 & 1/15 | | | HAVE AN INVALID SIGNATURE. | | | | | | 6. DIGITAL SIGNATURES SUBMITTED NEXT REVIEW CYCLE | | | REQUIRE REVIEW. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | 2019-02-12 09:19:45 | 2ND SUBMITTAL: ELECTRICAL SHEETS OK. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2018-11-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-11-15 |
Time |
07:15 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-11-15 |
Time |
07:15 |
Sent To |
|
|
| Notes |
| 2018-11-15 07:23:43 | SIGNATURES WILL BE VARIFIED AFTER THE CONSTRUCTION | | | DOCUMENTS HAVE BEEN REVIEWED AND APPROVED. | | 2018-10-17 12:31:10 | ELECTRICAL SHEETS OK FOR SIGNATURE. |
|
|
| Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
| Rev No |
1 |
Status |
P |
Date |
2019-01-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-01-14 |
Time |
09:56 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-01-14 |
Time |
09:56 |
Sent To |
|
|
| Notes |
| 2019-01-14 09:57:06 | THORNTON TOMASETTI (954) 903-9300 | | | 101 NE 3RD AVE, SUITE 1170, FORT LAUDERDALE, FL 33301 | | | [email protected] | | | ERIC DAVID SEARCH (786) 385-1518 | | | PE 54984 | | | SI 7018775 | | | NOTE: NO OTHER INSPECTOR'S INFORMATION WAS PROVIDED. | | | ENGINEERS IN TRAINING ARE NOT ALLOWED TO PERFORM | | | INSPECTIONS REQUIRED BY THE FLORIDA BUILDING CODE. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2019-09-10 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2019-09-10 |
Time |
17:06 |
Rev Time |
3.00 |
| Received By |
eschneid |
Date |
2019-09-10 |
Time |
17:06 |
Sent To |
|
|
| Notes |
| 2019-09-10 17:09:30 | PASSED W/PROVISO | | | | | | REVISE SHEETS M-226, M-227, M-228, M-229, E-109 PRIOR | | | TO FIRST INSPECTION TO REMOVE THE COOKING FACILITIES | | | AND RECIRCULATING HOODS IN THE SECONDARY KITCHENS. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
2019-07-03 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2019-07-03 |
Time |
17:02 |
Rev Time |
6.00 |
| Received By |
eschneid |
Date |
2019-07-03 |
Time |
08:53 |
Sent To |
|
|
| Notes |
| 2019-07-03 17:04:39 | FAILED | | | | | | PROVIDE WRITTEN RESPONSES TO COMMENTS. | | | | | | 1) REVISED COMMENT: STAFF HAS REVIEWED THE COMMENT | | | RESPONSE IN ADDITION TO THE LETTER PROVIDED BY AARON | | | KNIGHT, DATED APRIL 25, 2019, AS WELL AS THE ENLARGED | | | UNIT PLANS AND ENLARGED ELECTRICAL PLANS AND HAS THE | | | FOLLOWING COMMENTS. | | | | | | A. YOU MAY PROVIDE A "SECONDARY KITCHEN" PROVIDED THAT | | | THERE ARE NO RANGES/COOK TOPS OR OVENS IN THE SECONDARY | | | KITCHEN. STAFF NOTED THAT THE ARCHITECTURAL PLANS DO | | | NOT SHOW THESE COOKING FACILITIES IN THE SECONDARY | | | KITCHENS IN UNITS G, H OR I (UNIT E IS STATED IN THE | | | LETTER AS HAVING A SECONDARY KITCHEN, BUT NONE SHOWN ON | | | THE UNIT PLAN), SO THIS IS PERMITTED BY THE ZONING | | | CODE. PLEASE NOTE THE ELECTRICAL PLANS FOR THESE UNITS | | | DOES SHOW A "COOK TOP" ON THE ELECTRICAL PANEL, WITH | | | THE ASSOCIATED OUTLET, WHICH IS NOT PERMITTED AND MAY | | | NOT BE INSTALLED, AND THE MECHANICAL PLANS SHOW | | | RECIRCULATING HOODS WHICH ARE NOT PERMITTED AND MAY NOT | | | BE INSTALLED. | | | | | | B. SHEET A-229A SHOWS AN OVEN/RANGE IN THE SECONDARY | | | KITCHEN, WHICH IS NOT PERMITTED AS THIS IS THE SECOND | | | SET OF COOKING FACILITIES IN THE PENTHOUSE UNIT. NOTE: | | | SHEET E-229 SHOWS A "COOK TOP" IN THE ELECTRICAL PANEL | | | FOR THE SECONDARY KITCHEN; HOWEVER, THE OUTLET IS NOT | | | SHOWN WHERE THE ARCHITECTURAL PLAN SHOWS THE | | | NON-PERMITTED OVEN/RANGE IS SHOWN. THE SECOND | | | OVEN/RANGE NEEDS TO BE REMOVED FROM THE PLANS AND THE | | | ELECTRICAL PLANS CORRECTED. | | | | | | 2) NEW COMMENT: ON SHEET A114 THE "TOTAL PROVIDED | | | PARKING COUNT" TABLE (LOWER LEFT CORNER OF SHEET) NOW | | | LISTS 183 PARKING SPACES PROVIDED BASED ON CHANGING THE | | | MIX OF PARKING SPACES. THE "PARKING PROVIDED" TABLE | | | (TOP MIDDLE OF SHEET) CONTINUES TO LIST 184 PARKING | | | SPACES PROVIDED. ALL TABLES MUST LIST CORRECT, | | | CONSISTENT INFORMATION. NOTE THERE ARE 18 BICYCLE | | | PARKING SPACES PROVIDED. | | | | | | 3) NEW COMMENT: ON SHEET A114 THE NEW PARKING LAYOUT | | | CHANGED (NO CLOUDING OF PLANS PROVIDED) AND STAFF NOTED | | | THE FOLLOWING ISSUES: | | | | | | A. PARKING SPACE #8 IS NO LONGER DESIGNATED ON THE | | | PLANS AND NO DIMENSIONS WERE PROVIDED TO VERIFY THAT IT | | | MEETS MINIMUM CODE REQUIREMENTS. | | | B. PARKING SPACE #9 DOES NOT FUNCTION DUE TO THE COLUMN | | | AT ITS HEAD MAKING THE SPACE LESS THAN THE REQUIRED 16 | | | FEET IN DEPTH (FOR A COMPACT SPACE) DUE TO THE | | | ELIMINATION OF THE WHEEL STOP OVERHANG. NOTE: THIS IS | | | DIFFERENT FROM HOW IT APPEARS ON SHEETS A-101 AND | | | A-101A | | | C. PARKING SPACE #26 IS NO LONGER DESIGNATED ON THE | | | PLANS AND NO DIMENSIONS WERE PROVIDED TO VERIFY THAT IT | | | MEETS MINIMUM CODE REQUIREMENTS. | | | D. PARKING SPACE #29 CHANGED FROM A COMPACT SPACE TO A | | | REGULAR SPACE; HOWEVER THE STRIPING AT THE PARKING | | | SPACE WAS NOT CORRECTED TO MEET CODE REQUIREMENTS. | | | E. PARKING SPACE #58, #95 AND #96 NO LONGER EXIST. DID | | | THE SHIFT TO WHERE THE OLD SPACE #96 WAS? THE PAVEMENT | | | MARKING IS UNCLEAR ON THE PLANS. NO DIMENSIONS FOR WHAT | | | APPEAR TO BE THE NEW SPACES IS PROVIDED FOR STAFF TO | | | VERIFY CODE COMPLIANCE, THIS INCLUDES THE AISLE WIDTH | | | AT THIS LOCATION. NOTE: SHEET A-101A PARKING SPACE | | | DEPTH DIFFERS FROM WHAT IS SHOWN ON SHEET A114. | | | | | | 4) NEW COMMENT: PLEASE EXPLAIN WHY THE GRAND TOTAL GBA | | | GROUND LEVEL AREA SHOWN ON SHEET A114 INCREASED FROM | | | 47,179 SF ON VERSION 2 OF THE PLANS TO 47,611 SF ON | | | VERSION 3 OF THE PLANS. STAFF WAS NOT ABLE TO SEE ANY | | | INCREASE IN THE BUILDING FOOTPRINT, NOR WAS CLOUDING | | | USED TO HIGHLIGHT CHANGES. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2019-03-13 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2019-03-13 |
Time |
16:49 |
Rev Time |
6.00 |
| Received By |
eschneid |
Date |
2019-03-13 |
Time |
09:03 |
Sent To |
|
|
| Notes |
| 2019-03-13 17:04:25 | FAILED | | | | | | PROVIDE WRITTEN RESPONSES TO COMMENTS. | | | | | | 1) REPEAT COMMENT: SHEET G-3 SHOWS INCORRECT STRIPING. | | | - THE "STANDARD ADA PARKING SPACE DESIGN" DETAIL WAS | | | NOT CORRECTED TO REFLECT THE CITY REQUIREMENT OF 12 | | | INCHES BETWEEN THE STRIPES. THE OTHER DETAIL SHOW THIS | | | CORRECTLY. | | | | | | 2) A REVIEW OF THE FLOOR PLANS SHOWS MANY UNITS HAVING | | | TWO KITCHENS. THE PRESENCE OF KITCHENS IS THE MAJOR | | | FACTOR USED BY THE CITY TO DETERMINE UNIT COUNTS (THE | | | REASON THE GUEST SUITES ARE NOT PERMITTED TO HAVE | | | KITCHENS). PLEASE PROVIDE INFORMATION SO THAT THE CITY | | | CAN BE ASSURED THAT THE UNITS WITH MULTIPLE KITCHENS | | | WILL NOT BE USED FOR PURPOSES OTHER THAN SINGLE FAMILY | | | OCCUPANCY. | | | | | | 3) THE SHROUDS/HOODS FOR THE GARAGE VENTING/GENERATOR | | | VENTING REQUIRE ZONING REVIEW AND APPROVAL. | | | | | | 4) SEPARATE PERMIT REQUIRED FOR: | | | | | | A. LIGHTING | | | B. FENCING, TO INCLUDE GUARD RAIL | | | C. LANDSCAPE | | | D. IRRIGATION | | | E. HARDSCAPE | | | | | | 5) PLEASE NOTE THAT THERE APPEAR BE AREAS WHERE THE | | | GUARD RAIL SITS ON TOP OF THE RETAINING WALL AND WILL | | | EXCEED THE SIX FOOT WALL HEIGHT ALLOWED AT THE PROPERTY | | | LINE (NO WAIVER GRANTED BY THE CITY COMMISSION FOR | | | THIS). STAFF IS UNSURE WHO THE GUARD RAIL SERVES AS | | | EACH SIDE OF THE RETAINING WALL SEEMS TO HAVE ENOUGH | | | HEIGHT TO KEEP SOMEONE FROM FALLING OFF EITHER SIDE. | | | THIS WARRANTS FURTHER DISCUSSION. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2018-12-19 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2018-12-19 |
Time |
12:13 |
Rev Time |
6.00 |
| Received By |
eschneid |
Date |
2018-12-12 |
Time |
10:35 |
Sent To |
|
|
| Notes |
| 2018-12-19 12:32:38 | FAILED | | | | | | PROVIDE WRITTEN RESPONSES TO COMMENTS. | | | | | | 1) SHEET A114 IS NOT THE LATEST PLAN APPROVED AS PART | | | OF THE MINOR PD AMENDMENT. | | | | | | 2) SHEET G-3 SHOWS INCORRECT STRIPING. | | | | | | 3) SHEET G-7 SHOWS INCORRECT DATA. | | | | | | 4) THESE ARE NOT THE LATEST CIVIL PLANS APPROVED AS | | | PART OF THE MINOR PD AMENDMENT. | | | | | | 5) SHEET A-101 IS NOT THE LATEST PLAN APPROVED AS PART | | | OF THE MINOR PD AMENDMENT ? PARKING COUNT AND BICYCLE | | | RACKS. | | | | | | 6) SHEETS A-101A, A-102 AND A-102A SHOW A RETAINING | | | WALL BLOCKING THE WESTERN PERIMETER SIDEWALK. | | | | | | 5) SHEET A-101B IS NOT THE LATEST PLAN APPROVED AS PART | | | OF THE MINOR PD AMENDMENT ? BICYCLE RACKS. | | | | | | 6) ROOF SLAB ON SHEET A-110 SHOWS THE HEIGHT AT 302 | | | FEET 4 INCHES AS OPPOSED TO THE MINOR AMENDMENT | | | APPROVED ROOF HEIGHT OF 301 FEET 10 INCHES AND THE | | | HEIGHT SHOWN ON THE ELEVATION DRAWINGS SHEETS A-400 | | | THROUGH A-402 AND THE SECTION DRAWINGS. STAIR SECTION 3 | | | ON SHEET A-601 AND SECTION 2 ON SHEET A-609 ALSO SHOW | | | ROOF HIGHER THAN 301 FEET 10 INCHES. SHEET A-610 SHOWS | | | THE ELEVATOR CORE EXCEEDING THE 301 FEET 10 INCH | | | HEIGHT. THE TRASH CUTES ON SHEET A-620 EXCEED THE 301 | | | FEET 10 INCH HEIGHT. | | | | | | 7) THE NORTH ELEVATION ON THE PERMIT SET SHOWS THE | | | MIDDLE OF THE BUILDING AS "STUCCO/PTD W/ SCORE LINES" | | | WHILE THE APPROVED MINOR PD AMENDMENT PLANS SHOW THIS | | | AREA AS ?MATTE ALUMINUM CLADDING?. | | | | | | 8) THE EAST ELEVATION ON THE PERMIT SET SHOWS A | | | "CONCRETE WALL" WHILE THE APPROVED PLANS SHOW THIS AREA | | | AS "BEAUVAL FRENCH LIMESTONE". | | | | | | 9) SHEET A-502, BUILDING SECTION, SHOWS A PORTION OF | | | THE BUILDING EXTENDING ABOVE THE 307 FOOT MAXIMUM | | | HEIGHT. | | | | | | 10) SHEET A-801 DOES NOT SHOW THE FULL HEIGHT OF THE | | | COOLING TOWERS SCREENED AS REQUIRED BY THE RPD | | | REGULATIONS. | | | | | | 11) SHEET M-101A SHOWS THE GARAGE VENTING/GENERATOR | | | VENTING TOWARD THE RESIDENTIAL BUILDING TO THE SOUTH OF | | | THE SITE. THIS IS NOT PERMITTED. VENTING MAY NOT BE | | | DIRECTED TOWARD THE ADJACENT RESIDENTIAL PROPERTIES. | | | | | | 12) SHOW A SECTION DRAWING TO VERIFY THAT THE ROOFTOP | | | MECHANICAL EQUIPMENT DOES NOT EXCEED THE HEIGHT OF THE | | | PARAPET. | | | | | | 13) THE ABOVE GRADE PHOTOMETRIC PLANS NEED TO BE SHOWN | | | TO THE PROPERTY LINE IN ACCORDANCE WITH THE CONDITIONS | | | FROM THE APPROVED MINOR PD AMENDMENTS. | | | | | | 14) PROVIDE VERIFICATION THAT THE GLASS AND STEEL ON | | | ALL BUILDING FACADES IS TREATED IN SUCH A WAY TO | | | MINIMIZE GLARE AND REFLECTION OF HIGH INTENSITY | | | SUNLIGHT ONTO SURROUNDING PROPERTIES. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |