Plan Review Details - Permit 18080843
Plan Review Stops For Permit 18080843
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-10-31 Cont ID  
Sent By rmcdouga Date 2018-10-31 Time 12:11 Rev Time 0.00
Received By rmcdouga Date 2018-10-31 Time 10:49 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-08-24 Cont ID  
Sent By rmcdouga Date 2018-08-24 Time 07:56 Rev Time 0.00
Received By rmcdouga Date 2018-08-24 Time 07:56 Sent To  
Notes
2018-08-24 08:00:10PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF PRODUCT APPROVALS FOR THE 48" X
 72" RUSKIN MODEL ELF6375DXD LOUVER. FBC 107.3.4 -
 PROVIDE TWO SETS OF PRODUCT APPROVALS FOR THOSE
 PRODUCTS WHICH ARE REGULATED BY FAC 61G20-3.001 PER
 FLORIDA STATUTE 553.842 (5) THAT HAVE BEEN REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF RECORD.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-10-19 Cont ID  
Sent By jleahy Date 2018-10-19 Time 09:14 Rev Time 0.00
Received By jleahy Date 2018-10-19 Time 09:14 Sent To Z
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-08-29 Cont ID  
Sent By jleahy Date 2018-08-29 Time 09:12 Rev Time 0.00
Received By jleahy Date 2018-08-28 Time 17:23 Sent To  
Notes
2018-08-29 09:15:46FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
  
 NEED TO SUBMIT CUT CHEETS FOR THE FIRE PUMP CONTROLLER.

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2018-10-17 Cont ID  
Sent By scaldero Date 2018-10-17 Time 10:10 Rev Time 0.00
Received By scaldero Date 2018-10-17 Time 10:10 Sent To P
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-08-24 Cont ID  
Sent By scaldero Date 2018-08-24 Time 09:22 Rev Time 0.00
Received By scaldero Date 2018-08-24 Time 09:04 Sent To E
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2018-11-14 Cont ID  
Sent By tklarge Date 2018-11-14 Time 10:54 Rev Time 0.00
Received By tklarge Date 2018-11-14 Time 10:54 Sent To I
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-10-31 Cont ID  
Sent By tklarge Date 2018-10-31 Time 08:32 Rev Time 0.00
Received By tklarge Date 2018-10-30 Time 05:49 Sent To  
Notes
2018-10-30 11:44:561) SHT. M-1 - THE PLANS NOTE THE GAS SYSTEM PRESSURE IS
 11 INCHES WATER COLUMN WITH A PRESSURE DROP OF 6.0 IN.
 WATER COLUMN BUT ON PAGE 5 IN THE REGULATOR
 SPECIFICATIONS YOU HAVE HIGHLIGHTED A 14 INCH WATER
 COLUMN CAPACITY TABLE WITH A 2 INCH WATER COLUMN DROP.
 THIS IS AT THE TOP OF THE PAGE. CLARIFY.
 2) SUPPLY INFORMATION FOR THE SPACING OF THE EXHAUST
 SUPPORTS. ALSO, THE SUPPORT DETAIL ON SHT. M-1 SHOWS A
 PLASTIC ALL THREAD THROUGH THE CLEVIS HANGER. IS THIS
 CORRECT? PLEASE ADVISE.
 3) THE GENERAC SPECS NOTE THE BTU LOAD OF THE GENERATOR
 AS 2,340,000 BTU'S AND THE GAS PLAN SHOWS 2,800,000.
 CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-10-25 Cont ID  
Sent By tklarge Date 2018-09-05 Time 11:45 Rev Time 0.00
Received By tklarge Date 2018-09-04 Time 11:45 Sent To  
Notes
2018-10-25 11:46:261) TWO DIFFERENT GAS PIPING RISERS HAVE BEEN SUBMITTTED
 FOR THIS WORK. ONE IS FROM ROSADO PROPANE SERVICES AND
 THE OTHER HAS BEEN DONE BY THE ENGINEER OF RECORD.
 SUBMIT TWO COPIES OF THE CORRECT GAS DRAWING TO BE
 SUBMITTED. FBC 107.2.
 2) INDICATE ON THE PLAN THE OPERATING PRESSURE OF THE
 SYSTEM DOWNSTREAM OF THE REGULATOR FOR THE GENERATOR.
 ROSADO PROPANE HAS SUBMITTED A SIZING TABLE FOR 5 PSI
 AND SHT. M-1 SHOWS A PRESSURE OF LESS THAN 2
 PSI.CLARIFY.
 3) SHOW THE PSI OF THE SYSTEM DOWNSTREAM OF THE
 EXISTING GAS METER AND SHOW THE LOCATION OF ANY
 EXISTING GAS REGULATORS ON THE ROSADO PROPANE DRAWING
 IF THAT IS THE DRAWING TO BE USED. FBC 107.2.1.
 4) THE GENERATOR SPECIFICATIONS AND THE DRAWING FROM
 ROSADO PROPANE CALL OUT A 2 INCH GAS SUPPLY LINE TO THE
 GENERATOR AND THE GAS RISER DRAWING ON SHT. M-1 SHOWS A
 1 1/2 INCH GAS SUPPLY LINE. CLARIFY.
 5) SHOW THE DISTANCE OF THE 2ND STAGE REGULATOR TO THE
 GENERATOR ON THE GAS DRAWING TO BE USED. FBC 107.2.1.
 6) THE GAS INFO PAGE FROM ROSADO PROPANE NOTES PIPE
 SIZING FOR NEW GAS LINE IS BASED ON TABLE 402.4 (7) FOR
 A 5 PSI SYSTEM BUT ALSO REFERENCES THE SAME SIZING
 TABLE FOR A LESS THAN 2 PSI SYSTEM. CLARIFY.THIS
 INFORMATION CONFLICTS WITH THE INFORMATION PROVIDED BY
 THE ENGINEER ON SHT. M-1. CLARIFY.
 7) THE GAS DRAWING FROM ROSADO PROPANE SHOWS A 10 PSI
 GAS METER YET DRAWING M-1 SHOWS A LESS THAN 2 PSI
 PRESSURE. CLARIFY.
 8) THE GAS PIPING FROM ROSADO PROPANE SHOWS GALVANIZED
 PIPING TO BE RRUN UNDERGROUND.GALVANIZED PIPING SHALL
 NOT BE USED UNDERGROUND PER FBC-FUEL GAS SEC.404.11,
 404.11.1.
 9) SUBMIT COMBUSTION CALCULATIONS FOR CCOMBUSTION AIR.
 FBC-FUEL GAS SEC.304.1,304.6.2.
 10) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION DETAILS FOR THE NEW EXHAUST PIPE FROM THE
 GENERATOR ( TYPE OF PIPE, TYPE OF SUPPOTS, SUPPORT
 SPACING, ETC.).
 11) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 MINIMUM REQUIRED CLEARANCES AROUND THE GENERATOR. FBC
 107.2.1.
 12) SUBMIT MANUFACTURER?S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS.
 IDENTIFY ON THE SPECIFICATION SHEETS WHICH MODEL
 REGULATOR IS BEING INSTALLED AND THE ORIFICE SIZE TO
 ENSURE THE REGULATOR CAN ACCOMMODATE THE BTU LOAD
 THROUGH THE REGULATOR.2017 FGC SEC.410.1, 2017 FBC-RES.
 SEC. G2421.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-11-14 Cont ID  
Sent By tklarge Date 2018-11-14 Time 10:54 Rev Time 0.00
Received By tklarge Date 2018-11-01 Time 13:51 Sent To  
Notes
2018-11-02 13:52:05RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-10-31 Cont ID  
Sent By rmcdouga Date 2018-10-31 Time 12:13 Rev Time 0.00
Received By rmcdouga Date 2018-10-01 Time 15:05 Sent To  
Notes
2018-10-02 15:05:27RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-09-05 Cont ID  
Sent By tklarge Date 2018-09-05 Time 07:29 Rev Time 0.00
