Plan Review Details - Permit 18070523
Plan Review Stops For Permit 18070523
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-12-10 Cont ID  
Sent By jgomez Date 2018-12-10 Time 14:51 Rev Time 0.00
Received By jgomez Date 2018-12-10 Time 13:35 Sent To  
Notes
2018-12-10 14:02:08BUILDING REVIEW APPROVED WITH PROVISO (NOTE: PROVIDE
 INFORMATION PRIOR TO INSTALLATION AND INSPECTION TO
 AVOID CONFLICTS/DELAYS):
 1- FLOORING SOUND INSULATION:
 A) PROVIDE 2 COPIES OF THE FLAME SPREAD INDEX AND SMOKE
 DEVELOPED INDEX TEST DONE IN ACCORDANCE WITH ASTM E 84
 OR UL 723.
 B) PROVIDE 2 COPIES OF THE SOUND TRANSMISSION CLASS
 (STC) TEST DONE IN ACCORDANCE WITH ASTM E 90.
 C) PROVIDE 2 COPIES OF THE IMPACT INSULATION CLASS
 (IIC) TEST DONE IN ACCORDANCE WITH ASTM E 492.
 NOTE: TEST SAMPLE TO MATCH BUILDING CONSTRUCTION.
  
 2- THIS IS A THRESHOLD BUILDING AND THE SCOPE OF WORK
 INCLUDES ALTERATION OF THE STRUCTURAL DESIGN OF THE
 BUILDING. SPECIAL INSPECTOR WILL BE REQUIRED FOR
 INSPECTIONS AT THE SHEARWALL. SEC. 110.8 CITY
 AMENDMENTS.
 NOTE: PLEASE CONTACT KEN CONRAD (561-805-6666) OR
 RICHARD GATHRIGHT (561-805-6679) PRIOR TO START OF
 WORK.
  
 3- THRESHOLD BUILDING: ONLY GENERAL CONTRACTOR CAN DO
 STRUCTURAL WORK. SEC. 110.3.7.5 CITY AMENDMENTS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-08-29 Cont ID  
Sent By jgomez Date 2018-08-29 Time 15:34 Rev Time 0.00
Received By jgomez Date 2018-08-29 Time 08:54 Sent To  
Notes
2018-08-29 15:34:35BUILDING REVIEW COMMENTS
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS
  
 1- COMBINING TWO ADJACENT UNITS REQUIRES A UNITY OF
 TITLE:
  
 A UNITY OF TITLE IS REQUIRED. SUBMIT APPLICATION TO THE
 ENGINEERING DEPARTMENT:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 NOTE:
 IF THIS HAS ALREADY BEEN DONE, PLEASE PROVIDE A COPY OF
 THE RECORDED DOCUMENT.
  
  
 2- ENGINEER'S LETTER SUBMITTED REGARDING NEW OPENING IN
 EXISTING CAST IN PLACE CONCRETE SHEARWALL:
 A) SCOPE OF WORK INCLUDES ALTERATION OF THE STRUCTURAL
 DESIGN OF THE BUILDING. ENGINEER'S LETTER SUBMITTED IS
 TOO GENERAL. ENGINEER'S STATEMENT SHALL EITHER A)
 COMPARE THE REMAINING SHEARWALL AREA AT THIS FLOOR TO
 THE SHEARWALL AREA OF THE LOWER FLOOR OR B) GIVE SOME
 OTHER FORM OF JUSTIFICATION FOR REDUCING SHEAR WALL
 AREA. SEC. 107.2.1.2 CITY AMENDMENTS.
  
 B) ENGINEER'S LETTER NEED TO HAVE COMPLETE AND CORRECT
 ADDRESS. SEC. 107.2.1 CITY AMENDMENTS. THIS BUILDING IS
 NOT LOCATED IN MIAMI, FLORIDA. THE CORRECT ADDRESS IS
 550 OKEECHOBEE BLVD UNITS 727 AND 728, WEST PALM BEACH,
 FLORIDA 33401.
  
 C) ENGINEER'S LETTER NEEDS ORIGINAL SEAL AND SIGNATURE
 AS REQUIRED BY CHAPTER 471 WHEN SUBMITTING DOCUMENTS
 FOR PUBLIC RECORDS.
  
 3- FLOORING SOUND INSULATION INFORMATION ON SHEET
 A-1.1: ARCHITECT IS SPECIFYING IMPACT INSULATION (71
 DB) AND SOUND TRANSMISSION CONTACT (71 DB). TYPICALLY
 THIS RATING IS ONLY ACQUIRED WHEN USING SOUND
 INSULATION ASSEMBLIES THAT HAVE A SUSPENDED ACOUSTICAL
 CEILING. SEE TEST REPORTS. TYPICALLY BUILDINGS IN THIS
 AREA DON'T HAVE THE SUSPENDED ACOUSTICAL CEILING IN ALL
 AREAS. AND, ACCORDING TO CITY RECORDS, THIS BUILDING
 DOESN'T HAVE A SUSPENDED ACOUSTICAL CEILING THROUGHOUT
 THE APARTMENT. REVISE SPECIFICATIONS AS REQUIRED. THE
 MIN DB REQUIRED BY THE CODE IS 50DB. SEC. 1207.2 AND
 1207.3 FBC..
  
 4- FLOORING SOUND INSULATION MATERIAL. (NOTE: THIS MAY
 BE SUBMITTED LATER BEFORE INSTALLATION AS A DEFERRED
 SUBMITTAL):
 A) PROVIDE 2 COPIES OF THE FLAME SPREAD INDEX AND SMOKE
 DEVELOPED INDEX TEST DONE IN ACCORDANCE WITH ASTM E 84
 OR UL 723 AS REQUIRED BY SEC. 720.1 OF FBC 6TH EDITION
 (2017).
  
 B) PROVIDE 2 COPIES OF THE SOUND TRANSMISSION CLASS
 (STC) TEST DONE IN ACCORDANCE WITH ASTM E 90 AS
 REQUIRED BY SEC. 1207.2 OF FBC 6TH EDITION (2017).
  
 C) PROVIDE 2 COPIES OF THE IMPACT INSULATION CLASS
 (IIC) TEST DONE IN ACCORDANCE WITH ASTM E 492 AS
 REQUIRED BY SEC. 1207.3 OF FBC 6TH EDITION (2017).
  
 NOTE: TEST SAMPLE TO MATCH BUILDING CONSTRUCTION. THERE
 ARE TESTS FOR 6" OR 8" CONCRETE SLABS WITH OR WITHOUT
 ACOUSTICAL CEILING. TYPICALLY THERE ARE NOT SUSPENDED
 ACOUSTICAL CEILINGS IN THESE BUILDINGS.
  
  
 4- THIS IS A THRESHOLD BUILDING AND THE SCOPE OF WORK
 INCLUDES ALTERATION OF THE STRUCTURAL DESIGN OF THE
 BUILDING. SPECIAL INSPECTOR WILL BE REQUIRED FOR
 INSPECTIONS AT THE SHEARWALL. SEC. 110.8 CITY
 AMENDMENTS.
 NOTE: PLEASE CONTACT THIS OFFICE WHEN CONTRACTOR IS
 SELECTED FOR SPECIAL INSPECTOR PROCEDURE.
  
 5- THRESHOLD BUILDING: ONLY GENERAL CONTRACTOR CAN DO
 STRUCTURAL WORK. SEC. 110.3.7.5 CITY AMENDMENTS.
  
  
 ****PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO HELP EXPEDITE THE REVIEW PROCESS.
  
 ****PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD
 DRAWING. SUBMIT OLD DRAWINGS FOR REFERENCE OF ALREADY
 REVIEWED DRAWINGS. DO NOT STAPLE OLD DRAWINGS TO PLANS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-11-15 Cont ID  
Sent By jleahy Date 2018-11-15 Time 16:45 Rev Time 0.00
Received By jleahy Date 2018-11-15 Time 16:45 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-08-08 Cont ID  
Sent By jleahy Date 2018-08-08 Time 16:36 Rev Time 0.00
Received By jleahy Date 2018-08-08 Time 16:36 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-08-07 Cont ID  
Sent By skennedy Date 2019-08-07 Time 13:54 Rev Time 0.00
Received By skennedy Date 2019-08-07 Time 13:54 Sent To  
Notes
2019-08-07 13:54:30PER VINCE NOEL. RECORDED BK 30807 PG 1178.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2019-08-05 Cont ID  
Sent By shill Date 2019-08-05 Time 07:24 Rev Time 0.00
Received By shill Date 2019-08-05 Time 07:24 Sent To  
Notes
2019-08-05 07:25:01****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 A UNITY OF TITLE IS REQUIRED. SUBMIT APPLICATION TO THE
 ENGINEERING DEPARTMENT:
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 IF THIS HAS ALREADY BEEN DONE, PLEASE PROVIDE A COPY OF
 THE RECORDED DOCUMENT.
2019-07-19 09:18:56FOR UNITY OF TITLE REVIEW.

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2018-10-30 Cont ID  
Sent By scaldero Date 2018-10-30 Time 10:34 Rev Time 0.00
Received By scaldero Date 2018-10-30 Time 10:33 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2018-07-17 Cont ID  
Sent By scaldero Date 2018-07-17 Time 10:56 Rev Time 0.00
Received By scaldero Date 2018-07-17 Time 10:56 Sent To  
Notes
2018-07-17 10:56:47PERMIT # 18070523
 REVIEW COMMENTS - FIRE DEPARTMENT
  
 1) SEPARATE PLANS AND PERMITS ARE REQUIRED FOR THE
 INSTALLATION OR MODIFICATION OF THE FIRE SPRINKLER
 SYSTEM AND/OR FIRE ALARM SYSTEM.
  
  
 SUE ELLEN CALDERON
 ASSISTANT FIRE MARSHAL
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-12-10 Cont ID  
Sent By gjohnson Date 2018-12-10 Time 17:31 Rev Time 0.00
Received By gjohnson Date 2018-10-24 Time 15:07 Sent To  
Notes
2018-10-25 15:07:52B10

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-08-29 Cont ID  
Sent By jgomez Date 2018-08-29 Time 16:20 Rev Time 0.00
Received By jgomez Date 2018-07-12 Time 13:13 Sent To I
Notes
2018-07-16 13:14:00B33

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2018-11-21 Cont ID  
Sent By ccole Date 2018-11-21 Time 12:42 Rev Time 0.00
Received By ccole Date 2018-11-21 Time 12:32 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2018-07-30 Cont ID  
Sent By ccole Date 2018-07-30 Time 16:47 Rev Time 0.00
Received By ccole Date 2018-07-30 Time 15:07 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-12-10 Cont ID  
Sent By gjohnson Date 2018-12-10 Time 17:31 Rev Time 0.00
Received By gjohnson Date 2018-12-10 Time 17:31 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2018-08-24 Cont ID  
Sent By gjohnson Date 2018-08-24 Time 14:02 Rev Time 0.00
Received By gjohnson Date 2018-08-24 Time 13:00 Sent To  
Notes
***NONE***

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 4 Status P Date 2019-09-05 Cont ID  
Sent By skennedy Date 2019-09-05 Time 18:06 Rev Time 0.00
Received By skennedy Date 2019-09-05 Time 18:06 Sent To  
Notes
***NONE***

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 3 Status F Date 2019-07-19 Cont ID  
Sent By skennedy Date 2019-07-19 Time 15:22 Rev Time 0.00
Received By skennedy Date 2019-07-19 Time 15:22 Sent To  
Notes
2019-07-19 15:26:35ADDITIONAL 2ND REVIEW PERFORMED AS A RESULT OF THE
 BUILDING CONTRACTOR HAVING SUPPLIED A PERMIT
 APPLICATION CHANGING THE PROJECT FROM TBD STATUS:
 FBC 2017 6TH EDITION
 FBC 2017 EXISTING BUILDING
  
 REGARDING THE REQUIREMENT FOR A STRUCTURAL (BUILDING)
 SUB PERMIT TO BE ISSUED TO A FLORIDA LICENSED GENERAL
 CONTRACTOR; MR. SIMON IS A FLORIDA LICENSED BUILDING
 CONTRACTOR. THE SCOPE OF HIS LICENSE PURSUANT TO FS
 489.105(B) LIMITS HIM FROM BEING THE CONTRACTOR OF
 RECORD PERFORMING THE WORK RELATED TO THE SHEAR WALL
 MODIFICATION. HE MUST SUBCONTRACT THIS SCOPE OF WORK TO
 A GENERAL CONTRACTOR. THE BUILDING SUB PERMIT
 REQUIREMENT WILL DOCUMENT THAT THIS PORTION OF THE
 OVERALL SCOPE WILL BE PERFORMED BY A QUALIFIED
 CONTRACTOR. I HAVE ADVISED MR. SIMON OF THIS
 REQUIREMENT AND I UNDERSTAND HE IS MOVING FORWARD ON
 SUPPLYING THE REQUIRED ADDITIONAL SUB PERMIT
 APPLICATION FOR THE RECORD WHICH IS REQUIRED PRIOR TO
 PERMIT ISSUANCE.
  
 RELATIVE TO THE LETTER PREVIOUSLY SUBMITTED BY MR.
 ANDERSON, IT HAS BEEN CLARIFIED THAT THE WORK IS
 PROPOSED IN A PORTION OF THE 20 STORY BUILDING THAT IS
 AN EXISTING 8 LEVEL REINFORCED CONCRETE STRUCTURE AND
 THAT SHAWN ANDERSON, PE 53515 WHO PROVIDED THE LETTER
 IS NOT THE ENGINEER OF RECORD AND WILL NOT ACT AS
 STRUCTURAL DESIGNER OF RECORD OR SPECIAL INSPECTOR.
 ACCORDINGLY, THE EVENTUAL ENGINEER OF RECORD MUST
 SUPPLY A STRUCTURAL PLAN TO DETAIL THE WORK FOR THE
 SHEAR WALL MODIFICATION AND PROVIDE A THRESHOLD
 INSPECTION PLAN PURSUANT TO THE REQUIREMENTS OF FBC
 107.3.5.1.1(8) AND FS 553.79(5)(A). STRUCTURAL DETAILS,
 FOR THE SHEAR WALL SCOPE OF WORK AND A THRESHOLD
 INSPECTION PLAN IS REQUIRED PRIOR TO PERMIT ISSUANCE.
  
  
 STEVEN KENNEDY, CBO
 ASSISTANT BUILDING OFFICIAL
 (561) 805-6710
 [email protected]
  

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 2 Status F Date 2018-12-10 Cont ID  
Sent By jgomez Date 2018-12-10 Time 15:17 Rev Time 0.00
Received By jgomez Date 2018-12-10 Time 15:17 Sent To  
Notes
2018-12-10 15:17:471- THIS IS A THRESHOLD BUILDING AND THE SCOPE OF WORK
 INCLUDES ALTERATION OF THE STRUCTURAL DESIGN OF THE
 BUILDING. SPECIAL INSPECTOR WILL BE REQUIRED FOR
 INSPECTIONS AT THE SHEARWALL. SEC. 110.8 CITY
 AMENDMENTS.
 NOTE: PLEASE CONTACT KEN CONRAD (561-805-6666) OR
 RICHARD GATHRIGHT (561-805-6679) PRIOR TO START OF
 WORK.
  

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status F Date 2018-08-29 Cont ID  
Sent By jgomez Date 2018-08-29 Time 15:37 Rev Time 0.00
Received By jgomez Date 2018-08-29 Time 15:37 Sent To  
Notes
2018-08-29 15:39:25THRESHOLD BUILDING:
  
 1- THIS IS A THRESHOLD BUILDING AND THE SCOPE OF WORK
 INCLUDES ALTERATION OF THE STRUCTURAL DESIGN OF THE
 BUILDING. SPECIAL INSPECTOR WILL BE REQUIRED FOR
 INSPECTIONS AT THE SHEARWALL. SEC. 110.8 CITY
 AMENDMENTS.
 NOTE: PLEASE CONTACT THIS OFFICE WHEN CONTRACTOR IS
 SELECTED FOR SPECIAL INSPECTOR PROCEDURE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved