Plan Review Details - Permit 18080769
Plan Review Stops For Permit 18080769
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-10-31 Cont ID  
Sent By cthroop Date 2018-10-31 Time 08:17 Rev Time 0.00
Received By cthroop Date 2018-10-31 Time 07:36 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-10-12 Cont ID  
Sent By cthroop Date 2018-10-12 Time 07:16 Rev Time 0.00
Received By cthroop Date 2018-10-11 Time 16:50 Sent To E
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-10-31 Cont ID  
Sent By fgiaquin Date 2018-10-31 Time 06:46 Rev Time 0.00
Received By fgiaquin Date 2018-10-31 Time 05:43 Sent To B
Notes
2018-10-31 06:46:16ROUTED TO CHRIS TROOP'S DESK

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-10-18 Cont ID  
Sent By fgiaquin Date 2018-10-18 Time 06:20 Rev Time 0.00
Received By fgiaquin Date 2018-10-18 Time 05:17 Sent To I
Notes
2018-10-18 06:20:12ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. PLANS SAY EXISTING SERVICE IS 200AMPS BUT FUSED AT
 225AMPS? 230.90A NEC
  
 2. PROVIDE FULL AND COMPLETE LOAD CALC FOR PANELBOARD
 A. LOAD CALC ONLY SHOWS NEW "PROPOSED" SSC LOAD.
 PANELBOARD A SCHEDULE ALSO SHOWS EXISING SSC AT 100AMP
 OCP, SURGE SURPRESSOR AT 60AMP OCP, LIGHTING AT 20AMP
 OCP AND GFCI RECEPTACLE AT 20AMP OCP.
 NEC 220.
  
 3. WHERE IS LOCATION OF EXISTING SERVICE? PROVIDE
 LOCATION ON PLAN. FBC 107.2.1
  
 4. VALUE FOR PROJECT IS EXTREMELY LOW. $5000 VALUE ON
 GC'S PERMIT APPLICATION AND $3000 VALUE ON
 ELECTRICIAN'S PERMIT APPLICATION FOR A TOTAL OF $8000.
 PROVIDE CONTRACT SIGNED BY BOTH OWNER OF BUILDING AND
 CONTRACTORS TO INCLUDE ALL MATERIALS, LABOR COSTS, AND
 EQUIPMENT.
  
 FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO III
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WPB
 [email protected]
 CELL: 561-657-1653
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-10-31 Cont ID  
Sent By cthroop Date 2018-10-31 Time 08:17 Rev Time 0.00
Received By cthroop Date 2018-10-29 Time 14:39 Sent To  
Notes
2018-10-30 14:39:48RESUB ROUTED TO FGIAQUINTO

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-10-18 Cont ID  
Sent By fgiaquin Date 2018-10-18 Time 06:20 Rev Time 0.00
Received By fgiaquin Date 2018-09-11 Time 09:46 Sent To  
Notes
2018-09-13 09:47:05ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date 2018-09-21 Cont ID  
Sent By awooten Date 2018-09-21 Time   Rev Time  
Received By awooten Date 2018-09-21 Time   Sent To B
Notes
***NONE***