|
 |
 |
 |
 |
 |
Plan Review Details - Permit 18080584
| Plan Review Stops For Permit 18080584 |
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2018-10-01 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2018-10-01 |
Time |
|
Rev Time |
0.50 |
| Received By |
rrossano |
Date |
2018-10-01 |
Time |
|
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2018-09-28 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2018-09-28 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2018-09-28 |
Time |
10:09 |
Sent To |
ENG |
|
| Notes |
| 2018-09-28 10:12:26 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) INSTALL, TEST AND INSPECT PER THE REQUIREMENTS OF | | | NFPA 24, STANDARD FOR THE | | | INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR | | | APPURTENANCES, 2013 EDITION | | | | | | | | | | | | 2) DO NOT COVER OVER ANY JOINTS PRIOR TO INSPECTIONS. | | | | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2018-10-10 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2018-09-27 |
Time |
07:39 |
Sent To |
|
|
| Notes |
| 2018-09-28 07:39:21 | RESUB ROUTED TO FIRE INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-08-16 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2018-08-16 |
Time |
15:51 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2018-08-14 |
Time |
15:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2018-10-10 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-10-10 |
Time |
12:13 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-10-10 |
Time |
11:03 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2018-10-10 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2018-08-16 |
Time |
15:51 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-08-14 |
Time |
15:23 |
Sent To |
|
|
| Notes |
| 2018-08-16 15:52:46 | 08/16/18 REVIEWED FOR CODE COMPLIANCE | | | (PLUMBING/BACKFLOW) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER | | | | | 2018-08-14 15:23:30 | 08/14/18 APPROVED BY PLUMBING AND SENT TO UTILITIES, | | | LAC |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |