Plan Review Details - Permit 18060482
Plan Review Stops For Permit 18060482
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-07-03 Cont ID  
Sent By rmcdouga Date 2018-07-03 Time 07:43 Rev Time 0.00
Received By rmcdouga Date 2018-07-03 Time 07:29 Sent To I
Notes
2018-07-03 07:42:59FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-07-18 Cont ID  
Sent By jleahy Date 2018-07-18 Time 10:25 Rev Time 0.00
Received By jleahy Date 2018-07-18 Time 10:25 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-06-28 Cont ID  
Sent By jleahy Date 2018-06-28 Time 15:54 Rev Time 0.00
Received By jleahy Date 2018-06-28 Time 15:54 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-06-27 Cont ID  
Sent By tklarge Date 2018-06-27 Time 13:13 Rev Time 0.00
Received By tklarge Date 2018-06-27 Time 11:51 Sent To  
Notes
2018-06-27 13:13:01THERE IS NO GAS ASSOCIATED WITH THIS POOL.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-07-24 Cont ID  
Sent By lcrespo Date 2018-07-24 Time 17:26 Rev Time 0.00
Received By lcrespo Date 2018-07-11 Time 15:12 Sent To  
Notes
2018-07-12 15:12:50RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-07-03 Cont ID  
Sent By rmcdouga Date 2018-07-03 Time 07:43 Rev Time 0.00
Received By rmcdouga Date 2018-06-11 Time 14:33 Sent To  
Notes
2018-06-12 14:33:49ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-07-24 Cont ID  
Sent By lcrespo Date 2018-07-24 Time 17:26 Rev Time 0.00
Received By lcrespo Date 2018-07-24 Time 17:26 Sent To  
Notes
2018-07-24 17:27:3007/24/18 APPROVED AND SENT TO PROCESSING, LAC

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-06-27 Cont ID  
Sent By tklarge Date 2018-06-27 Time 13:13 Rev Time 0.00
Received By tklarge Date 2018-06-27 Time 11:51 Sent To  
Notes
2018-06-27 13:12:331) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 ? 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION
 ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT
 REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED
 THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET
 FITTING ASSEMBLY (DRAIN COVER).
 2) SUBMIT A POOL PUMP CURVE THAT IS ENLARGED, CLEAR IN
 DETAIL AND LEGIBLE. WPB AMEND. TO FBC SEC. 107.2.1.
 3) IDENTIFY IN THE POOL PUMP SPECS WHICH MODEL POOL
 PUMP IS BEING INSTALLED.WPB AMEND. TO FBC SEC. 107.2.1.
 4) SUBMIT CLEAR AND LEGIBLE SPECIFICATIONS FOR THE
 CARTRIDGE FILTER. WPB AMEND. TO FBC SEC. 107.2.1.
 5) INDICATE ON THE PLANS IF THE POOL IS EQUIPPED WITH
 AN AUTO-FILL.
 6) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE HEAT
 PUMP. THE HEAT PUMP SHALL CCOMPLY WITH 2017 FBC -
 ENERGY SECS. R403.10.1, R403.10.2.
 7) THE HEAT PUMP SHALL HAVE A COP OF 4.0 WHEN TESTED IN
 ACCORDANCE WITH AHRI 1160. A TEST REPOR SHALL BE
 SUBMITTED TO VERIFY PROCEDURE COMPLIANCE. 2017
 FBC-ENERGY SEC.R403.10.5.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-06-13 Cont ID  
Sent By mcruz Date 2018-06-13 Time 11:18 Rev Time 0.00
Received By mcruz Date 2018-06-13 Time 09:38 Sent To B
Notes
***NONE***