Plan Review Details - Permit 18060272
Plan Review Stops For Permit 18060272
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-07-26 Cont ID  
Sent By rmcdouga Date 2018-07-26 Time 10:19 Rev Time 0.00
Received By rmcdouga Date 2018-07-26 Time 09:39 Sent To I
Notes
2018-07-26 10:08:34FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-06-26 Cont ID  
Sent By rmcdouga Date 2018-06-26 Time 15:41 Rev Time 0.00
Received By rmcdouga Date 2018-06-26 Time 15:26 Sent To I
Notes
2018-06-26 15:27:04FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-06-14 Cont ID  
Sent By jleahy Date 2018-06-14 Time 15:52 Rev Time 0.00
Received By jleahy Date 2018-06-14 Time 15:52 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-06-26 Cont ID  
Sent By tklarge Date 2018-06-26 Time 11:02 Rev Time 0.00
Received By tklarge Date 2018-06-26 Time 06:27 Sent To  
Notes
2018-06-26 11:03:21THERE IS NO GAS ASSOCIATED WITH THIS POOL.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-07-26 Cont ID  
Sent By rmcdouga Date 2018-07-26 Time 10:20 Rev Time 0.00
Received By rmcdouga Date 2018-07-16 Time 14:26 Sent To  
Notes
2018-07-17 14:27:04RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-26 Cont ID  
Sent By rmcdouga Date 2018-06-26 Time 15:41 Rev Time 0.00
Received By rmcdouga Date 2018-06-07 Time 13:18 Sent To  
Notes
2018-06-08 13:18:21ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-07-25 Cont ID  
Sent By lcrespo Date 2018-07-25 Time 14:11 Rev Time 0.00
Received By lcrespo Date 2018-07-25 Time 14:11 Sent To  
Notes
2018-07-25 14:35:2507/25/18 REVIEWED FOR CODE COMPLIANCE
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 PLUMBING PLAN EXAMINER, LUIS A. CRESPO
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-06-26 Cont ID  
Sent By tklarge Date 2018-06-26 Time 11:02 Rev Time 0.00
Received By tklarge Date 2018-06-26 Time 06:27 Sent To  
Notes
2018-06-26 10:59:391) SHT. 1 OF 5 AND SHT. 3 OF 5 HAS A NOTE IN THE UPPER
 LEFT CORNER OF THE DRAWING THAT STATES THE POOL PIPING
 HAS BEEN DESIGNED ON THE MAXIMUM FLOW CAPACITY OF THE
 SWIMMING POOL PUMP. PLEASE CALARIFY HOW THIS CCOMPLIES
 WITH SEC. 4.4.9 OF APSP 7-2013.
 2) SHT. 3 OF 5 - SHOWS A VELOCITY CHART PER ANSI/APSP
 -7 SEC. 4.4.I COULD NOT FIND THIS CHART IN APSP-7 2013.
 CLARIFY.
 3) SUBMIT VERIFICATION / DOCUMENTATION TO SHOW
 COMPLIANCE WITH APSP 7-2014 SEC. 4.4.9 FOR MAXIMUM
 SYSTEM FLOW RATE.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-06-11 Cont ID  
Sent By mcruz Date 2018-06-11 Time 14:47 Rev Time 0.00
Received By mcruz Date 2018-06-11 Time 14:33 Sent To B
Notes
2018-06-11 14:47:46ZONING PASSED WITH THE FOLLOWING PROVISO: SHED SHALL BE
 UNDER SEPARATE PERMIT.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved