| Plan Review Stops For Permit 18070150 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2019-01-24 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-01-24 |
Time |
15:48 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-01-24 |
Time |
15:48 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2018-07-30 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2018-07-30 |
Time |
16:01 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2018-07-30 |
Time |
16:01 |
Sent To |
|
|
| Notes |
| 2018-07-30 16:00:56 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | 1. PLAN REVIEW STAFF WAS ADVISED THAT THIS WAS A | | | MULTI-MILLION DOLLAR JOB. VALUE FOR WORK STATED ON | | | PERMIT APPLICATION APPEARS LOW. PROVIDE COPY OF SIGNED | | | CONTRACT WITH SCOPE AND VALUE OF WORK, TO INCLUDE ALL | | | MATERIALS AND LABOR. DETAIL HOW THIS COST WILL BE SPLIT | | | BETWEEN THE RESPECTIVE PERMITS. FBC 109.3 | | | 2. THE NEC AND FBC SPECIFIED FOR DESIGN ON SHEET G1.02 | | | IS NOT THE CURRENT CODE. PROVIDE CORRECTION. FBC | | | PREFACE (ALSO SEE CURRENT CODES ABOVE) | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY | | | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED | | | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED ?OLD | | | SHEETS?. | | | | | | SINCERELY, | | | | | | JOHN PEARSON | | | ELECTRICAL PLANS EXAMINER | | | 561-805-6746 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2019-01-22 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-01-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-01-22 |
Time |
15:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2018-08-07 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2018-08-07 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2018-07-06 |
Time |
14:23 |
Sent To |
I |
|
| Notes |
| 2018-08-07 12:50:58 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | | 1) SHEET G 1 02 - THERE IS A NOTE BOX INDICATING THE | | | WORK IS ON THE 4TH FL COMMAND CENTER. | | | | | | FOR CLARIFICATION PURPOSES PLEASE INDICATE WHY THE ONLY | | | THE COMMAND CENTER IS INCLUDED. | | | | | | | | | | | | 2) SHEET G 1 02 - THERE IS AN INDICATION IN A NOTE BOX | | | THAT THE WORK ON THE 4TH FL COMMAND CENTER SHALL COMPLY | | | WITH THE 5TH ED OF THE FFPC. | | | | | | THE CURRENT ED OF THE FFPC IS THE 6TH. | | | | | | PLEASE REVIEW AND CORECT OR JUSTIFY WHY THE 5TH ED IS | | | INDICATED AND ALOS WHY THE NOT THE ENTIRE PROJECT. | | | | | | | | | | | | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | | | | | | | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2019-01-28 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2019-01-08 |
Time |
16:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-08-07 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2018-08-07 |
Time |
13:33 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2018-07-05 |
Time |
16:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2019-01-28 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2019-01-28 |
Time |
13:27 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2019-01-28 |
Time |
13:27 |
Sent To |
|
|
| Notes |
| 2019-01-28 13:28:07 | MECHANICAL PROVISOS: | | | | | | A) FL. LICENSED FIRE ALARM CONTRACTOR REQUIRED TO PULL | | | PERMIT. | | | | | | B) SECTION 606 FBC-17 MECHANICAL, SMOKE DETECTION | | | SYSTEMS CONTROL. | | | | | | 1) DUCT SMOKE DETECTORS SHALL COMPLY WITH UL 268A. | | | | | | 2) DUCT SMOKE DETECTORS SHALL BE INSTALLED: | | | | | | A) ON THE SUPPLY SIDE OF AIR HANDLING SYSTEMS THAT HAVE | | | A CAPACITY GREATER THAN 2000 CFMS. | | | | | | B) ON THE SUPPLY SIDES OF MULTIPLE AIR-HANDLING SYSTEMS | | | SHARING COMMON SUPPLY WITH A COMBINED DESIGN CAPACITY | | | GREATER THAN 2000 CFMS. | | | | | | C) ON RETURN AIR RISERS SERVING TWO OR MORE STORIES | | | THAT HAVE A DESIGN CAPACITY GREATER THAN 15,000 CFMS, | | | AT EACH STORY. | | | | | | D) DEVICES SHALL BE TESTED IN ACCORDANCE WITH UL | | | LISTING AND MANUFACTURER'S SPECIFICATIONS. | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2018-07-26 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-07-26 |
Time |
09:30 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-07-26 |
Time |
09:30 |
Sent To |
|
|
| Notes |
| 2018-07-26 10:02:53 | MECHANICAL PROVISOS: | | | | | | A) FL. LICENSED FIRE ALARM CONTRACTOR REQUIRED TO PULL | | | PERMIT. | | | | | | B) SECTION 606 FBC-17 MECHANICAL, SMOKE DETECTION | | | SYSTEMS CONTROL. | | | | | | 1) DUCT SMOKE DETECTORS SHALL COMPLY WITH UL 268A. | | | | | | 2) DUCT SMOKE DETECTORS SHALL BE INSTALLED: | | | | | | A) ON THE SUPPLY SIDE OF AIR HANDLING SYSTEMS THAT HAVE | | | A CAPACITY GREATER THAN 2000 CFMS. | | | | | | B) ON THE SUPPLY SIDES OF MULTIPLE AIR-HANDLING SYSTEMS | | | SHARING COMMON SUPPLY WITH A COMBINED DESIGN CAPACITY | | | GREATER THAN 2000 CFMS. | | | | | | C) ON RETURN AIR RISERS SERVING TWO OR MORE STORIES | | | THAT HAVE A DESIGN CAPACITY GREATER THAN 15,000 CFMS, | | | AT EACH STORY. | | | | | | D) DEVICES SHALL BE TESTED IN ACCORDANCE WITH UL | | | LISTING AND MANUFACTURER'S SPECIFICATIONS. | | | | | | CCOLE- 7/25/2018 | | | | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2019-01-24 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-01-24 |
Time |
15:43 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-01-24 |
Time |
15:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2018-07-30 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2018-07-30 |
Time |
16:01 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2018-07-30 |
Time |
16:01 |
Sent To |
|
|
| Notes |
| 2018-07-30 16:01:38 | ALL SIGNATURES WITH THIS SUBMISSION HAVE BEEN | | | CONFIRMED, ANY NEW SHEETS SUBMITTTED WILL NEED TO BE | | | CHECKED. |
|
|