Plan Review Details - Permit 18080275
Plan Review Stops For Permit 18080275
Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2018-12-07 Cont ID  
Sent By jgomez Date 2018-12-07 Time 09:41 Rev Time 0.00
Received By jgomez Date 2018-12-07 Time 08:48 Sent To  
Notes
2018-12-07 08:53:52RESIDENTIAL (R3) REVISION, FOURTH BUILDING REVIEW
 CHECKLIST.
  
  
 ORIGINAL COMMENT:
 (1)- ENERGY CALCULATIONS ARE TAKING THE CEILING FAN
 CREDIT. REVISE GREAT ROOM CEILING FAN SIZE TO COMPLY
 WITH SEC. R405.7.6 FBC-ENERGY CONSERVATION.
  
 RESPONSE:
  
 IT LOOKS LIKE THERE IS CONFUSION BETWEEN ENERGY
 CALCULATIONS AND EQUIPMENT LOAD CALCULATIONS. THEY ARE
 TWO DIFFERENT THINGS. CALCULATIONS SUBMITTED ARE FOR
 THE A/C EQUIPMENT SIZING. THEY ARE NOT THE ENERGY
 CALCULATIONS. ENERGY CALCULATIONS ARE ON FORM
 R405-2014. THESE ARE THE ONES THAT ARE TAKEN THE EXTRA
 CREDIT BY ADDING THE CEILING FANS. THAT'S WHY THE
 CEILING FANS MUST BE INSTALLED. IF CEILING FAN CREDIT
 IS NOT GOING TO BE TAKEN, THEN THE ENERGY CALCULATIONS
 (FORM R405-2014) ARE THE ONES THAT NEED TO BE REVISED
 NOT THE A/C EQUIPMENT SIZING CALCULATIONS.
 NOTE: PLEASE MAKE SURE REVISED ENERGY CALCULATIONS HAVE
 THE NAME OF THE PERSON DOING THE CALCULATIONS AND ARE
 CERTIFIED AT THE BOTTOM OF THE FORM BY THE OWNER OR
 LEGAL AGENT TO AVOID MORE CONFLICTS/DELAYS.
  
  
 ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO HELP EXPEDITE THE REVIEW PROCESS.
  
 ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD
 DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY
 REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2018-10-30 Cont ID  
Sent By jgomez Date 2018-10-30 Time 10:11 Rev Time 0.00
Received By jgomez Date 2018-10-30 Time 09:51 Sent To  
Notes
2018-10-30 10:22:26RESIDENTIAL (R3) REVISION, FOURTH BUILDING REVIEW
 CHECKLIST.
  
  
 ORIGINAL COMMENT:
 (1)- ENERGY CALCULATIONS ARE TAKING THE CEILING FAN
 CREDIT. REVISE GREAT ROOM CEILING FAN SIZE TO COMPLY
 WITH SEC. R405.7.6 FBC-ENERGY CONSERVATION.
  
 RESPONSE:
  
 IT LOOKS LIKE THERE IS CONFUSION BETWEEN ENERGY
 CALCULATIONS AND EQUIPMENT LOAD CALCULATIONS. THEY ARE
 TWO DIFFERENT THINGS. CALCULATIONS SUBMITTED ARE FOR
 THE A/C EQUIPMENT SIZING. THEY ARE NOT THE ENERGY
 CALCULATIONS. ENERGY CALCULATIONS ARE ON FORM
 R405-2014. THESE ARE THE ONES THAT ARE TAKEN THE EXTRA
 CREDIT BY ADDING THE CEILING FANS. THAT'S WHY THE
 CEILING FANS MUST BE INSTALLED. IF CEILING FAN CREDIT
 IS NOT GOING TO BE TAKEN, THEN THE ENERGY CALCULATIONS
 (FORM R405-2014) ARE THE ONES THAT NEED TO BE REVISED
 NOT THE A/C EQUIPMENT SIZING CALCULATIONS.
 NOTE: PLEASE MAKE SURE REVISED ENERGY CALCULATIONS HAVE
 THE NAME OF THE PERSON DOING THE CALCULATIONS AND ARE
 CERTIFIED AT THE BOTTOM OF THE FORM BY THE OWNER OR
 LEGAL AGENT TO AVOID MORE CONFLICTS/DELAYS.
  
  
 ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO HELP EXPEDITE THE REVIEW PROCESS.
  
 ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD
 DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY
 REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2018-10-22 Cont ID  
Sent By jgomez Date 2018-10-22 Time 16:43 Rev Time 0.00
Received By jgomez Date 2018-10-22 Time 16:31 Sent To  
Notes
2018-10-22 16:32:231- REMAINDER: BUILDING REVIEW WAS ALSO APPROVED ON
 01/23/18 WITH PROVISO. PROVIDE INFORMATION REQUESTED ON
 PROVISO TO AVOID CONFLICTS/DELAYS. SEE COPY OF BUILDING
 PROVISO BELOW:
  
 BUILDING REVIEW APPROVED WITH PROVISO:
 (1)- ENERGY CALCULATIONS ARE TAKING THE CEILING FAN
 CREDIT. REVISE GREAT ROOM CEILING FAN SIZE TO COMPLY
 WITH SEC. R405.7.6 FBC-ENERGY CONSERVATION.
  
 RESPONSE:
 52" CEILING FAN DOESN'T COMPLY WITH TABLE R405.7.6.
 REVISE AS REQUIRED.
  
  
 ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO HELP EXPEDITE THE REVIEW PROCESS.
  
 ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD
 DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY
 REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2018-09-25 Cont ID  
Sent By jgomez Date 2018-09-25 Time 11:34 Rev Time 0.00
Received By jgomez Date 2018-09-25 Time 11:27 Sent To Z
Notes
2018-09-25 11:27:281- REMAINDER: BUILDING REVIEW WAS ALSO APPROVED ON
 01/23/18 WITH PROVISO. PROVIDE INFORMATION REQUESTED ON
 PROVISO TO AVOID CONFLICTS/DELAYS. SEE COPY OF BUILDING
 PROVISO BELOW:
  
 BUILDING REVIEW APPROVED WITH PROVISO:
 (1)- ENERGY CALCULATIONS ARE TAKING THE CEILING FAN
 CREDIT. REVISE GREAT ROOM CEILING FAN SIZE TO COMPLY
 WITH SEC. R405.7.6 FBC-ENERGY CONSERVATION.
  
 RESPONSE:
 REPEAT COMMENT. NOT ADDRESSED.
  
  
 (2)- PROVIDE PRODUCT APPROVAL FOR THE OVERHEAD GARAGE
 DOOR THAT MEETS THE DESIGN PRESSURES CALCULATED BY THE
 ARCHITECT ON SHEET A-301. (OK. SEE REVISION 18091139)
  
 RESPONSE:
 DESIGN PRESSURES OF GARAGE DOOR NOA 15-0908.08 DON'T
 MEET THE DESIGN PRESSURES CALCULATED BY THE ARCHITECT
 ON SHEET A-301. NEED PRODUCT APPROVAL THAT MEETS OR
 EXCEEDS CALCULATED DESIGN PRESSURES.
  
 (3) DESIGNER OF RECORD TO APPROVE ABOVE PRODUCT
 APPROVAL. SEC. 107.3.4.1 CITY AMENDMENTS. NOTE: PLEASE
 PLACE THE REVIEW STAMP ON THE FRONT OF THE PRODUCT
 APPROVAL NOT ON THE BACK.
  
  
 ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO HELP EXPEDITE THE REVIEW PROCESS.
  
 ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD
 DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY
 REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-09-25 Cont ID  
Sent By jgomez Date 2018-08-13 Time 11:26 Rev Time 0.00
Received By jgomez Date 2018-08-13 Time 11:26 Sent To  
Notes
2018-09-25 11:26:14REMAINDER: BUILDING REVIEW WAS ALSO APPROVED ON
 01/23/18 WITH PROVISO. PROVIDE INFORMATION REQUESTED ON
 PROVISO TO AVOID CONFLICTS/DELAYS. SEE COPY OF BUILDING
 PROVISO BELOW:
  
 BUILDING REVIEW APPROVED WITH PROVISO:
 (1)- ENERGY CALCULATIONS ARE TAKING THE CEILING FAN
 CREDIT. REVISE GREAT ROOM CEILING FAN SIZE TO COMPLY
 WITH SEC. R405.7.6 FBC-ENERGY CONSERVATION.
 (2)- SOIL TEST REPORT SUBMITTED NEEDS THE ENGINEER'S
 ORIGINAL SIGNATURE (NOT COPY). CHAPTER 471 F.S.
 (3)- PROVIDE PRODUCT APPROVAL FOR THE OVERHEAD GARAGE
 DOOR THAT MEETS THE DESIGN PRESSURES CALCULATED BY THE
 ARCHITECT ON SHEET A-301.
 (4)- DESIGNER OF RECORD TO APPROVE ABOVE PRODUCT
 APPROVAL. SEC. 107.3.4.1 CITY AMENDMENTS. NOTE: PLEASE
 PLACE THE REVIEW STAMP ON THE FRONT OF THE PRODUCT
 APPROVAL NOT ON THE BACK.
 (5)- PROVIDE SURVEY (2 COPIES) THAT MATCHES PROPOSED
 HOUSE IN LOT "B" AND THE ADDRESS 245 EDMOR RD.
  
 ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO HELP EXPEDITE THE REVIEW PROCESS.
  
 ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD
 DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY
 REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
 ****REVIEW IN PROGRESS.....

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2018-12-07 Cont ID  
Sent By jgomez Date 2018-12-07 Time 09:41 Rev Time 0.00
Received By jgomez Date 2018-11-30 Time 13:13 Sent To I
Notes
2018-12-03 13:13:35RESUB ROUTED TO JGOMEZ

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2018-10-30 Cont ID  
Sent By jgomez Date 2018-10-30 Time 10:42 Rev Time 0.00
Received By jgomez Date 2018-10-26 Time 15:05 Sent To I
Notes
2018-10-29 15:06:07RESUB ROUTED TO JGOMEZ

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-10-22 Cont ID  
Sent By jgomez Date 2018-10-22 Time 16:51 Rev Time 0.00
Received By jgomez Date 2018-10-17 Time 15:28 Sent To I
Notes
2018-10-18 15:28:33RESUB ROUTED TO JGOMEZ

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-09-25 Cont ID  
Sent By jgomez Date 2018-09-25 Time 11:37 Rev Time 0.00
Received By jgomez Date 2018-09-12 Time 15:36 Sent To  
Notes
2018-09-13 15:36:14RESUB OF REVISION ROUTED TO JGOMEZ

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-08-13 Cont ID  
Sent By jgomez Date 2018-08-13 Time 09:29 Rev Time 0.00
Received By jgomez Date 2018-08-06 Time 15:28 Sent To I
Notes
2018-08-07 15:28:22REVISION ROUTED TO JGOMEZ

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2018-12-07 Cont ID  
Sent By jgomez Date 2018-12-07 Time 09:26 Rev Time 0.00
Received By jgomez Date 2018-12-07 Time 09:05 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2018-10-22 Cont ID  
Sent By jgomez Date 2018-10-22 Time 16:35 Rev Time 0.00
Received By jgomez Date 2018-10-22 Time 16:34 Sent To I
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2018-09-25 Cont ID  
Sent By jgomez Date 2018-09-25 Time 11:28 Rev Time 0.00
Received By jgomez Date 2018-09-25 Time 10:15 Sent To  
Notes
2018-09-25 10:17:27RESIDENTIAL (R3) MECHANICAL SECOND REVISION REVIEW
 CHECKLIST.
 CODE: FBC 5TH EDITION (2014) AND CITY AMENDMENTS.
  
 ORIGINAL COMMENT:
 (1)- PROVIDE COMPLETE EQUIPMENT SIZING CALCULATIONS
 SHOWING COMPLIANCE WITH ALL THE REQUIREMENTS OF SEC.
 R403.6.1 FBC-ENERGY CONSERVATION, 5TH EDITION (2014).
  
 RESPONSE:
 EQUIPMENT SIZING CALCULATIONS SUBMITTED ARE FOR THE
 WRONG ADDRESS. THIS IS 245 EDMOR RD NOT 241 EDMOR RD.
 PROVIDE CALCULATIONS FOR THE CORRECT HOUSE. SEC.
 107.2.1 CITY AMENDMENTS.
  
 ORIGINAL COMMENT:
 (2) GUEST BEDROOM ON THE 1ST FLOOR DOESN'T COMPLY WITH
 THE BALANCED RETURN AIR SEC. M1602.4 FBC-RESIDENTIAL.
 PROVIDE TRANSFER DUCT OR GRILL AND SPECIFY SIZE.
  
 RESPONSE:
 REPEAT COMMENT. PLANS SUBMITTED WERE NOT REVISED.
  
 ORIGINAL COMMENT:
 (3) THERE ARE SOME SUPPLY AIR REGISTERS ON THE FIRST
 AND SECOND FLOOR THAT ARE MISSING THE DUCT SIZE AND
 SIZE OF REGISTER. PROVIDE COMPLETE INFORMATION., SEC.
 107.3.5.3(10) CITY AMENDMENTS.
  
  
 RESPONSE:
 REPEAT COMMENT. PLANS SUBMITTED WERE NOT REVISED.
  
  
 ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO HELP EXPEDITE THE REVIEW PROCESS.
  
 ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD
 DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY
 REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
2018-09-18 18:49:05 
 ****REVIEW IN PROGRESS.....

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2018-08-13 Cont ID  
Sent By jgomez Date 2018-08-13 Time 09:15 Rev Time 0.00
Received By jgomez Date 2018-08-13 Time 09:14 Sent To  
Notes
2018-08-13 09:13:43RESIDENTIAL (R3) MECHANICAL REVISION REVIEW COMMENTS
 CODE: FBC 5TH EDITION (2014) AND CITY AMENDMENTS.
  
 1- REVISION FEES ARE NOT PAID. NEED TO PAID THE
 REVISION FEES INCLUDING THE ADDITIONAL FEES FOR REVISED
 DRAWINGS ADDRESSING COMMENTS BELOW. NOTE: REVISION
 RE-SUBMITTAL WILL NOT BE REVIEWED UNTIL ALL FEES ARE
 PAID.
  
 2- ORIGINAL MECHANICAL REVIEW WAS APPROVED ON 01/23/18
 WITH A PROVISO. COMPLETE EQUIPMENT SIZING CALCULATIONS
 WERE REQUESTED AND WERE NOT SUBMITTED. A/C PLAN WAS
 REVISED BUT SIZING CALCULATIONS WERE NOT SUBMITTED.
 PROVIDE COMPLETE EQUIPMENT SIZING CALCULATIONS. SEE
 COPY OF PROVISO BELOW.
  
 MECHANICAL REVIEW APPROVED WITH PROVISO:
 (1)- PROVIDE COMPLETE EQUIPMENT SIZING CALCULATIONS
 SHOWING COMPLIANCE WITH ALL THE REQUIREMENTS OF SEC.
 R403.6.1 FBC-ENERGY CONSERVATION, 5TH EDITION (2014).
  
  
  
 3- GUEST BEDROOM ON THE 1ST FLOOR DOESN'T COMPLY WITH
 THE BALANCED RETURN AIR SEC. M1602.4 FBC-RESIDENTIAL.
 PROVIDE TRANSFER DUCT OR GRILL AND SPECIFY SIZE.
  
 4- THERE ARE SOME SUPPLY AIR REGISTERS ON THE FIRST AND
 SECOND FLOOR THAT ARE MISSING THE DUCT SIZE AND SIZE OF
 REGISTER. PROVIDE COMPLETE INFORMATION., SEC.
 107.3.5.3(10) CITY AMENDMENTS.
  
  
 5- REMAINDER: BUILDING REVIEW WAS ALSO APPROVED ON
 01/23/18 WITH PROVISO. PROVIDE INFORMATION REQUESTED ON
 PROVISO TO AVOID CONFLICTS/DELAYS. SEE COPY OF BUILDING
 PROVISO BELOW:
  
 BUILDING REVIEW APPROVED WITH PROVISO:
 (1)- ENERGY CALCULATIONS ARE TAKING THE CEILING FAN
 CREDIT. REVISE GREAT ROOM CEILING FAN SIZE TO COMPLY
 WITH SEC. R405.7.6 FBC-ENERGY CONSERVATION.
 (2)- SOIL TEST REPORT SUBMITTED NEEDS THE ENGINEER'S
 ORIGINAL SIGNATURE (NOT COPY). CHAPTER 471 F.S.
 (3)- PROVIDE PRODUCT APPROVAL FOR THE OVERHEAD GARAGE
 DOOR THAT MEETS THE DESIGN PRESSURES CALCULATED BY THE
 ARCHITECT ON SHEET A-301.
 (4)- DESIGNER OF RECORD TO APPROVE ABOVE PRODUCT
 APPROVAL. SEC. 107.3.4.1 CITY AMENDMENTS. NOTE: PLEASE
 PLACE THE REVIEW STAMP ON THE FRONT OF THE PRODUCT
 APPROVAL NOT ON THE BACK.
 (5)- PROVIDE SURVEY (2 COPIES) THAT MATCHES PROPOSED
 HOUSE IN LOT "B" AND THE ADDRESS 245 EDMOR RD.
  
 ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO HELP EXPEDITE THE REVIEW PROCESS.
  
 ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD
 DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY
 REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2018-09-27 Cont ID  
Sent By awooten Date 2018-09-27 Time   Rev Time 0.00
Received By awooten Date 2018-09-27 Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved