| 2018-07-13 15:33:56 | BUILDING PLAN REVIEW |
| | 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | |
| | CHRISTOPHER S. THROOP, C.B.O. |
| | PLANS EXAMINER, PX3169 |
| | CONSTRUCTION SERVICES DIVISION |
| | TEL: 561-805-6726 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |
| | 1ST REVIEW |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | 1. CANNOT READ PLANS. |
| | FBC 107.2.1.4 QUALITY OF BUILDING PLANS. BUILDING PLANS |
| | SHALL BE DRAWN TO A MINIMUM 1/8 INCH SCALE UPON |
| | SUBSTANTIAL PAPER, CLOTH OR OTHER ACCEPTABLE MEDIUM. |
| | THIS POLICY MAY INCLUDE SUCH THINGS AS MINIMUM SIZE, |
| | SHAPE, CONTRAST, CLARITY, OR OTHER ITEMS RELATED TO |
| | RECORDS MANAGEMENT. |
| | |
| | 2. DESIGNER TO PRINT NAME AND SIGN PLAN. |
| | FBC 107.2.1 ALL INFORMATION, DRAWINGS, SPECIFICATIONS |
| | AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE |
| | OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO |
| | SECTION 107.3.5) AND F.S. 481.229. |
| | |
| | 3. CANNOT VERIFY VALUE. |
| | THE PERMIT VALUATION AND PERMIT FEE MUST BE |
| | COMMENSURATE WITH THE VALUATION AND FEE THAT A LICENSED |
| | CONTRACTOR WOULD PROVIDE. |
| | YOU MAY PROVIDE A COPY OF THE CONTRACT SIGNED BY THE |
| | OWNER OR A LIST OF LABOR, MATERIALS AND EQUIPMENT |
| | RENTAL TO VERIFY VALUE. |
| | |
| | CITY OF WPB CHPT. 1 ? VALUE |
| | 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF |
| | THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF |
| | BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED, |
| | QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS |
| | (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE |
| | BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION |
| | OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT |
| | VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, |
| | MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, |
| | ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| | DATA OF NATIONAL CONSTRUCTION |
| | COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), |
| | AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. |
| | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |