| 2018-07-11 17:58:50 | 07/11/2018 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. YOUR PLAN THAT WAS SUBMITTED AND YOUR APPLICATION DO |
| | NOT COINCIDE, APPLICATION SAYS YOU ARE REPLACING |
| | PLUMING LINE AND YOU ARE ADDING HOT AND COLD WATER LINE |
| | BUT ON YOUR PLANS YOU SHOW A NEW BATHROOM PLEASE, |
| | CLARIFY IF YOU ARE ADDING A BATHROOM AND GIVE |
| | DIMENSION. |
| | 2. A SEPARATE PERMIT AND REQUIRED INSPECTION FOR |
| | BUILDING, ELECTRICAL AND OR MECHANICAL, (FRAMING, TILE, |
| | ETC.) INSPECTION, FBC WPB AMENDMENTS SEC.110.3 REQUIRED |
| | INSPECTIONS. |
| | 3. THE CLAIMED VALUE APPEARS TO BE OVERESTIMATED ON THE |
| | APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED |
| | CONTRACT. WPB AMENDMENTS TO THE FBC SEC. 109.3 BUILDING |
| | PERMIT VALUATIONS. |
| | 4. THE EXAMINATION OF THE DOCUMENTS BY THE BUILDING |
| | OFFICIAL SHALL INCLUDE THE FOLLOWING MINIMUM CRITERIA |
| | AND DOCUMENTS: A FLOOR PLAN; SITE PLAN; FOUNDATION |
| | PLAN; FLOOR/ROOF FRAMING PLAN OR TRUSS LAYOUT; ALL |
| | FENESTRATION PENETRATIONS; FLASHING; AND ROUGH OPENING |
| | DIMENSIONS; AND ALL EXTERIOR ELEVATIONS: FBC WPB |
| | AMENDMENTS SEC. 107.3.5 MINIMUM PLAN REVIEW CRITERIA |
| | FOR BUILDINGS. |
| | 5. PIPING LOCATED OUTSIDE THE CONDITIONED SPACE #3, |
| | 2017 FBC R403.5.3 HOT WATER PIPE INSULATION |
| | 6. THE SHOWER PAN IS NOT RECEDED IT WILL REQUIRE LINING |
| | 2017 FBC R 2709.2 LINING REQUIRED. |
| | |
| | THE ADJOINING WALLS AND FLOOR FRAMING ENCLOSING ON-SITE |
| | BUILT-UP SHOWER RECEPTORS SHALL BE LINED WITH ONE OF |
| | THE FOLLOWING MATERIALS: |
| | PLASTIC LINER MATERIAL THAT COMPLIES WITH ASTM D4068 OR |
| | ASTM D4551. |
| | |
| | THE LINING MATERIAL SHALL EXTEND NOT LESS THAN 2 INCHES |
| | (51 MM) BEYOND OR AROUND THE ROUGH JAMBS AND NOT LESS |
| | THAN 2 INCHES (51 MM) ABOVE FINISHED THRESHOLDS. |
| | SHEET-APPLIED LOAD BEARING, BONDED WATERPROOF MEMBRANES |
| | SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER?S |
| | INSTRUCTIONS. |
| | |
| | NOTE: SHOWER PAN MUST HAVE A SLOPED MORTAR BED THAT IS |
| | PRE-PITCHED BENEATH PRIOR TO LINER INSTALLATION OF 1/4" |
| | IN PER FOOT TOWARD THE DRAIN, MUST HAVE DAM CORNER, |
| | BACKING |
| | AROUND THE PERIMETER AND BEFORE FINAL MORTAR |
| | APPLICATION PLACE SOME PEA GRAVEL OVER WEEP HOLES SO |
| | THE MORTAR DOES NOT COVER THEM PER MANUFACTURES |
| | SPECIFICATIONS. |
| | |
| | 7. SHOWER VALVES MUST COMPLY WITH 2017 FBC R2708.4 |
| | SHOWER CONTROL VALVES.. PLEASE PROVIDE A SPECIFICATION |
| | FOR SHOWER VALVE TYPE THAT COMPLIES. WPB AMENDMENTS TO |
| | THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | 8. SHOWER COMPARTMENTS SHALL HAVE NOT LESS THAN 900 |
| | SQUARE INCHES, 2017 FBC R2708.1 GENERAL. |
| | |
| | SUBMITTAL OF ADDITIONAL AND/OR REVISED MATERIALS MAY |
| | RESULT IN NEW PLAN REVIEW COMMENTS. WHEN RESUBMITTING, |
| | IT IS HELPFUL TO PROVIDE A RESPONSE LETTER ADDRESSING |
| | EACH ITEM ALONG WITH THE CITY RESUBMITTAL FORM. |
| | ADDITIONALLY, INSERT CORRECTED PAGES INTO THE ORIGINAL |
| | SUBMITTAL AND REMOVE OR VOID THE PREVIOUSLY REVIEWED |
| | SHEETS. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |
| | |