Plan Review Details - Permit 18070409
Plan Review Stops For Permit 18070409
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-07-18 Cont ID  
Sent By rmcdouga Date 2018-07-18 Time 19:07 Rev Time 0.00
Received By rmcdouga Date 2018-07-18 Time 18:51 Sent To  
Notes
2018-07-18 19:07:37FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-07-19 Cont ID  
Sent By jleahy Date 2018-07-19 Time 17:33 Rev Time 0.00
Received By jleahy Date 2018-07-19 Time 17:33 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-07-23 Cont ID  
Sent By tklarge Date 2018-07-23 Time 08:50 Rev Time 0.00
Received By tklarge Date 2018-07-23 Time 08:50 Sent To  
Notes
2018-07-23 08:51:35A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT IS REQUIRED FOR A
 CONTRACTOR TO PERFORM THE RELATED WORK. PROVIDE
 COMPLETE PLANS THAT REFLECT THE ENTIRE SCOPE OF GAS
 WORK TO BE DONE. WPB AMEND. TO FBC SEC.107.2.1.
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-08-06 Cont ID  
Sent By tklarge Date 2018-08-06 Time 11:41 Rev Time 0.00
Received By tklarge Date 2018-08-06 Time 11:09 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-08-01 Cont ID  
Sent By tklarge Date 2018-08-01 Time 06:07 Rev Time 0.00
Received By tklarge Date 2018-07-30 Time 14:02 Sent To  
Notes
2018-07-31 14:03:05RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-07-23 Cont ID  
Sent By tklarge Date 2018-07-23 Time 08:51 Rev Time 0.00
Received By tklarge Date 2018-07-10 Time 10:43 Sent To  
Notes
2018-07-12 10:43:10ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 3 Status P Date 2018-08-06 Cont ID  
Sent By tklarge Date 2018-08-06 Time 11:41 Rev Time 0.00
Received By tklarge Date 2018-08-06 Time 11:09 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-08-01 Cont ID  
Sent By tklarge Date 2018-08-01 Time 06:06 Rev Time 0.00
Received By tklarge Date 2018-08-01 Time 05:22 Sent To I
Notes
2018-08-01 06:06:431) THE POOL PLANS SHOW TDH CALCULATIONS BASED ON THE
 SIMPLIFIED TDH CALCULATION METHOD. THIS METHOD IS
 ALLOWED IN THE 2006 VERSION OF APSP 7 BUT IS NO LONGER
 ALLOWED IN THE 2013 EDITION OF APSP 7 WHICH HAS BEEN
 ADOPTED BY THE 2017.
 FBC. TOTAL DYNAMIC HEAD CALCULATIONS SHALL BE DONE IN
 ACCORDANCE WITH 2013 APSP 7 SEC.4.4.9.1.
 2) THE GAS POOL HEATER SHALL HAVE A MINIMUM THERMAL
 EFFICIENCY OF 82% PER THE 2017 FBC-ENERGY
 SEC.R403.10.4.
 3) TWO PUMP CURVES HAVE BEEN PROVIDED BUT THERE IS NO
 INDICATION ON EITHER CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE TDH CALCULATIONS. THERE ARE DIFFERENT RPM'S ON
 THE CURVES. CLARRIFY WHICH ONE.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-07-23 Cont ID  
Sent By tklarge Date 2018-07-23 Time 08:50 Rev Time 0.00
Received By tklarge Date 2018-07-23 Time 08:15 Sent To I
Notes
2018-07-23 08:50:201) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW FOR THE POOL, THE SPA AND THE POOL
 FEATURE. THE MAXIMUM FLOW OF THE PUMP FROM ITS PUMP
 CURVE IS NO LONGER ALLOWED TO BE USED IN DETERMINING
 MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC 7 - 2013
 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION ADDRESSES FLOW
 RATE IN GALLONS PER MINUTE (GPM). IT REQUIRES THAT
 MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED THE LISTED
 MAXIMUM FLOW RATE OF THE SUCTION OUTLET FITTING
 ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS MUST
 INCLUDE ALL OF THE SYSTEM COMPONENTS IN THE PIPING
 SYSTEM INCLUDING THE FILTER.
 2) SUBMIT TWO COPIES OF THE POOL PUMP CURVE FOR THE
 POOL, THE SPA AND POOL FEATURE. IDENTIFY ON THE PUMP
 CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP BEING
 INSTALLED ON THESE ITEMS. THIS IS NEEDED TO CONFIRM THE
 MAXIMUM SYSTEM FLOW FROM THE TDH CALCULATIONS.
 3) INDICATE ON THE POOL PUMP SPECS WHICH PUMP IS BEING
 INSTALLED. WPB AMEND. TO FBC SEC. 107.2.1.
 4) BACKFLOW PREVENTERS MAY BE REQUIRED ON THE
 WATER/FIRE BOWL UNITS.
 5) THE GAS HEATER SHALL HAVE A MINIMUM OF 82%
 EFFICIENCY PER THE 2017 FBC-ENERGY TABLE C404.2. SUBMIT
 VERIFICATION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-07-17 Cont ID  
Sent By mcruz Date 2018-07-17 Time 15:26 Rev Time 0.00
Received By mcruz Date 2018-07-17 Time 15:20 Sent To  
Notes
***NONE***