| Plan Review Stops For Permit 18060242 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2018-08-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-08-15 |
Time |
07:20 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-08-15 |
Time |
07:20 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2018-07-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-25 |
Time |
07:24 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-07-25 |
Time |
07:21 |
Sent To |
I |
|
| Notes |
| 2018-07-25 07:34:51 | PENDING PLUMBING APPROVAL. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2018-06-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-06-25 |
Time |
18:23 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-06-25 |
Time |
18:04 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2018-08-10 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-08-10 |
Time |
07:41 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-08-10 |
Time |
07:40 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2018-06-12 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-06-12 |
Time |
14:29 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-06-12 |
Time |
14:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2018-06-25 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-06-25 |
Time |
06:24 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-06-25 |
Time |
06:22 |
Sent To |
|
|
| Notes |
| 2018-06-25 06:24:50 | THERE IS NO GAS ASSOCIATED WITH THIS POOL. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2018-08-15 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-08-15 |
Time |
07:20 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-08-06 |
Time |
13:52 |
Sent To |
|
|
| Notes |
| 2018-08-07 13:53:04 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2018-07-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-07-25 |
Time |
07:34 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-07-11 |
Time |
15:00 |
Sent To |
|
|
| Notes |
| 2018-07-12 15:00:28 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-06-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2018-06-25 |
Time |
18:24 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2018-06-06 |
Time |
10:16 |
Sent To |
|
|
| Notes |
| 2018-06-07 10:16:53 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2018-08-08 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-08-08 |
Time |
12:00 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-08-08 |
Time |
11:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2018-07-25 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-07-25 |
Time |
06:01 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-07-25 |
Time |
05:28 |
Sent To |
|
|
| Notes |
| 2018-07-25 05:57:40 | 1) THE SUBMITTED TDH CALCULATIONS DO NOT APPEAR TO SHOW | | | THE FRICTION LOSS THROUGH ALL THE SYSTEM CCOMPONENTS. | | | THE CALCULATOR SHOWS THE PIPE, FITTINGS, VALVES, | | | HEATER, FILTER, ETC. BUT THERE IS NO FRICTION LOSS | | | ASSOCIATED WITH THESE ITEMS.CLARIFY. | | | 2) INDICATE ON THE PUMP CURVE WHICH KEY CURVE IS FOR | | | THE PUMP BEING INSTALLED ON THIS SYSTEM. WPB AMEND. TO | | | FBC SEC. 107.2.1. | | | 3) SUBMIT TWO COPIES OF AN ENLARGED POOL PUMP CURVE. | | | THE PRINTING IS ILLEGIBLE ON THE ONE ON THE PLANS. | | | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC | | | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS | | | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH | | | CALCULATIONS.2ND REQUEST. | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-06-25 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-06-25 |
Time |
08:30 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-06-25 |
Time |
06:19 |
Sent To |
|
|
| Notes |
| 2018-06-25 06:58:44 | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | | 7 ? 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | | FITTING ASSEMBLY (DRAIN COVER). | | | 2) SUBMIT TWO COPIES OF THE MANUFACTURER'S | | | SPECIFICATIONS FOR THE MAIN DRAIN COVER. WPB AMEND. TO | | | FBC SEC. 107.2.1. | | | 3) INDICATE ON THE PUMP CURVE WHICH KEY CURVE IS FOR | | | THE PUMP BEING INSTALLED ON THIS SYSTEM. WPB AMEND. TO | | | FBC SEC. 107.2.1. | | | 4) GENERAL NOTES PAGE - NOTE #8 - THE INFORMATION IN | | | THIS NOTE IS FROM THE 2006 EDITION OF APSP 7. THE 2013 | | | EDITION IS IN EFFECT FOR THIS POOL. EITHER REVISE THE | | | NOTE TO REFLECT THE CURRENT LANGUAGE IN APSP 7 SEC. | | | 4.4.9 OR DELETE THE NOTE. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2018-06-08 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2018-06-08 |
Time |
15:31 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2018-06-08 |
Time |
15:26 |
Sent To |
B |
|
| Notes |
| 2018-06-08 15:31:24 | NOTE - POOL EQUIPMENT SHALL BE AT LEAST 6 FEET FROM | | | SIDE PROPERTY LINE. | | | | | | MAGGIE CRUZ | | | ASSOCIATE PLANNER | | | PLANNING AND ZONING DEPARTMENT | | | TEL: 561-822-1442 | | | E-MAIL: [email protected] |
|
|