Received By tklarge Date 2018-08-16 Time 12:59 Sent To  
Notes
2018-08-17 12:59:28ROUTED TO ZONING INBOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2018-08-29 Cont ID  
Sent By hmoser Date 2018-08-29 Time 13:23 Rev Time 0.00
Received By hmoser Date 2018-08-29 Time 13:23 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2018-11-14 Cont ID  
Sent By tklarge Date 2018-11-14 Time 10:54 Rev Time 0.00
Received By tklarge Date 2018-11-14 Time 10:00 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-09-05 Cont ID  
Sent By tklarge Date 2018-09-05 Time 07:28 Rev Time 0.00
Received By tklarge Date 2018-09-04 Time 05:48 Sent To I
Notes
2018-09-04 14:31:041) TWO DIFFERENT GAS PIPING RISERS HAVE BEEN SUBMITTTED
 FOR THIS WORK. ONE IS FROM ROSADO PROPANE SERVICES AND
 THE OTHER HAS BEEN DONE BY THE ENGINEER OF RECORD.
 SUBMIT TWO COPIES OF THE CORRECT GAS DRAWING TO BE
 SUBMITTED. FBC 107.2.
 2) INDICATE ON THE PLAN THE OPERATING PRESSURE OF THE
 SYSTEM DOWNSTREAM OF THE REGULATOR FOR THE GENERATOR.
 ROSADO PROPANE HAS SUBMITTED A SIZING TABLE FOR 5 PSI
 AND SHT. M-1 SHOWS A PRESSURE OF LESS THAN 2
 PSI.CLARIFY.
 3) SHOW THE PSI OF THE SYSTEM DOWNSTREAM OF THE
 EXISTING GAS METER AND SHOW THE LOCATION OF ANY
 EXISTING GAS REGULATORS ON THE ROSADO PROPANE DRAWING
 IF THAT IS THE DRAWING TO BE USED. FBC 107.2.1.
 4) THE GENERATOR SPECIFICATIONS AND THE DRAWING FROM
 ROSADO PROPANE CALL OUT A 2 INCH GAS SUPPLY LINE TO THE
 GENERATOR AND THE GAS RISER DRAWING ON SHT. M-1 SHOWS A
 1 1/2 INCH GAS SUPPLY LINE. CLARIFY.
 5) SHOW THE DISTANCE OF THE 2ND STAGE REGULATOR TO THE
 GENERATOR ON THE GAS DRAWING TO BE USED. FBC 107.2.1.
 6) THE GAS INFO PAGE FROM ROSADO PROPANE NOTES PIPE
 SIZING FOR NEW GAS LINE IS BASED ON TABLE 402.4 (7) FOR
 A 5 PSI SYSTEM BUT ALSO REFERENCES THE SAME SIZING
 TABLE FOR A LESS THAN 2 PSI SYSTEM. CLARIFY.THIS
 INFORMATION CONFLICTS WITH THE INFORMATION PROVIDED BY
 THE ENGINEER ON SHT. M-1. CLARIFY.
 7) THE GAS DRAWING FROM ROSADO PROPANE SHOWS A 10 PSI
 GAS METER YET DRAWING M-1 SHOWS A LESS THAN 2 PSI
 PRESSURE. CLARIFY.
 8) THE GAS PIPING FROM ROSADO PROPANE SHOWS GALVANIZED
 PIPING TO BE RRUN UNDERGROUND.GALVANIZED PIPING SHALL
 NOT BE USED UNDERGROUND PER FBC-FUEL GAS SEC.404.11,
 404.11.1.
 9) SUBMIT COMBUSTION CALCULATIONS FOR CCOMBUSTION AIR.
 FBC-FUEL GAS SEC.304.1,304.6.2.
 10) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION DETAILS FOR THE NEW EXHAUST PIPE FROM THE
 GENERATOR ( TYPE OF PIPE, TYPE OF SUPPOTS, SUPPORT
 SPACING, ETC.).
 11) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 MINIMUM REQUIRED CLEARANCES AROUND THE GENERATOR. FBC
 107.2.1.
 12) SUBMIT MANUFACTURER?S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS.
 IDENTIFY ON THE SPECIFICATION SHEETS WHICH MODEL
 REGULATOR IS BEING INSTALLED AND THE ORIFICE SIZE TO
 ENSURE THE REGULATOR CAN ACCOMMODATE THE BTU LOAD
 THROUGH THE REGULATOR.2017 FGC SEC.410.1, 2017 FBC-RES.
 SEC. G2421.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop Z ZONING
Rev No 3 Status P Date 2018-10-26 Cont ID  
Sent By mcruz Date 2018-10-26 Time 12:00 Rev Time 0.00
Received By mcruz Date 2018-10-25 Time 16:57 Sent To G
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2018-10-09 Cont ID  
Sent By mcruz Date 2018-10-09 Time 16:08 Rev Time 0.00
Received By mcruz Date 2018-10-09 Time 15:58 Sent To FIRE
Notes
2018-10-09 16:07:05ZONING REVIEW FAILED, DUE TO THE FOLLOWING:
  
 1) RESPOND TO COMMENTS IN WRITING. OTHER REVIEWERS WERE
 ADDRESSED EXCEPT ZONING.
 2) PROVIDE A SURVEY/SITE PLAN SHOWING LOCATION OF
 GENERATOR AND SETBACKS TO PROPERTY LINES.
  
 FOR ADDITIONAL INFORMATION, THE ZONING AND LAND
 DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT
 WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH
 PLANNING DEPARTMENT WEBSITE AT
 WWW.CITYOFWPB.COM/PLAN/INDEX.HTM.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2018-08-22 Cont ID  
Sent By mcruz Date 2018-08-22 Time 16:06 Rev Time 0.00
Received By mcruz Date 2018-08-22 Time 15:53 Sent To  
Notes
2018-08-22 16:06:46ZONING REVIEW FAILED, DUE TO THE FOLLOWING:
  
 1) PROVIDE A SURVEY SHOWING LOCATION OF GENERATOR AND
 SETBACKS TO PROPERTY LINES.
  
 FOR ADDITIONAL INFORMATION, THE ZONING AND LAND
 DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT
 WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH
 PLANNING DEPARTMENT WEBSITE AT
 WWW.CITYOFWPB.COM/PLAN/INDEX.HTM.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved