| Plan Review Stops For Permit 18060287 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2018-06-30 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-06-30 |
Time |
14:39 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-06-30 |
Time |
14:39 |
Sent To |
|
|
| Notes |
| 2018-06-30 14:43:40 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | 1. ADVISE STATUS OF BUILDING PERMIT. IT APPEARS THAT | | | THIS IS READY FOR ISSUANCE PENDING PAYMENT OF IMPACT | | | FEES. | | | | | | DOES THIS REVISION AFFECT PAGES IN THE BUILDING PERMIT? | | | IF YES, SUBMIT THESE PAGES SO THE TWO SETS OF PERMIT | | | DOCUMENTS CORRELATE AND WE HAVE ADEQUATE TIME TO DO THE | | | REVIEW. | | | | | | 2. THREE SETS ARE REQUIRED FOR THRESHOLD PROJECTS, FBC | | | 107. | | | | | | 3. THIS REVISION WILL BE ISSUED WITH THE FOLLOWING | | | PROVISO: | | | | | | PROVISO - BELOW GRADE FOUNDATION WORK ONLY | | | ELEVATION CERTIFICATE REQUIRED PRIOR TO FINISHED FLOOR | | | POUR | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2018-07-03 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2018-07-03 |
Time |
13:47 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2018-07-03 |
Time |
11:25 |
Sent To |
|
|
| Notes |
| 2018-07-03 13:47:46 | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 | | | 6TH ED, CHAPTER 1. | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | 1. THIS REVISION IS SUBMITTED FOR PERMIT 17090199, | | | WHICH IS A FOUNDATION PERMIT. INTERIOR WIRING IS NOT | | | PERMITTED WITH A FOUNDATION PERMIT. SUBMIT REVISIONS | | | FOR THE PROPER PERMIT. WPB FBC 107.1, 107.2.1 | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | | PREVIOUSLY REVIEWED SHEETS. | | | | | | SINCERELY, | | | | | | JOHN PEARSON | | | ELECTRICAL PLANS EXAMINER | | | 561-805-6746 | | | [email protected] | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
N |
Date |
2018-06-30 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2018-06-30 |
Time |
14:34 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2018-06-30 |
Time |
14:34 |
Sent To |
|
|
| Notes |
| 2018-06-30 14:34:33 | SEE ENGINEERING PERMIT | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2018-06-12 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2018-06-12 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2018-06-11 |
Time |
17:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-07-23 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2018-07-23 |
Time |
10:53 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2018-06-07 |
Time |
15:04 |
Sent To |
|
|
| Notes |
| 2018-07-20 16:48:29 | TO LMARCHAN | | 2018-06-08 15:05:04 | C07 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-06-30 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2018-06-30 |
Time |
12:08 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2018-06-30 |
Time |
10:20 |
Sent To |
|
|
| Notes |
| 2018-06-30 12:08:22 | 1ST REVIEW: FBC 2014 5TH EDITION | | | | | | PLUMBING COMMENTS: | | | | | | 1. PLEASE PROVIDE REVISED SHTS. PF.1.1.1, PF.2.1.1, | | | PF.3.1.1, PF.3.2.1. PER WPB AMEND TO FBC 107.2.1 | | | | | | 2. PLEASE PROVIDE REVISED GREASE INTERCEPTOR SIZING | | | CALCULATIONS FROM SCHIER MANUFACTURING. PER WPB AMEND | | | TO FBC 107.2.1 | | | | | | 3. SHOW TWO WAY CLEAN OUTS BETWEEN ALL GREASE | | | INTERCEPTORS. PER MANUFACTURE INSTALLATION GUIDE AND | | | WPB UTILITIES DEPARTMENT | | | | | | 4. IT APPEARS THAT SHEETS FROM THE MASTER SET OF PLANS | | | WERE SUBMITTED INSTEAD OF SHEETS FROM THE FOUNDATION | | | SET OF PLANS PLEASE REMOVE ANY PLAN SHEETS THAT DON'T | | | PERTAIN TO THE FOUNDATION PERMIT. PER WPB AMEND TO FBC | | | 107.2.1 | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2018-07-20 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2018-07-20 |
Time |
16:47 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2018-07-20 |
Time |
16:47 |
Sent To |
|
|
| Notes |
| 2018-07-20 16:48:06 | SITE PLAN AMENDMENT MODIFICATIONS HAS NOT BEEN APPROVED | | | YET. |
|
|
|