Plan Review Details - Permit 18070219
Plan Review Stops For Permit 18070219
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-07-27 Cont ID  
Sent By lcrespo Date 2018-07-27 Time 07:16 Rev Time 0.00
Received By lcrespo Date 2018-07-19 Time 11:06 Sent To  
Notes
2018-07-19 11:06:25RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-07-11 Cont ID  
Sent By lcrespo Date 2018-07-11 Time 17:57 Rev Time 0.00
Received By lcrespo Date 2018-07-05 Time 15:47 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-07-27 Cont ID  
Sent By lcrespo Date 2018-07-27 Time 07:15 Rev Time 0.00
Received By lcrespo Date 2018-07-27 Time 07:15 Sent To  
Notes
2018-07-27 07:17:4207/27/18 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-07-11 Cont ID  
Sent By lcrespo Date 2018-07-11 Time 17:57 Rev Time 0.00
Received By lcrespo Date 2018-07-11 Time 17:56 Sent To  
Notes
2018-07-11 17:58:5007/11/2018 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. YOUR PLAN THAT WAS SUBMITTED AND YOUR APPLICATION DO
 NOT COINCIDE, APPLICATION SAYS YOU ARE REPLACING
 PLUMING LINE AND YOU ARE ADDING HOT AND COLD WATER LINE
 BUT ON YOUR PLANS YOU SHOW A NEW BATHROOM PLEASE,
 CLARIFY IF YOU ARE ADDING A BATHROOM AND GIVE
 DIMENSION.
 2. A SEPARATE PERMIT AND REQUIRED INSPECTION FOR
 BUILDING, ELECTRICAL AND OR MECHANICAL, (FRAMING, TILE,
 ETC.) INSPECTION, FBC WPB AMENDMENTS SEC.110.3 REQUIRED
 INSPECTIONS.
 3. THE CLAIMED VALUE APPEARS TO BE OVERESTIMATED ON THE
 APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED
 CONTRACT. WPB AMENDMENTS TO THE FBC SEC. 109.3 BUILDING
 PERMIT VALUATIONS.
 4. THE EXAMINATION OF THE DOCUMENTS BY THE BUILDING
 OFFICIAL SHALL INCLUDE THE FOLLOWING MINIMUM CRITERIA
 AND DOCUMENTS: A FLOOR PLAN; SITE PLAN; FOUNDATION
 PLAN; FLOOR/ROOF FRAMING PLAN OR TRUSS LAYOUT; ALL
 FENESTRATION PENETRATIONS; FLASHING; AND ROUGH OPENING
 DIMENSIONS; AND ALL EXTERIOR ELEVATIONS: FBC WPB
 AMENDMENTS SEC. 107.3.5 MINIMUM PLAN REVIEW CRITERIA
 FOR BUILDINGS.
 5. PIPING LOCATED OUTSIDE THE CONDITIONED SPACE #3,
 2017 FBC R403.5.3 HOT WATER PIPE INSULATION
 6. THE SHOWER PAN IS NOT RECEDED IT WILL REQUIRE LINING
 2017 FBC R 2709.2 LINING REQUIRED.
  
 THE ADJOINING WALLS AND FLOOR FRAMING ENCLOSING ON-SITE
 BUILT-UP SHOWER RECEPTORS SHALL BE LINED WITH ONE OF
 THE FOLLOWING MATERIALS:
 PLASTIC LINER MATERIAL THAT COMPLIES WITH ASTM D4068 OR
 ASTM D4551.
  
 THE LINING MATERIAL SHALL EXTEND NOT LESS THAN 2 INCHES
 (51 MM) BEYOND OR AROUND THE ROUGH JAMBS AND NOT LESS
 THAN 2 INCHES (51 MM) ABOVE FINISHED THRESHOLDS.
 SHEET-APPLIED LOAD BEARING, BONDED WATERPROOF MEMBRANES
 SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER?S
 INSTRUCTIONS.
  
 NOTE: SHOWER PAN MUST HAVE A SLOPED MORTAR BED THAT IS
 PRE-PITCHED BENEATH PRIOR TO LINER INSTALLATION OF 1/4"
 IN PER FOOT TOWARD THE DRAIN, MUST HAVE DAM CORNER,
 BACKING
 AROUND THE PERIMETER AND BEFORE FINAL MORTAR
 APPLICATION PLACE SOME PEA GRAVEL OVER WEEP HOLES SO
 THE MORTAR DOES NOT COVER THEM PER MANUFACTURES
 SPECIFICATIONS.
  
 7. SHOWER VALVES MUST COMPLY WITH 2017 FBC R2708.4
 SHOWER CONTROL VALVES.. PLEASE PROVIDE A SPECIFICATION
 FOR SHOWER VALVE TYPE THAT COMPLIES. WPB AMENDMENTS TO
 THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS.
 8. SHOWER COMPARTMENTS SHALL HAVE NOT LESS THAN 900
 SQUARE INCHES, 2017 FBC R2708.1 GENERAL.
  
 SUBMITTAL OF ADDITIONAL AND/OR REVISED MATERIALS MAY
 RESULT IN NEW PLAN REVIEW COMMENTS. WHEN RESUBMITTING,
 IT IS HELPFUL TO PROVIDE A RESPONSE LETTER ADDRESSING
 EACH ITEM ALONG WITH THE CITY RESUBMITTAL FORM.
 ADDITIONALLY, INSERT CORRECTED PAGES INTO THE ORIGINAL
 SUBMITTAL AND REMOVE OR VOID THE PREVIOUSLY REVIEWED
 SHEETS.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved