| 2018-07-09 15:35:22 | 07/09/2018 1ST GAS REVIEW**DENIED** |
| | |
| | 1) SHOW TOTAL BTU LOAD ON SYSTEM. FBC 107.2.1 |
| | |
| | 2) SHOW PIPING MATERIAL AND SIZING OF THE OUTLET SIDE |
| | OF THE GAS METER.SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS THE LENGTH OF ALL CUT SECTIONS OF PIPE |
| | PER 2017 FBC-FUEL GAS, SECS. 402.4.1, 402.4.2. OR 2017 |
| | FBC-RES SEC. G2413.4.1, G2413.4.2. |
| | SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING.(IF APPLICABLE) FOR |
| | EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | |
| | 3) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017 |
| | FBC-FUEL GAS CODE SEC.304.1, 614.6 (CLOTHES DRYERS) OR |
| | 2017 FBC-RES. SEC. G 2407.1 AND G2439.4 (CLOTHES |
| | DRYERS). |
| | |
| | 4) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017 |
| | FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES. |
| | SEC. G 2413.4.1, G2413.4.2 |
| | |
| | 5) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1 |
| | |
| | 6) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| | LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| | AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| | RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| | HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| | DRAWN. WPB AMEND. TO FBC SEC. 107.2.1 |
| | |
| | 7) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. |
| | A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY |
| | AHEAD OF EACH MP REGULATOR. 2017 FBC-FUEL GAS |
| | SEC.409.4, FBC-RESIDENTIAL SEC. G 2420.4. |
| | |
| | 8) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2014 FGC SEC.410.1, 2017 FBC-RES. SEC. |
| | G2421.1. |
| | |
| | 9) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1 |
| | OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE |
| | PROPER PIPE SIZE AND BTU LOAD. |
| | |
| | 10) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED |
| | GAS APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| | BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| | SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| | ADDITION TO THE REQUIRED VENTILATION AIR. 2017 FBC-FUEL |
| | GAS SEC.304.9.3 OR FBCR G2407.9.3. |
| | |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |