Plan Review Details - Permit 18070204
Plan Review Stops For Permit 18070204
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-08-14 Cont ID  
Sent By rmcdouga Date 2018-08-14 Time 17:05 Rev Time 0.00
Received By rmcdouga Date 2018-08-14 Time 17:04 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-07-16 Cont ID  
Sent By rmcdouga Date 2018-07-16 Time 17:17 Rev Time 0.00
Received By rmcdouga Date 2018-07-16 Time 16:38 Sent To  
Notes
2018-07-16 17:16:34PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) VALUATION OF $13,000.00 IS TOO LOW FOR THIS POOL.
 SUBMIT A COPY OF THE SIGNED CONTRACT. FBC 109.3
 BUILDING PERMIT VALUATION. FOR PERMITTING PURPOSES,
 VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL
 REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC,
 PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE
 WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2) THE WATER DEPTH IN THIS PRIVATE POOL EXCEEDS 5 FEET.
 SHOW COMPLIANCE WITH FBC-R4501.18 LADDERS AND STEPS.
 ALL POOLS WHETHER PUBLIC OR PRIVATE SHALL BE PROVIDED
 WITH A LADDER OR STEPS IN THE SHALLOW END WHERE WATER
 DEPTH EXCEEDS 24 INCHES (610 MM). IN PRIVATE POOLS
 WHERE WATER DEPTH EXCEEDS 5 FEET (1524 MM), THERE SHALL
 BE LADDERS, STAIRS OR UNDERWATER BENCHES/SWIMOUTS IN
 THE DEEP END. WHERE MANUFACTURED DIVING EQUIPMENT IS TO
 BE USED, BENCHES OR SWIMOUTS SHALL BE RECESSED OR
 LOCATED IN A CORNER.
  
 3) NOTE: THE POOL PERMIT CAN NOT BE ISSUED WITHOUT A
 POOL ELECTRICAL SUB-PERMIT. SUBMIT AN APPLICATION FOR A
 POOL ELECTRICAL SUB-PERMIT.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-08-11 Cont ID  
Sent By jleahy Date 2018-08-11 Time 12:32 Rev Time 0.00
Received By jleahy Date 2018-08-11 Time 12:32 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-07-12 Cont ID  
Sent By jleahy Date 2018-07-12 Time 17:03 Rev Time 0.00
Received By jleahy Date 2018-07-12 Time 17:03 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-07-23 Cont ID  
Sent By tklarge Date 2018-07-23 Time 15:07 Rev Time 0.00
Received By tklarge Date 2018-07-23 Time 15:07 Sent To  
Notes
2018-07-23 15:08:18THERE IS NO HEATER ON THIS POOL.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-08-14 Cont ID  
Sent By rmcdouga Date 2018-08-14 Time 17:05 Rev Time 0.00
Received By rmcdouga Date 2018-08-02 Time 11:14 Sent To  
Notes
2018-08-03 11:14:22ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-07-23 Cont ID  
Sent By tklarge Date 2018-07-23 Time 15:08 Rev Time 0.00
Received By tklarge Date 2018-07-05 Time 14:27 Sent To  
Notes
2018-07-06 14:27:44ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-08-09 Cont ID  
Sent By tklarge Date 2018-08-09 Time 14:20 Rev Time 0.00
Received By tklarge Date 2018-08-09 Time 14:10 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-07-23 Cont ID  
Sent By tklarge Date 2018-07-23 Time 15:07 Rev Time 0.00
Received By tklarge Date 2018-07-23 Time 13:12 Sent To I
Notes
2018-07-23 15:07:081) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION
 ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT
 REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED
 THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET
 FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS
 MUST INCLUDE ALL OF THE SYSTEM COMPONENTS IN THE PIPING
 SYSTEM INCLUDING THE FILTER.
  
 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS.
  
 3) INDICATE ON THE POOL PUMP SPECS WHICH PUMP IS BEING
 INSTALLED. WPB AMEND. TO FBC SEC. 107.2.1.
  
 4) SUBMIT A SECOND COPY OF THE MANUFACTURER'S SPEC FOR
 THE FILTER.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 2 Status P Date 2018-08-08 Cont ID  
Sent By mcruz Date 2018-08-08 Time 15:07 Rev Time 0.00
Received By mcruz Date 2018-08-08 Time 15:04 Sent To P
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2018-07-11 Cont ID  
Sent By mcruz Date 2018-07-11 Time 14:53 Rev Time 0.00
Received By mcruz Date 2018-07-11 Time 14:46 Sent To  
Notes
***NONE***