| Plan Review Stops For Permit 18080815 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2018-10-27 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2018-10-27 |
Time |
09:20 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2018-10-27 |
Time |
09:20 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-09-12 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2018-09-12 |
Time |
08:38 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
|
Time |
|
Sent To |
I |
|
| Notes |
| 2018-09-12 08:43:36 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | NOTES: ALL WORK, INCLUDING CONNECTIONS, WILL BE SUBJECT | | | TO VERIFICATION BY FIELD INSPECTOR. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-09-01 |
|
|
Cont ID |
|
| Sent By |
hmtribou |
Date |
2018-08-28 |
Time |
11:41 |
Rev Time |
|
| Received By |
pvalenti |
Date |
|
Time |
|
Sent To |
E |
|
| Notes |
| 2018-09-01 17:32:43 | ****CORRECTIONS**** | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | | | | FBC 107. | | | | | | 1. PLEASE CLARIFY THE LOCATION OF PROPOSED SOLAR PANEL | | | SYSTEM. THE PLANS APPEAR TO SHOW CONNECTIONS TO AN | | | EXISTING ROOF DECK AND/OR A NEW ALUMINUM FRAMING SYSTEM | | | DIRECT TO GRADE. | | | | | | | | | | | | AWS D1.1 CLAUSE 3.1 / AWS D1.1 CLAUSE 4.15 | | | | | | 2. IF FIELD WELDING IS GOING TO TAKE PLACE, THE | | | FOLLOWING SPECIFICATIONS WILL BE REQUIRED: | | | | | | A. A WELD PROCEDURE SPECIFICATION; THIS SPECIFICATION | | | IS REQUIRED TO SHOW THE ESSENTIAL VARIABLES USED DURING | | | THE WELDING PROCEDURE AS PER THE REQUIREMENTS OF AWS | | | D1.1. | | | B. A WELDER PERFORMANCE QUALIFICATION TEST RECORD AS | | | PER THE REQUIREMENTS OF AWS D1.1. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2018-09-04 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-08-24 |
Time |
14:10 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-08-24 |
Time |
14:10 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2018-10-27 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2018-10-27 |
Time |
09:20 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2018-10-24 |
Time |
14:55 |
Sent To |
I |
|
| Notes |
| 2018-10-25 14:55:23 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-09-12 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2018-09-12 |
Time |
08:44 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2018-09-04 |
Time |
13:24 |
Sent To |
I |
|
| Notes |
| 2018-09-05 13:24:42 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-09-04 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-09-04 |
Time |
09:45 |
Rev Time |
|
| Received By |
jleahy |
Date |
2018-08-15 |
Time |
13:08 |
Sent To |
|
|
| Notes |
| 2018-09-01 17:48:29 | 9/1 TO JL DESK | | | | | | | | 2018-08-16 13:09:03 | ROUTED TO JLEAHY |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2018-10-26 |
|
|
Cont ID |
|
| Sent By |
hmtribou |
Date |
2018-10-26 |
Time |
09:46 |
Rev Time |
0.00 |
| Received By |
hmtribou |
Date |
2018-10-26 |
Time |
09:46 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2018-09-06 |
|
|
Cont ID |
|
| Sent By |
hmtribou |
Date |
2018-09-06 |
Time |
13:23 |
Rev Time |
0.00 |
| Received By |
hmtribou |
Date |
2018-09-06 |
Time |
13:23 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2018-08-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-09-04 |
Time |
09:45 |
Rev Time |
0.00 |
| Received By |
hmtribou |
Date |
2018-08-28 |
Time |
11:41 |
Sent To |
B |
|
| Notes |
| 2018-08-28 10:56:32 | LOCATION OF NEW STRUCTURE MUST BE INCLUDED ON SITE PLAN | | | TO MEET SETBACK REQUIREMENT AND IF NEEDED SEPERATION | | | REQUIREMRNTS. |
|
|