Plan Review Details - Permit 18061105
Plan Review Stops For Permit 18061105
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-07-17 Cont ID  
Sent By rmcdouga Date 2018-07-17 Time 18:19 Rev Time 0.00
Received By rmcdouga Date 2018-07-17 Time 18:01 Sent To I
Notes
2018-07-17 18:20:34FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-07-05 Cont ID  
Sent By rmcdouga Date 2018-07-05 Time 15:12 Rev Time 0.00
Received By rmcdouga Date 2018-07-05 Time 15:12 Sent To I
Notes
2018-07-05 15:31:12PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) PROVIDE A DETAIL FOR THE "DEEP END EXIT" THAT SHOWS
 COMPLIANCE WITH FBC-R 4501.18 AND ANSI/APSP/ICC-5
 SECTION 6.7

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-06-28 Cont ID  
Sent By jleahy Date 2018-06-28 Time 15:50 Rev Time 0.00
Received By jleahy Date 2018-06-28 Time 15:50 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-06-30 Cont ID  
Sent By thunt Date 2018-06-30 Time 11:49 Rev Time 0.00
Received By thunt Date 2018-06-30 Time 11:49 Sent To  
Notes
2018-06-30 11:50:23A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE
 REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK.
 PROVIDE COMPLETE PLANS AND GAS RISER THAT REFLECTS THE
 ENTIRE SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC
 SEC. 107.2.1.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-07-17 Cont ID  
Sent By rmcdouga Date 2018-07-17 Time 18:19 Rev Time 0.00
Received By rmcdouga Date 2018-07-09 Time 15:41 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-07-05 Cont ID  
Sent By rmcdouga Date 2018-07-05 Time 15:20 Rev Time 0.00
Received By rmcdouga Date 2018-06-22 Time 12:54 Sent To  
Notes
2018-06-25 12:54:24ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-07-17 Cont ID  
Sent By rmcdouga Date 2018-07-17 Time 18:19 Rev Time 0.00
Received By thunt Date 2018-07-17 Time 11:53 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-06-30 Cont ID  
Sent By thunt Date 2018-06-30 Time 11:50 Rev Time 0.00
Received By thunt Date 2018-06-30 Time 11:50 Sent To B
Notes
2018-06-30 11:53:3406/30/2018 PLUMBING 1ST REVIEW**DENIED**
  
 1) MUST SHOW (TDH) TOTAL DYNAMIC HEAD ON HOW THE
 COMPLETE PIPING SYSTEM WAS SIZED. ANSI/ APSP 7, 15
  
 2) PROVIDE MANUFACTURE MAIN DRAIN SPEC'S SHOWING FLOW
 RATE AND THAT IT COMPLIES WITH VGB.
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2018-06-27 Cont ID  
Sent By mcruz Date 2018-06-27 Time 14:15 Rev Time 0.00
Received By mcruz Date 2018-06-27 Time 14:09 Sent To  
Notes
2018-06-27 14:15:12ZONING PASSED WITH PROVISO: POOL EQUIMENT SHALL BE AT
 LEAST 5.6' FROM REAR PROPERTY LINE.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved