Plan Review Details - Permit 18061063
Plan Review Stops For Permit 18061063
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-07-17 Cont ID  
Sent By thunt Date 2018-07-17 Time 13:39 Rev Time 0.00
Received By thunt Date 2018-07-17 Time 13:39 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-06-30 Cont ID  
Sent By thunt Date 2018-06-30 Time 10:07 Rev Time 0.00
Received By thunt Date 2018-06-30 Time 10:07 Sent To  
Notes
2018-06-30 10:17:1606/30/2018 2ND GAS REVIEW FOR THIS GENERATOR**DENIED**
 PLEASE SEE PERMIT # 18060136 FOR A LIST OF COMMENTS
 UNDER THAT DENIED PERMIT.
  
 A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS TIME
 AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED
 UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS
  
 1) VALUE: YOUR VALUE SEEMS TOO LOW. IT IS MUCH LOWER
 THEN THE LAST PERMIT APPLICATION FOR THIS SAME SCOPE OF
 WORK. PLEASE PROVIDE A SIGNED BONA FIDE CONTRACT. FBC
 109.3
  
 2) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC-RES SEC.
 G2413.4.1, G2413.4.2.
  
 3) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES
 G2413.4 (1 ) THROUGH G2413.4 (21).
  
 4) YOU MUST SUBMIT THE INSTALLATION MANUAL FOR THE
 GENERATOR AS THERE IS NOT A PERMIT ISSUED FOR ONE AS OF
 YET. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1
  
 5) YOU HAVE ONLY INCLUDED A SIZING CHART FOR POLY PIPE.
 POLY PIPE IS NOT PERMITTED TO BE ABOVE GROUND. SUBMIT
 TWO COPIES OF THE APPLICABLE SIZING TABLES USED TO SIZE
 THE GAS SYSTEM OR PLACE A NOTE ON THE PLANS/DRAWINGS
 SPECIFYING WHICH SIZING TABLE(S) FROM THE GAS CODE OR
 OTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS GAS
 SYSTEM. REFER TO THE 2017 FBC-FUEL GAS SECS. 401.4,
 401.8, 402.3, AND TABLES 402.4 (1) THRU 402.4 (37) OR
 2017 FBC-RES. SEC. G2413.3, G2412.8, G2413.1, G2413.2,
 & G2413.3
  
 6) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU
 LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE
 TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING
 SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING
 SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING
 SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS
 THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES.
 FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR
 SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3
  
 .
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-07-17 Cont ID  
Sent By thunt Date 2018-07-17 Time 13:39 Rev Time 0.00
Received By thunt Date 2018-07-11 Time 16:19 Sent To I
Notes
2018-07-12 16:19:58RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-30 Cont ID  
Sent By thunt Date 2018-06-30 Time 10:17 Rev Time 0.00
Received By thunt Date 2018-06-21 Time 11:34 Sent To I
Notes
2018-06-22 11:34:19PLUMB <5K