Plan Review Details - Permit 18051199
Plan Review Stops For Permit 18051199
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-07-19 Cont ID  
Sent By jleahy Date 2018-08-15 Time 08:09 Rev Time 0.00
Received By rmcdouga Date 2018-07-19 Time 13:29 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-06-22 Cont ID  
Sent By rmcdouga Date 2018-06-22 Time 15:23 Rev Time 0.00
Received By rmcdouga Date 2018-06-22 Time 14:42 Sent To I
Notes
2018-06-22 14:56:01FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-08-15 Cont ID  
Sent By jleahy Date 2018-08-15 Time 11:55 Rev Time 0.00
Received By jleahy Date 2018-07-19 Time 11:55 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-06-08 Cont ID  
Sent By jleahy Date 2018-06-08 Time 10:18 Rev Time 0.00
Received By jleahy Date 2018-06-08 Time 10:18 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-06-02 Cont ID  
Sent By tklarge Date 2018-06-02 Time 06:07 Rev Time 0.00
Received By tklarge Date 2018-06-02 Time 05:43 Sent To  
Notes
2018-06-02 06:07:42A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT IS REQUIRED FOR A
 CONTRACTOR TO PERFORM THE RELATED WORK. PROVIDE
 COMPLETE PLANS THAT REFLECT THE ENTIRE SCOPE OF GAS
 WORK TO BE DONE. WPB AMEND. TO FBC SEC.107.2.1.
  
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE
 FBC-R, SEC. G2404.3.
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL
 GAS SEC. 301.3.
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-07-25 Cont ID  
Sent By lcrespo Date 2018-07-25 Time 15:39 Rev Time 0.00
Received By lcrespo Date 2018-07-17 Time 15:07 Sent To  
Notes
2018-07-18 15:07:50RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-07-10 Cont ID  
Sent By tklarge Date 2018-07-10 Time 13:17 Rev Time 0.00
Received By tklarge Date 2018-07-03 Time 15:52 Sent To  
Notes
2018-07-05 15:52:23RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-22 Cont ID  
Sent By rmcdouga Date 2018-06-22 Time 15:23 Rev Time 0.00
Received By rmcdouga Date 2018-05-24 Time 11:10 Sent To  
Notes
2018-05-25 11:10:56ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 3 Status P Date 2018-07-25 Cont ID  
Sent By lcrespo Date 2018-07-25 Time 15:39 Rev Time 0.00
Received By lcrespo Date 2018-07-25 Time 15:39 Sent To  
Notes
2018-07-25 15:40:5207/25/18 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 PLUMBING PLAN EXAMINER, LUIS A. CRESPO
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-07-10 Cont ID  
Sent By tklarge Date 2018-07-10 Time 13:16 Rev Time 0.00
Received By tklarge Date 2018-07-10 Time 11:38 Sent To I
Notes
2018-07-10 13:16:001) THE TDH CALCULATIONS AND THE PUMP CURVE ARE BARELY
 LEGIBLE ON PAGE 4. THE PUMP MODELS ARE ILLLEGIBLE.
 SUBMIT A LEGIBLE POOL PUMP CURVE FOR REVIEW. WPB AMEND.
 TO FBC SEC. 107.2.1.
 2) THE CALCULATIONS SHOW A TDH OF 47.90 FT. TDH. THE
 TDH OF THE PUMP CURVE FOR THE PUMP TO BE INSTALLED
 APEARS TO SHOW THE PUMP CURVE STARTING AT 20 TDH.PLEASE
 CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-06-02 Cont ID  
Sent By tklarge Date 2018-06-02 Time 06:07 Rev Time 0.00
Received By tklarge Date 2018-06-02 Time 05:43 Sent To  
Notes
2018-06-02 06:07:131) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 ? 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION
 ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT
 REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED
 THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET
 FITTING ASSEMBLY (DRAIN COVER).
 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE MAIN
 DRAIN AND FOR THE PUMP. WPB AMEND. TO FBC SEC. 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-05-30 Cont ID  
Sent By mcruz Date 2018-05-30 Time 15:44 Rev Time 0.00
Received By mcruz Date 2018-05-30 Time 15:38 Sent To B
Notes
2018-05-30 15:44:42NOTE - POOL EQUIPMENT SHALL BE AT LEAST 3.5 FEET FROM
 SUIDE PROPERTY LINES.