| Plan Review Stops For Permit 18060522 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-07-23 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-23 |
Time |
09:35 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-07-23 |
Time |
09:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-07-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-03 |
Time |
09:10 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-07-03 |
Time |
09:10 |
Sent To |
I |
|
| Notes |
| 2018-07-03 09:10:20 | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) PROVIDE A DETAIL OF THE POOL STAIRS SHOWING THAT | | | THEY COMPLY WITH ANSI/APSP/ICC 5 SECTION 6.2 FOR TREAD | | | DEPTH AND RISER HEIGHT. | | | | | | 2) SHOW HOW THE POOL BARRIER REQUIREMENTS OF FBC-R | | | 4501.17 WILL BE COMPLIED WITH FOR THIS PROJECT. SPECIFY | | | THE METHOD OR COMBINATION OF METHODS THAT WILL BE USED. | | | | | | 3) FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING | | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE | | | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | | ELECTRIC, PLUMBING, THE VALUATION FOR THIS PROJECT OF | | | $14,000.00 APPEARS LOW BASED ON SIMILAR PROJECTS. | | | SUBMIT A COPY OF THE SIGNED CONTRACT FO ALL OF THE POOL | | | WORK. | | | | | | 4) A POOL PLUMBING PERMIT APPLICATION IS REQUIRED TO BE | | | SUBMITTED BEFORE THE POOL PERMIT CAN BE ISSUED. FBC | | | 107.2.1 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2018-07-20 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-07-20 |
Time |
10:37 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-07-20 |
Time |
10:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2018-06-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-06-28 |
Time |
09:10 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-06-28 |
Time |
09:10 |
Sent To |
B |
|
| Notes |
| 2018-06-28 09:12:12 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | NEED TO SUBMIT FIXTURE CUT SHEETS, AND COMPLETE SETS OF | | | CUTSHEETS FOR PUMP. |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2018-06-28 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-06-28 |
Time |
06:18 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-06-28 |
Time |
05:42 |
Sent To |
|
|
| Notes |
| 2018-06-28 06:18:32 | THERE IS NO GAS ASSOCIATED WITH THIS POOL. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-07-23 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-23 |
Time |
11:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-07-11 |
Time |
15:15 |
Sent To |
|
|
| Notes |
| 2018-07-12 15:15:25 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-07-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-03 |
Time |
09:10 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-06-12 |
Time |
13:02 |
Sent To |
|
|
| Notes |
| 2018-06-13 13:02:42 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2018-07-23 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-23 |
Time |
11:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-07-23 |
Time |
10:22 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-06-28 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-06-28 |
Time |
06:17 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-06-28 |
Time |
05:42 |
Sent To |
|
|
| Notes |
| 2018-06-28 06:17:54 | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | | 7 ? 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | | FITTING ASSEMBLY (DRAIN COVER). | | | 2) FOUR SETS OF PLANS HAVE BEEN SUBMITTED BUT ONLY TWO | | | SETS HAVE PUMP SPECS.CLARIFY. | | | 3) INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS | | | APPLICABLE TO THE SPECIFIC PUMP BEING INSTALLED ON THIS | | | SYSTEM. THIS IS REQUIRED TO MATCH THE CALCULATED TDH TO | | | THE MAXIMUM SYSTEM FLOW RATE OF THE SYSTEM ON THE PUMP | | | CURVE. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2018-07-18 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-07-18 |
Time |
11:32 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-07-18 |
Time |
11:32 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2018-06-15 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-06-15 |
Time |
12:02 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-06-15 |
Time |
12:01 |
Sent To |
B |
|
| Notes |
|
|