Plan Review Details - Permit 18080795
Plan Review Stops For Permit 18080795
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-08-25 Cont ID  
Sent By rmcdouga Date 2018-08-25 Time 07:13 Rev Time 0.00
Received By rmcdouga Date 2018-08-25 Time 07:02 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-09-20 Cont ID  
Sent By jleahy Date 2018-09-20 Time 13:40 Rev Time 0.00
Received By jleahy Date 2018-09-20 Time 13:40 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-08-27 Cont ID  
Sent By jleahy Date 2018-08-27 Time 13:02 Rev Time 0.00
Received By jleahy Date 2018-08-27 Time 13:01 Sent To  
Notes
2018-08-27 13:01:53PROVIDE CUT SHEETS FOR PUMP, FILTER, LIGHT

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-09-04 Cont ID  
Sent By lcrespo Date 2018-09-04 Time 17:04 Rev Time 0.00
Received By lcrespo Date 2018-09-04 Time 17:04 Sent To  
Notes
2018-09-04 17:06:14NO GAS BECAUSE THEIR IS NO POOL HEATER

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-09-20 Cont ID  
Sent By jleahy Date 2018-09-20 Time 16:52 Rev Time 0.00
Received By jleahy Date 2018-09-18 Time 13:39 Sent To  
Notes
2018-09-19 13:40:09RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-09-04 Cont ID  
Sent By lcrespo Date 2018-09-04 Time 17:06 Rev Time 0.00
Received By lcrespo Date 2018-08-15 Time 11:21 Sent To  
Notes
2018-08-16 11:21:36ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-09-21 Cont ID  
Sent By lcrespo Date 2018-09-21 Time 18:14 Rev Time 0.00
Received By lcrespo Date 2018-09-21 Time 18:14 Sent To  
Notes
2018-09-21 18:15:3109/21/18 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-09-04 Cont ID  
Sent By lcrespo Date 2018-09-04 Time 17:06 Rev Time 0.00
Received By lcrespo Date 2018-09-04 Time 17:06 Sent To  
Notes
2018-09-04 17:22:4509/04/2018 1ST PLUMBING/POOL REVIEW **DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER
 ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013
 EDITION ADDRESSES FLOW RATE IN GALLONS PER MINUTE
 (GPM). IT REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES
 NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE SUCTION
 OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH
 CALCULATIONS MUST INCLUDE ALL OF THE SYSTEM COMPONENTS
 IN THE PIPING SYSTEM INCLUDING THE FILTER.
 2. IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS
 SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS
 IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE
 TDH CALCULATIONS. WPB AMENDMENTS TO THE FBC SEC.
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 3. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE MAIN
 DRAIN AND THE PUMP. WPB AMENDMENTS TO FBC SEC. 107.2.1.
 4. SUBMIT CLEAR AND LEGIBLE SPECIFICATIONS FOR THE
 CARTRIDGE FILTER. WPB AMEND. TO FBC SEC. 107.2.1.
 6. BACKFLOW PREVENTER REQUIRED PER THE CITY OF WEST
 PALM BEACH ORD #2853-95. A PERMIT REQUIRED BY A
 LICENSED CONTRACTOR AND MUST BE CERTIFIED BY UTILITIES
 PRIOR TO FINAL INSPECTION. PLEASE CONTACT CITY OF WPB
 UTILITIES AT 561-822-2240 FOR FURTHER DIRECTIONS.
 7. THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON
 THE APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED
 CONTRACT. WPB AMENDMENTS TO THE FBC SEC. 109.3 BUILDING
 PERMIT VALUATIONS. . IF IN THE OPINION OF THE BUILDING
 OFFICIAL, THE CLAIMED VALUATION OF BUILDING,
 ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR
 PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED UNLESS THE
 APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR
 BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO
 MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-08-22 Cont ID  
Sent By mcruz Date 2018-08-22 Time 15:22 Rev Time 0.00
Received By mcruz Date 2018-08-22 Time 15:20 Sent To  
Notes
***NONE***