| Plan Review Stops For Permit 18070900 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-11-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-11-26 |
Time |
08:59 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-11-26 |
Time |
08:59 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-07-31 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-31 |
Time |
11:37 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-07-31 |
Time |
11:37 |
Sent To |
I |
|
| Notes |
| 2018-07-31 11:40:41 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE GENERATOR PAD ENGINEERING IS REQUIRED TO HAVE | | | THE ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE. | | | 61G15-23.003 PROCEDURES FOR PHYSICALLY SIGNING AND | | | SEALING PLANS, SPECIFICATIONS, REPORTS OR OTHER | | | DOCUMENTS. | | | ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER | | | DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN | | | ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025, | | | F.S., AND RULE 61G15-23.001, F.A.C. MUST BE PHYSICALLY | | | SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE | | | PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE. | | | (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE | | | LICENSEE?S SIGNATURE ON EACH PAGE REQUIRED TO BE | | | SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR | | | COPIED IMAGE OF THE LICENSEE?S SIGNATURE SHALL NOT BE | | | USED. | | | (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY | | | CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY | | | OVERLAPPING THE LICENSEE?S SIGNATURE ON EACH PAGE | | | REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL | | | NOT RENDER THE SIGNATURE ILLEGIBLE. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2018-07-27 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-07-27 |
Time |
13:17 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-07-27 |
Time |
13:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2018-11-26 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-11-26 |
Time |
05:18 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-11-26 |
Time |
04:57 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2018-07-28 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-07-28 |
Time |
07:06 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-07-28 |
Time |
06:37 |
Sent To |
|
|
| Notes |
| 2018-07-28 07:06:40 | 1) THE SUBMITTED GAS PLAN REFERS TO THE 2007 FBC.AND | | | ALSO THE 2017 FBC. REMOVE THE REFERENCE TO THE 2007 | | | FBC. | | | 2) THE GAS PLAN REFERS TO TABLE 402.4(20). THIS SIZING | | | TABLE IS FOR A LESS THAN 2 PSI SYSTEM YET THE GAS PLAN | | | CALLS OUT A 2 PSI SYSTEM. CLARIFY. | | | 3) SHOW THE LOCATION OF ALL SHUTOFF VALVES AND | | | REGULATORS. A LISTED SHUTOFF VALVE IS REQUIRED | | | IMMEDIATELY AHEAD OF EACH MP REGULATOR. 2017 FBCR SEC. | | | G2420.4. | | | 4) SHOW THE TYPE OF PIPE AND PIPE SIZE AT THE OUTLET OF | | | THE 2 PSI METER . WPB AMEND. TO FBC SEC. 107.2.1. | | | 5) ) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FLEX | | | CONNECTOR FOR THE GENERATOR. THE FLEX CONNECTOR SHALL | | | BE APPROVED TO FLOW THE MAXIMUM BTU LOAD FOR THE | | | GENERATOR. 2017 FBCR SEC. G2422.1 (8), 2017 FBC-FUEL | | | GAS SEC. 411.1.3.2. | | | 6) A SEDIMENT TRAP IS REQUIRED AT THE GENERATOR.2017 | | | FBC-FUEL GAS SEC.408.4. | | | 7) SUBMIT MANUFACTURER?S SPECIFICATIONS AND | | | INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS. | | | REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING | | | SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON | | | THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING | | | INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR | | | CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017 | | | FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1. | | | 8) AN MP REGULATOR IS REQUIRED AT THE GENERATOR. | | | 9) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES | | | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE | | | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM | | | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE | | | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL | | | GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1) | | | THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8, | | | G2413.1, G2413.2, & G2413.3. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-11-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-11-26 |
Time |
08:59 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-11-02 |
Time |
11:30 |
Sent To |
|
|
| Notes |
| 2018-11-06 11:31:02 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-07-31 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-31 |
Time |
11:38 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-07-19 |
Time |
14:34 |
Sent To |
|
|
| Notes |
| 2018-07-20 14:34:46 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2018-11-27 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-11-27 |
Time |
11:34 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-11-27 |
Time |
11:30 |
Sent To |
PC |
|
| Notes |
| 2018-11-27 11:34:12 | ZONING PASSED WITH PROVISO: GENERATOR SHALL BE AT LEAST | | | 6' FROM NORTH PROPERTY LINE. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2018-11-09 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-11-09 |
Time |
09:21 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-11-09 |
Time |
09:19 |
Sent To |
G |
|
| Notes |
| 2018-11-09 09:21:12 | ZONING REVIEW FAILED, DUE TO THE FOLLOWING: | | | | | | 1) REPEAT COMMENT - PURSUANT TO 94-305(B)(4) - | | | MECHANICAL EQUIPMENT MAY NOT PROJECT MORE THAN 4 FEET | | | INTO A SETBACK. GENERATOR SHALL BE AT LEAST 6' FROM | | | NORTH PROPERTY LINE. | | | | | | FOR ADDITIONAL INFORMATION, THE ZONING AND LAND | | | DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT | | | WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH | | | PLANNING DEPARTMENT WEBSITE AT | | | WWW.CITYOFWPB.COM/PLAN/INDEX.HTM. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO | | | CONTACT ME. | | | | | | MAGGIE CRUZ | | | ASSOCIATE PLANNER | | | PLANNING AND ZONING DEPARTMENT | | | TEL: 561-822-1442 | | | E-MAIL: [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2018-07-25 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-07-25 |
Time |
13:24 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-07-25 |
Time |
13:20 |
Sent To |
|
|
| Notes |
| 2018-07-25 13:24:03 | ZONING REVIEW FAILED, DUE TO THE FOLLOWING: | | | | | | 1) PURSUANT TO 94-305(B)(4) - MECHANICAL EQUIPMENT MAY | | | NOT PROJECT MORE THAN 4 FEET INTO A SETBACK. GENERATOR | | | SHALL BE AT LEAST 6' FROM NORTH PROPERTY LINE. | | | | | | FOR ADDITIONAL INFORMATION, THE ZONING AND LAND | | | DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT | | | WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH | | | PLANNING DEPARTMENT WEBSITE AT | | | WWW.CITYOFWPB.COM/PLAN/INDEX.HTM. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO | | | CONTACT ME. | | | | | | MAGGIE CRUZ | | | ASSOCIATE PLANNER | | | PLANNING AND ZONING DEPARTMENT | | | TEL: 561-822-1442 | | | E-MAIL: [email protected] |
|
|