Plan Review Details - Permit 18081090
Plan Review Stops For Permit 18081090
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-09-21 Cont ID  
Sent By rmcdouga Date 2018-09-21 Time 18:29 Rev Time 0.00
Received By rmcdouga Date 2018-09-21 Time 18:29 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-09-17 Cont ID  
Sent By rmcdouga Date 2018-09-17 Time 10:14 Rev Time 0.00
Received By rmcdouga Date 2018-09-17 Time 10:14 Sent To I
Notes
2018-09-17 10:23:10PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE ENGINEER'S DRAWING FOR THE AMERICAST GENERATOR
 PAD DOES NOT HAVE THE ENGINEER'S HANDWRITTEN SIGNATURE
 OR SEAL. 61G15-23.003 PROCEDURES FOR PHYSICALLY SIGNING
 AND SEALING PLANS, SPECIFICATIONS, REPORTS OR OTHER
 DOCUMENTS.
 ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER
 DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN
 ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025,
 F.S., AND RULE 61G15-23.001, F.A.C. MUST BE PHYSICALLY
 SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE
 PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE.
 (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE
 LICENSEE'S SIGNATURE ON EACH PAGE REQUIRED TO BE
 SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR
 COPIED IMAGE OF THE LICENSEE'S SIGNATURE SHALL NOT BE
 USED.
 (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY
 CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY
 OVERLAPPING THE LICENSEE'S SIGNATURE ON EACH PAGE
 REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL
 NOT RENDER THE SIGNATURE ILLEGIBLE.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-09-04 Cont ID  
Sent By jleahy Date 2018-09-04 Time 09:43 Rev Time 0.00
Received By jleahy Date 2018-09-04 Time 09:42 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-09-06 Cont ID  
Sent By lcrespo Date 2018-09-06 Time 12:26 Rev Time 0.00
Received By lcrespo Date 2018-09-06 Time 12:26 Sent To  
Notes
2018-09-06 12:28:23GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE. AT
 THIS TIME. WPB AMENDMENTS TO FBC SEC. 107.2.1.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-09-21 Cont ID  
Sent By rmcdouga Date 2018-09-21 Time 18:29 Rev Time 0.00
Received By rmcdouga Date 2018-09-20 Time 11:43 Sent To  
Notes
2018-09-21 11:44:09RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-09-17 Cont ID  
Sent By rmcdouga Date 2018-09-17 Time 10:23 Rev Time 0.00
Received By rmcdouga Date 2018-08-22 Time 10:25 Sent To  
Notes
2018-08-23 10:25:38ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2018-08-28 Cont ID  
Sent By mcruz Date 2018-08-28 Time 15:11 Rev Time 0.00
Received By mcruz Date 2018-08-28 Time 14:51 Sent To  
Notes
2018-08-28 15:11:47ZONING PASSED WITH PROVISO: GENERATOR SHALL BE AT LEAST
 8' FROM REAR PROPERTY LINE.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved