| Plan Review Stops For Permit 18060566 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-08-24 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2018-08-24 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2018-08-24 |
Time |
10:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2018-07-07 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-07-07 |
Time |
10:37 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-07-07 |
Time |
10:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2018-08-24 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2018-08-24 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2018-08-24 |
Time |
10:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2018-07-10 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2018-07-10 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2018-07-10 |
Time |
09:23 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
N |
Date |
2018-08-09 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-08-09 |
Time |
06:06 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-08-09 |
Time |
05:47 |
Sent To |
|
|
| Notes |
| 2018-08-09 06:07:32 | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | | THIS TIME. A SEPARATE GAS PERMIT IS REQUIRED FOR A | | | CONTRACTOR TO PERFORM THE RELATED WORK. PROVIDE | | | COMPLETE PLANS THAT REFLECT THE ENTIRE SCOPE OF GAS | | | WORK TO BE DONE. WPB AMEND. TO FBC SEC.107.2.1. | | | | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE | | | FBC-R, SEC. G2404.3. | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL | | | GAS SEC. 301.3. | | | | | | A SEPARATE PERMIT IS REQUIRED FOR THE GAS INSTALLATION. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2018-07-02 |
|
|
Cont ID |
|
| Sent By |
thunt |
Date |
2018-07-02 |
Time |
14:43 |
Rev Time |
0.00 |
| Received By |
thunt |
Date |
2018-07-02 |
Time |
14:43 |
Sent To |
|
|
| Notes |
| 2018-07-02 14:45:37 | 07/02/18 1ST GAS REVIEW**DENIED** | | | | | | 1) PROVIDE A MANUFACTURE INSTALLATION MANUAL. SUBMIT | | | MANUFACTURER'S SPECIFICATION SHEETS / INSTALLATION | | | MANUAL FOR ALL GAS EQUIPMENT TO VERIFY COMPLIANCE WITH | | | STANDARDS NFPA 54, NFPA 58, AND FBC-2017 FUEL GAS CODE | | | SEC. 402.2, AND 301.3 OR 2017 FBC-RES. SEC. G2404.3. | | | GAS APPLIANCES SHALL BE LISTED AND LABELED. THE | | | INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT | | | SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC | | | SEC.305.1, FBC-RES. SEC.G2408.1 | | | | | | TIM HUNT | | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER | | | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | 561-805-6695 | | | [email protected] |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-08-24 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2018-08-24 |
Time |
10:51 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2018-07-27 |
Time |
11:28 |
Sent To |
|
|
| Notes |
| 2018-08-16 10:16:05 | TO SAK DESK | | | | | | | | 2018-07-30 11:28:22 | R20 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2018-07-10 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2018-06-12 |
Time |
09:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2018-08-09 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-08-09 |
Time |
06:20 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-08-09 |
Time |
06:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-07-02 |
|
|
Cont ID |
|
| Sent By |
thunt |
Date |
2018-07-02 |
Time |
14:35 |
Rev Time |
0.00 |
| Received By |
thunt |
Date |
2018-07-02 |
Time |
14:35 |
Sent To |
|
|
| Notes |
| 2018-07-02 14:39:41 | 07/02/18 1ST PLUMBING REVIEW**DENIED** | | | | | | 1) ONLY WORK RELATED TO THE POOL ITSELF ARE PERMITTED | | | ON THIS PERMIT AND PLAN. SUMMER KITCHEN IS REQUIRED TO | | | BE ON IT'S OWN MAIN PERMIT. FBC 107.2.1. | | | | | | 2) SUPPLY GAS POOL HEATER MANUFACTURE INSTALLATION | | | MANUAL. FBC 107.2.1 | | | | | | 3) PROVIDE THE EXISTING POOL PUMP HP. CITY RECORDS WILL | | | BE CHECKED TO VERIFY. IF PUMP HP IS TO BE CHANGED | | | PLEASE SUBMIT A COMPLETE (TDH) TOTAL DYNAMIC HEAD OF | | | THE POOL PIPING SYSTEM. FBC 107.2.1 | | | | | | | | | TIM HUNT | | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER | | | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | 561-805-6695 | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2018-06-21 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-06-21 |
Time |
11:04 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-06-21 |
Time |
10:03 |
Sent To |
|
|
| Notes |
|
|