| 2018-09-27 11:22:34 | ****CORRECTIONS**** |
| | W.P.B. PERMIT: 18081031 |
| | REVIEWED: SEPTEMBER 27, 2018 |
| | |
| | DYLAN BATTLES |
| | BUILDING PLANS EXAMINER I |
| | [email protected] |
| | 561-805-6718 |
| | |
| | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC AMENDED = FLORIDA BUILDING CODE,6TH EDITION (2017) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC ENERGY = FBC ENERGY CONSERVATION |
| | FBC R = FBC RESIDENTIAL |
| | |
| | 1. [FBC 107.2.5]PROVIDE SURVEY OF PROPERTY SHOWING |
| | EASEMENTS. |
| | |
| | 2. [FBC AMENDED 109]PROVIDE COPY OF PROPOSAL WITH |
| | CONTRACTOR TO SHOW WORK VALUE EQUAL TO THE AMOUNT SHOWN |
| | ON PERMIT APPLICATION. VALUE SHOULD INCLUDE ALL DEMO, |
| | INTERIOR WORK, TRUSSES AND ROOFING. |
| | VALUE WILL NOT INCLUDE DRIVEWAY AND SIDEWALK. THE FEES |
| | FOR THESE WILL BE ASSESSED THROUGH ENGINEERING DRIVEWAY |
| | PERMIT. |
| | |
| | 3. [FBC 107.3.5.3]PROVIDE PROJECT DESIGN DATA: |
| | -LEVEL OF ALTERATION |
| | -EXISTING SQ. FOOTAGE UNDER AIR AND NOT UNDER AIR. |
| | -PROPOSED SQ. FOOTAGE UNDER AIR AND NOT UNDER AIR. |
| | -PERCENTAGE OF AREA AFFECTED BY WORK. |
| | -LABEL EXISTING SPACES WHERE WORK IS OCCURING |
| | -LABEL WHAT PROPOSED SPACES ARE BECOMING. |
| | |
| | 4. FBC R301.2.1]PROVIDE WIND DESIGN CRITERIA AND DESIGN |
| | PRESSURES FOR WINDOW AND DOOR OPENINGS. |
| | |
| | 5. [FBC R3-1.2(6)]PROVIDE WIND DIAGRAM THAT MATCHES THE |
| | ROOF CONDITION OF THIS HOUSE. |
| | |
| | 6. [FBC 107.2.5]IS THE EXISTING SPACE UNDER AIR AND |
| | WILL THE NEW SPACE BE AIR CONDITIONED? |
| | PROVIDE HOW THE ENERGY CODE IS BEING MET AND PROVIDE |
| | DETAILS ABOUT INSULATION IN THE CEILING AND WALLS. |
| | ARE THERE ANY WALL/CEILING FINISHES? DRYWALL OR STUCCO? |
| | |
| | 7. [FBC 107.2.5]IS THERE ANY ELECTRICAL OR MECHANICAL |
| | WORK FOR THIS PROJECT? |
| | |
| | 8. [FBC R806]SUPPLY VENTING CALCULATIONS FOR THE ATTIC |
| | AND HOW THE AREA OF VENTING WILL BE ACHIEVED. |
| | IF OFF RIDGE VENTS BEING USED SUPPLY PRODUCT APPROVAL, |
| | OR DEFER WITH ROOF SUBMITTAL. |
| | |
| | 9. [FBC R807]BUILDINGS WITH COMBUSTIBLE CEILING OR ROOF |
| | CONSTRUCTION SHALL HAVE AN ATTIC ACCESS OPENING TO |
| | ATTIC AREAS THAT HAVE A VERTICAL HEIGHT OF 30 INCHES |
| | (762 MM) OR GREATER OVER AN AREA OF NOT LESS THAN 30 |
| | SQUARE FEET (2.8 M2). |
| | |
| | 10. [FBC R903.2.2]CRICKETS AND SADDLES. |
| | A CRICKET OR SADDLE SHALL BE INSTALLED ON THE RIDGE |
| | SIDE OF ANY CHIMNEY OR PENETRATION MORE THAN 30 INCHES |
| | (762 MM) WIDE AS MEASURED PERPENDICULAR TO THE SLOPE. |
| | CRICKET OR SADDLE COVERINGS SHALL BE SHEET METAL OR OF |
| | THE SAME MATERIAL AS THE ROOF COVERING. |
| | WHERE THE NEW TIE BEAM EXTENDS UP PAST THE NEW TRUSSES, |
| | BEST SHOWN IN SHEET A-300 PROPOSED BUILDING SECTION, |
| | HOW WILL WATER SHED IN THE VALLEY WITHOUT ANY PITCH? |
| | |
| | 11. [FBC R301.4] [FBC R301.5]PROVIDE LIVE LOAD AND DEAD |
| | LOAD FOR NEW ROOFING. |
| | |
| | 12. [FBC AMENDED 107.3.4.1]PROVIDE PRODUCT APPROVALS |
| | FOR ROOFING, OR INDICATE THAT YOU WOULD LIKE THEM |
| | DEFERED. |
| | |
| | 13. [FBC AMENDED 107.3.4.1]SUBMIT TRUSS SHOP DRAWINGS |
| | TO THE BUILDING INSPECTOR PRIOR TO INSTALLATION |
| | |
| | NOTE: |
| | -PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW |
| | EACH COMMENT IS BEING ADDRESSED. |
| | -ADDITIONAL COMMENTS MAY BE FORTHCOMING PENDING REVIEW |
| | OF MATERIALS REQUESTED. |
| | -WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED SETS |
| | OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS) |
| | SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT |
| | DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER |
| | SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID" |
| | OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS |
| | APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE |
| | NEED "VOID", RENDERING THEM NOT USABLE. |
| | |