Plan Review Details - Permit 18080764
Plan Review Stops For Permit 18080764
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-08-24 Cont ID  
Sent By rmcdouga Date 2018-08-24 Time 08:38 Rev Time 0.00
Received By rmcdouga Date 2018-08-24 Time 08:32 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-09-14 Cont ID  
Sent By jleahy Date 2018-09-14 Time 10:47 Rev Time 0.00
Received By jleahy Date 2018-09-14 Time 10:47 Sent To L-LAW
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-08-27 Cont ID  
Sent By jleahy Date 2018-08-27 Time 12:33 Rev Time 0.00
Received By jleahy Date 2018-08-27 Time 12:33 Sent To  
Notes
2018-08-27 12:34:12PROVIDE CUT SHEETS FOR POOL PUMP AND LIGHT FIXTURE
 JLEAHY

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-08-27 Cont ID  
Sent By lcrespo Date 2018-08-27 Time 16:44 Rev Time 0.00
Received By lcrespo Date 2018-08-27 Time 16:44 Sent To  
Notes
2018-08-27 16:47:50THE POOL HAS AN ELECTRICAL HEAT PUMP NO GAS REQUIRED

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-09-21 Cont ID  
Sent By lcrespo Date 2018-09-21 Time 18:17 Rev Time 0.00
Received By lcrespo Date 2018-09-19 Time 15:14 Sent To  
Notes
2018-09-20 15:15:08RESUB ROUTED TO LCRESPO

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-09-14 Cont ID  
Sent By jleahy Date 2018-09-14 Time 10:48 Rev Time 0.00
Received By jleahy Date 2018-08-30 Time 14:16 Sent To  
Notes
2018-08-31 14:16:22RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-08-27 Cont ID  
Sent By lcrespo Date 2018-08-27 Time 17:00 Rev Time 0.00
Received By lcrespo Date 2018-08-15 Time 13:05 Sent To  
Notes
2018-08-16 13:07:19ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 3 Status P Date 2018-09-21 Cont ID  
Sent By lcrespo Date 2018-09-21 Time 18:17 Rev Time 0.00
Received By lcrespo Date 2018-09-21 Time 18:17 Sent To  
Notes
2018-09-21 18:27:2209/21/18 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-09-12 Cont ID  
Sent By lcrespo Date 2018-09-12 Time 17:51 Rev Time 0.00
Received By lcrespo Date 2018-09-12 Time 17:51 Sent To  
Notes
2018-09-12 17:54:3209/12/2018 1ST PLUMBING/POOL REVIEW **DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SECOND REQUEST SUBMIT MANUFACTURES SPECIFICATION OF
 HEAT PUMP POOL HEATERS WHICH SHALL HAVE A MINIMUM COP
 OF 4.0 WHEN TESTED IN ACCORDANCE WITH AHRI 1160, TABLE
 2, STANDARD RATING CONDITIONS - LOW AIR TEMPERATURE. A
 TEST REPORT FROM AN INDEPENDENT LABORATORY IS REQUIRED
 TO VERIFY PROCEDURE COMPLIANCE. 2017 FBC-ENERGY - SEC.
 R 403.10.5
  
 2. SECOND REQUEST THE CLAIMED VALUE APPEARS TO BE
 UNDERESTIMATED ON THE APPLICATION, PLEASE PROVIDE A
 BONA FIDE SIGNED CONTRACT. WPB AMENDMENTS TO THE FBC
 SEC. 109.3 BUILDING PERMIT VALUATIONS.
  
 IF IN THE OPINION OF THE BUILDING OFFICIAL, THE CLAIMED
 VALUATION OF BUILDING, ALTERATION, STRUCTURE,
 ELECTRICAL, GAS, MECHANICAL OR PLUMBING SYSTEMS APPEARS
 TO BE UNDERESTIMATED ON THE APPLICATION, THE PERMIT
 SHALL BE DENIED UNLESS THE APPLICANT CAN SHOW DETAILED,
 QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS
 (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE
 BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION
 OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT
 VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING,
 MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK,
 ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-09-21 Cont ID  
Sent By lcrespo Date 2018-08-27 Time 16:48 Rev Time 0.00
Received By lcrespo Date 2018-08-27 Time 16:48 Sent To  
Notes
2018-08-27 16:48:3708/27/2018 1ST PLUMBING/POOL REVIEW **DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT MANUFACTURES SPECIFICATION OF HEAT PUMP POOL
 HEATERS WHICH SHALL HAVE A MINIMUM COP OF 4.0 WHEN
 TESTED IN ACCORDANCE WITH AHRI 1160, TABLE 2, STANDARD
 RATING CONDITIONS - LOW AIR TEMPERATURE. A TEST REPORT
 FROM AN INDEPENDENT LABORATORY IS REQUIRED TO VERIFY
 PROCEDURE COMPLIANCE. 2017 FBC-ENERGY - SEC. R 403.10.5
  
 2. THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON
 THE APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED
 CONTRACT. WPB AMENDMENTS TO THE FBC SEC. 109.3 BUILDING
 PERMIT VALUATIONS.
  
 IF IN THE OPINION OF THE BUILDING OFFICIAL, THE CLAIMED
 VALUATION OF BUILDING, ALTERATION, STRUCTURE,
 ELECTRICAL, GAS, MECHANICAL OR PLUMBING SYSTEMS APPEARS
 TO BE UNDERESTIMATED ON THE APPLICATION, THE PERMIT
 SHALL BE DENIED UNLESS THE APPLICANT CAN SHOW DETAILED,
 QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS
 (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE
 BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION
 OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT
 VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING,
 MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK,
 ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop Z ZONING
Rev No 2 Status P Date 2018-09-11 Cont ID  
Sent By mcruz Date 2018-09-11 Time 08:05 Rev Time 0.00
Received By mcruz Date 2018-09-11 Time 08:01 Sent To P
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2018-08-21 Cont ID  
Sent By mcruz Date 2018-08-21 Time 16:03 Rev Time 0.00
Received By mcruz Date 2018-08-21 Time 15:59 Sent To  
Notes
2018-08-21 16:02:38ZONING REVIEW FAILED, DUE TO THE FOLLOWING:
  
 1) INDICATE SETBACK FROM POOL EQUIPMENT TO REAR
 PROPERTY LINE. MUST BE AT LEAST 8.5 FEET.
  
 FOR ADDITIONAL INFORMATION, THE ZONING AND LAND
 DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT
 WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH
 PLANNING DEPARTMENT WEBSITE AT
 WWW.CITYOFWPB.COM/PLAN/INDEX.HTM.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved