Plan Review Details - Permit 18070817
| Plan Review Stops For Permit 18070817 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-08-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-08-28 |
Time |
11:16 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-08-28 |
Time |
11:05 |
Sent To |
I |
|
| Notes |
| 2018-08-28 12:57:16 | FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND | | | BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO | | | FILLING THE POOL WITH WATER. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-07-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-30 |
Time |
10:13 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-08-28 |
Time |
10:14 |
Sent To |
I |
|
| Notes |
| 2018-07-30 10:27:48 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) VALUATION OF POOL ON THE APPLICATION APPEARS TO BE | | | UNDER VALUED. SUBMIT A COPY OF THE SIGNED CONTRACT TO | | | VERIFY VALUATION. FBC 109.3 BUILDING PERMIT VALUATION. | | | FOR PERMITTING PURPOSES, VALUATION OF BUILDINGS AND | | | SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE | | | STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, INTERIOR | | | FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN | | | FEES, MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING | | | ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE | | | LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION COST | | | ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS | | | PUBLISHED BY INTERNATIONAL CODE CONGRESS. FINAL | | | BUILDING PERMIT VALUATION SHALL BE SET BY THE BUILDING | | | OFFICIAL. | | | | | | 2) FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND | | | BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO | | | FILLING THE POOL WITH WATER. | | | | | | 3) NOTE: A POOL ELECTRICAL SUB-PERMIT IS REQUIRED TO BE | | | SUBMITTED BEFORE THE POOL PERMIT WILL BE ISSUED. | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2018-07-26 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-07-26 |
Time |
15:33 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-07-26 |
Time |
15:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2018-07-28 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-07-28 |
Time |
05:38 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-07-28 |
Time |
05:38 |
Sent To |
|
|
| Notes |
| 2018-07-28 05:39:08 | THERE IS NO GAS ASSOCIATED WITH THIS POOL. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-08-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-08-28 |
Time |
12:57 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-08-21 |
Time |
14:11 |
Sent To |
|
|
| Notes |
| 2018-08-22 14:11:49 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-07-30 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-30 |
Time |
10:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-07-18 |
Time |
14:19 |
Sent To |
|
|
| Notes |
| 2018-07-19 14:19:48 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2018-08-28 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-08-28 |
Time |
10:01 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-08-28 |
Time |
06:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-07-28 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-07-28 |
Time |
05:47 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-07-28 |
Time |
05:33 |
Sent To |
|
|
| Notes |
| 2018-07-28 05:25:43 | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | | FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS | | | MUST INCLUDE ALL OF THE SYSTEM COMPONENTS IN THE PIPING | | | SYSTEM INCLUDING THE FILTER. | | | | | | 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. | | | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC | | | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS | | | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH | | | CALCULATIONS. | | | | | | 3) THE VALUE LISTED FOR THE POOL ON THE APPLICATION | | | APPEARS LOW. SUBMIT A COPY OF A BONA FIDE SIGNED | | | CONTRACT FOR THGIS WORK. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2018-07-24 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-07-24 |
Time |
14:20 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-07-24 |
Time |
13:43 |
Sent To |
|
|
| Notes |
|
|
|