| 2018-07-31 19:27:50 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE ENGINEER'S SIGNATURES ON THE TRUSS DRAWINGS ARE |
| | PHOTO COPIES. FAC 61G15-23.003 PROCEDURES FOR |
| | PHYSICALLY SIGNING AND SEALING PLANS, SPECIFICATIONS, |
| | REPORTS OR OTHER DOCUMENTS. |
| | ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER |
| | DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN |
| | ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025, |
| | F.S., AND RULE 61G15-23.001, F.A.C. MUST BE PHYSICALLY |
| | SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE |
| | PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE. |
| | (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE |
| | LICENSEE?S SIGNATURE ON EACH PAGE REQUIRED TO BE |
| | SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR |
| | COPIED IMAGE OF THE LICENSEE'S SIGNATURE SHALL NOT BE |
| | USED. |
| | (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY |
| | CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY |
| | OVERLAPPING THE LICENSEE'S SIGNATURE ON EACH PAGE |
| | REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL |
| | NOT RENDER THE SIGNATURE ILLEGIBLE. |
| | |
| | 2) THE PLANS SPECIFY THE ROOFING MATERIAL AS LOW |
| | PROFILE CONCRETE ROOF TILE AND THE PRODUCT APPROVALS |
| | THAT WERE SUBMITTED ARE FOR A CONCRETE TILE ROOF. THE |
| | TRUSS LAYOUT SPECIFIES THE ROOFING MATERIAL AS METAL. |
| | COORDINATE AND MAKE THE NECESSARY CORRECTIONS AND |
| | REVISIONS. FBC 107.2.1 |
| | |
| | 3) THE FLOOR FRAMING PLANS SHOW STEEL I BEAMS FOR BEAMS |
| | 1 AND 2 ON THE FLOOR FRAMING PLAN WHERE THE TRUSS |
| | LAYOUT PLANS HAVE 3 PLY VERSALAMS. THE ENGINEER IS |
| | REQUIRED TO PROVIDE SIGNED AND SEALED REVISED PLANS FOR |
| | THESE CHANGES. FBC 107.2.1 |
| | |
| | 4) THE APPROVED PLANS DO NOT SHOW THE FLOOR TRUSSES FOR |
| | STORAGE AT THE GARAGE. PLEASE CLARIFY. FBC 107.2.1 |
| | |
| | 5) THE FLOOR TRUSS LAYOUT PLAN HAS A HANGER SCHEDULE |
| | THAT SPECIFIES THE HANGERS FOR THE GARAGE STORAGE. THE |
| | ENGINEER WILL NEED TO TAKE RESPONSIBILTY BY SIGNING AND |
| | SEALING THE DRAWINGS. FAC 61G15-23.003. |
| | |
| | 6) THE ROOF FRAMING PLAN ON SHEET S2.1 HAS SOME |
| | DIFFERENCES FROM THE ROOF TRUSS LAYOUT DRAWINGS. THE |
| | ROOF FRAMING PLAN ON S-2 DOES NOT SPECIFY THE ANCHORS |
| | FOR THE GIRDER TRUSSES. THE ENGINEER OF RECORD WILL |
| | ALSO HAVE TO SPECIFY ALL OF THE HANGERS FOR THE ROOF |
| | AND FLOOR TRUSSES THAT ARE NOT SPECIFIED BY THE TRUSS |
| | ENGINEER. FBC-R802.1.7.1 |
| | |
| | |
| | |
| | |
| | |
| | |